Craftsman Motor Vehicles Body Repair study materials
Craftsman Motor Vehicles Body Repair study resources

Craftsman Motor Vehicles Body Repair study plan

Craftsman Motor Vehicles Body Repair · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Panel Removal, Replacement, and Alignment & Safety, Tools, and Shop Practice

  • Map every panel on a practice vehicle (or diagram set) and label attachment method, fastener type, and adjustment point for each.

  • Demonstrate and document a safe vehicle support sequence: lift points, jack stands, wheel chocks, and battery/airbag disconnect before panel work.

  • Practice removing and reinstalling one bolted front fender and one door, then record gap and flush measurements before and after.

  • Build a personal PPE and ventilation checklist covering isocyanate paints, welding fume, and dust-generating sanding, and post it at the work area.

  • Explain out loud the sequence for a bolt-on panel replacement from estimate review to final gap check, noting where a second person or lift is required.

Your checkpoint

A labeled panel-map sheet plus a before/after gap-and-flush measurement log for the fender and door you removed and reinstalled.

Week 2

Panel Removal, Replacement, and Alignment & Metal Straightening, Shrinking, and Stretching

  • Diagnose panel misalignment causes (hinge wear, bent mounting point, frame shift) and write the decision rule you would use for each.

  • Practice door and hood adjustment on a salvage panel, hitting a target gap within 1 mm on at least three sides.

  • Straighten a dented steel panel using hammer-and-dolly technique, then judge when the metal is work-hardened and needs shrinking.

  • Demonstrate heat shrinking with a torch or stud gun on a stretched area and verify the panel returns to contour with a straightedge.

  • Compare a stud welder pull, a glue pull, and a conventional pull on a practice panel and record which damage type suits each.

Your checkpoint

A one-page alignment and metal-finishing decision chart you wrote yourself, backed by photos of three practice repairs with measured gap results.

Week 3

Frame, Unibody, and Structural Straightening & Vehicle Construction, Materials, and Collision Damage Analysis

  • Identify the structural components of a unibody and a body-on-frame vehicle on a diagram and state the load path each carries in a front and a rear impact.

  • Classify collision damage as direct, induced, or inertia-related using a written damage report or a practice vehicle, listing at least five observations per category.

  • Locate and interpret the OEM collision repair information, sectioning locations, and weld/Adhesive bonding specs for one vehicle model.

  • Explain measuring-system types (universal, dedicated, laser, computerized 3D) and state when each is appropriate.

  • Describe the sequence for a structural pull: anchoring, measuring, pulling, stress-relieving, and re-measuring, and identify the safety limits on pull force.

Your checkpoint

A written damage analysis of one vehicle (real or case study) that names structural parts, classifies damage, and cites the OEM sectioning and measuring requirements.

Week 4

Frame, Unibody, and Structural Straightening & Welding, Cutting, and Panel Bonding

  • Set up a squeeze-type resistance spot welder on scrap steel and produce a test coupon that passes a destructive peel test.

  • Produce MIG/MAG plug and stitch welds on 0.8 mm and 1.2 mm steel and record settings that give full penetration without burn-through.

  • Compare panel bonding adhesive, rivet bonding, and spot welding for a specified joint and justify a choice using OEM guidance.

  • Demonstrate safe cutting with a plasma cutter or cut-off wheel, including fume control, fire watch, and hot-work permit practice.

  • Explain how to preserve corrosion protection at a welded or bonded joint (weld-through primer, seam sealer, cavity wax) and where each product goes.

Your checkpoint

A weld-and-bond test coupon board with at least four labeled samples (spot, plug, stitch, bonded/riveted) and a settings log for each.

Week 5

Body Filler, Plastic, and Composite Repair & Surface Preparation, Priming, and Refinishing

  • Prepare a bare-steel panel through the correct grit sequence and apply body filler within the recommended window, then shape and finish it without sanding through.

  • Repair a plastic bumper cover using the correct identification method, plastic welding or adhesive, and reinforcement backing.

  • Repair a composite panel (SMC or fiberglass) using the appropriate resin and explain why the wrong resin fails.

  • Identify the substrate on three unknown panels using visual, magnet, and sanding tests, and select the correct primer and topcoat system for each.

  • Apply primer, block-sand, and seal a panel, then document film build and any defects you corrected.

Your checkpoint

A finished practice panel (filler, primer, sealed) with a substrate-identification record and a defect log showing what you fixed.

Week 6

Metal Straightening, Shrinking, and Stretching & Surface Preparation, Priming, and Refinishing

  • Execute a full refinish on a practice panel: clean, sand, prime, seal, base coat, clear coat, and polish, meeting the product data sheet times.

  • Diagnose and correct at least three finish defects (orange peel, runs, solvent pop, fish eyes) and explain the cause of each.

  • Blend a base coat into an adjacent panel and color-match using a spray-out card.

  • Apply heat shrinking and stretching knowledge to correct a stretched panel before refinishing, and verify with a straightedge.

  • Set up and maintain a clean spray environment, including gun cleaning, filter checks, and booth or temporary-booth airflow.

Your checkpoint

A completed refinish panel with a color spray-out card and a written defect-cause-and-correction log for every defect you encountered.

Week 7

Estimating, Work Orders, and Customer Communication & Glass, Trim, Hardware, and Interior Components

  • Write a complete repair estimate for one vehicle using a damage analysis, including parts, labor, refinish, and a supplement scenario.

  • Draft a customer-facing explanation of a structural repair limitation and a documented conversation about a hidden-damage supplement.

  • Remove and reinstall a windshield or bonded glass using the correct urethane and safe-drive-away time, or document the procedure in detail.

  • Remove and reinstall interior trim and hardware without breaking clips, and record the order and clip types used.

  • Explain the legal and ethical limits on what you may tell a customer about safety systems and structural integrity.

Your checkpoint

A sample estimate plus a one-page customer communication script covering a hidden-damage supplement and a safety-system limitation.

Week 8

Safety, Tools, and Shop Practice & Vehicle Construction, Materials, and Collision Damage Analysis & Estimating, Work Orders, and Customer Communication & Panel Removal, Replacement, and Alignment & Metal Straightening, Shrinking, and Stretching & Body Filler, Plastic, and Composite Repair & Welding, Cutting, and Panel Bonding & Frame, Unibody, and Structural Straightening & Surface Preparation, Priming, and Refinishing & Glass, Trim, Hardware, and Interior Components

  • Complete a timed full-length practice exam and score every domain separately.

  • Re-study your two lowest-scoring domains and write a one-page summary of each from memory.

  • Review all safety rules (hot work, ventilation, PPE, vehicle support, high-voltage and airbag precautions) and correct any gaps in your checklist.

  • Rehearse the repair-order sequence for a full collision repair, from teardown to delivery, and identify where each domain enters.

  • Build a final one-page quick-reference sheet of formulas, settings, and sequences you will review the day before the exam.

Your checkpoint

A scored practice exam with a per-domain breakdown and a final one-page quick-reference sheet covering all ten domains.

Milestones

Week 2: You can remove, reinstall, and align a bolted panel to within 1 mm and can explain when a dented panel needs shrinking rather than more hammering.

Week 4: You have a labeled coupon board with passing spot, plug, stitch, and bonded samples, and you can describe the structural pull sequence and measuring options from memory.

Week 6: You have completed a refinished practice panel with a color spray-out card and have corrected at least three finish defects with documented causes.

Week 8: You have a scored full-length practice exam with per-domain results, and every domain below your target has a written one-page review summary.