Documented information
The single term used in ISO management system standards to cover both documents that must be maintained and records that must be retained, replacing the older separate terms.
Process approach
Managing activities as interrelated processes with defined inputs, outputs, sequence, interaction, performance indicators, and assigned responsibility, so that system results are predictable and improvement is measurable.
Risk-based thinking
A way of working that considers uncertainty and its potential effects when planning and operating the management system, rather than a separate clause or a formal risk register requirement.
Major nonconformity
A finding showing the management system is not effectively implemented, such as a missing required process, systemic failure, or a lapse that creates significant risk to product or service conformity.
Minor nonconformity
An isolated or single lapse in the management system that does not indicate a systemic breakdown and does not by itself undermine the effectiveness of the control being audited.
Stage 1 audit
The first certification audit stage, performed to review readiness for Stage 2 by examining documented information, context, scope, and whether key processes and internal audits are in place.
Context of the organization
Clause 4 requirement to determine external and internal issues, interested parties and their relevant requirements, and the scope and boundaries of the management system.
Management review inputs
Clause 9.3 requires reviewing prior actions, changes, performance trends, audit results, nonconformities, corrective actions, and interested party feedback, and recording outputs and decisions.
Hierarchy of controls
The ordered preference for risk control: eliminate the hazard, substitute, use engineering controls, apply administrative controls including training, and finally use personal protective equipment.
Worker consultation
Clause 5.4 requirement that workers be consulted on hazard identification, risk assessment, incident investigation, and OH&S decisions, with participation mechanisms established and barriers removed.
Hazard identification inputs
Clause 6.1.2.1 inputs include routine and non-routine activities, emergency situations, human factors, past incidents, work organization, and social factors affecting the OH&S system.
OH&S opportunity
A circumstance or set of circumstances that can lead to improved OH&S performance, such as a design change that removes a hazard rather than merely controlling exposure.
Incident investigation
Clause 10.2 requires reporting, investigating, and acting on incidents and near misses in a timely manner, with worker participation and retention of documented results.
Emergency preparedness testing
Clause 8.2 requires planned responses to potential emergency situations, periodic testing of those responses, and review and revision after tests or actual emergencies.
Contractor coordination
Clause 8.1.4 requires the organization to coordinate with contractors and ensure outsourced processes meet OH&S requirements, retaining control of the activity.
Legal compliance evaluation
Clause 9.1.2 requires evaluating fulfilment of legal and other requirements at planned intervals, with results retained and used as management review input.
Environmental aspect
An element of an organization's activities, products, or services that interacts or can interact with the environment, such as emissions, waste generation, or water use.
Significant environmental aspect
An aspect that has or can have a significant environmental impact, determined using established criteria, and which drives operational controls, monitoring, and communication.
Compliance obligations
The 2015 term for legal requirements and other requirements the organization must comply with, which must be determined, accessible, and evaluated for fulfilment.
Life-cycle perspective
Consideration of environmental aspects across raw material acquisition, design, production, transport, use, end-of-life treatment, and disposal, proportionate to control and influence.
Environmental performance
The measurable results of the organization's management of its environmental aspects, tracked through monitoring, measurement, and analysis and used to evaluate system effectiveness.
Operational control
Clause 8.1 requires controls for processes needed to meet environmental requirements, including engineering and procedural controls, and controls over outsourced processes.
Environmental emergency response
Clause 8.2 requires identifying potential emergency situations, planning responses, testing them, and reviewing and revising the plan after tests or actual events.
Environmental condition
A state or characteristic of the environment, such as air quality or water level, which may be affected by the organization's aspects and which the organization may monitor.
Prerequisite programme
Basic hygiene and operational conditions implemented before HACCP controls, covering premises, water, pest control, cleaning, personnel hygiene, and maintenance, as specified in ISO/TS 22002-1.
Operational prerequisite programme
A control measure applied to prevent contamination or proliferation of a significant food safety hazard, without a measurable critical limit, managed through defined monitoring and correction.
Critical control point
A step where a control measure with a validated critical limit is applied to prevent, eliminate, or reduce a significant food safety hazard to an acceptable level.
Critical limit
A measurable value separating acceptability from unacceptability at a critical control point, which must be validated before use and monitored at a defined frequency.
Hazard analysis
The process of identifying biological, chemical, and physical hazards, including allergens, and evaluating their significance using severity and likelihood to select control measures.
Validation versus verification
Validation confirms before implementation that control measures can achieve the intended hazard control; verification confirms after implementation that the food safety management system is working effectively.
Traceability system
Clause 8.3 requires identifying lots, linking raw materials to finished product and distribution, and retaining records for the defined retention period beyond shelf life.
Withdrawal and recall
A documented procedure to notify affected parties and recover unsafe product, tested at planned intervals, with records retained and results used to improve the system.