Craftsman Bio Process flashcards
Craftsman Bio Process · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Dew point margin
- The substrate temperature must exceed the dew point by at least 3 C before coating. A smaller margin allows condensation to form on the surface and causes poor adhesion or blistering.
- Substrate moisture content
- Water present in wood or masonry, measured with a calibrated meter. Excess moisture trapped under a bio coating causes blistering, peeling, and delayed cure.
- Mill scale removal
- A flaky oxide layer on new steel that must be removed before coating. Bio coatings cannot bond reliably to mill scale, which later breaks away and takes the film with it.
- Pot life
- The usable time after mixing a two-component coating before it becomes too thick to apply. It shortens as temperature rises and is not extended by adding thinner.
- Mixing ratio by weight
- The proportion of base to hardener stated on the product data sheet. Weighing rather than measuring by volume prevents cure failures caused by small ratio errors.
- Shelf life of bio coatings
- The period a sealed container remains usable when stored in the stated temperature range. Expired material may not cure or may show separation and must be rejected.
- Masking before application
- Covering adjacent surfaces that should not be coated. Bio coatings cure hard and are difficult to remove from glass, metal, or finished surfaces after the fact.
- Surface profile
- The roughness created by abrasive preparation, measured in microns. Too smooth a profile reduces mechanical key; too rough a profile can leave peaks exposed above the film.
- Wet film to dry film
- Wet film thickness equals dry film thickness divided by the volume solids fraction. A 60 percent solids coating at 100 micron dry film needs about 167 micron wet film.
- Recoat window
- The time interval during which a second coat bonds chemically to the first. Exceeding it requires abrasion of the surface before recoating to restore adhesion.
- Wet edge
- The still-fluid boundary of a brushed or rolled section. Keeping it wet prevents lap marks where fresh coating meets material that has already begun to set.
- Spray tip selection
- The nozzle size chosen to match coating viscosity. High-solids bio coatings typically need a 1.8 to 2.5 mm tip for an even pattern without spitting.
- Two thin coats rule
- Applying two coats within the specified thickness range gives better coverage and fewer defects than one thick coat, which risks solvent entrapment, runs, and blistering.
- Flash-off time
- The interval between application and the point when solvent has largely evaporated. Insufficient flash-off before baking or recoating traps solvent and causes pinholes.
- Gentle stirring
- Mixing bio coatings slowly by hand or with a low-shear paddle. High-shear mixing pulls air into the product, producing foam and pinholes in the cured film.
- Maximum surface temperature
- The upper limit, often 35 C, above which application should stop. Hot surfaces cause rapid drying, uneven flash-off, and visible lap or blister defects.
- Tool cleaning
- Washing brushes and rollers with the cleaner named on the data sheet immediately after use. Once a bio coating cures, it cannot be dissolved from tools.
- Dry film thickness gauge
- A magnetic or eddy-current instrument that measures cured coating thickness on metal. Readings are averaged across the area to confirm the specified range is met.
- Cross-cut adhesion test
- A lattice of cuts through the film, covered with tape and pulled off. The result is graded 0 for no loss to 5 for heavy detachment.
- Pull-off adhesion test
- A loaded dolly glued to the coating is pulled until failure. The recorded value and failure mode show whether the coating or the substrate bond failed.
- Solvent rub test
- Rubbing the cured film with a solvent-soaked cloth to check cure. Softening or color on the cloth indicates the coating has not fully cured.
- Holiday detection
- A high-voltage spark test on conductive substrates that reveals pinholes and thin spots. Voltage is set according to the coating thickness being inspected.
- Nonconformity
- Any measured or observed result outside the acceptance criteria, such as thickness below the specified minimum. It must be recorded, repaired, and re-inspected.
- Visual defect log
- A record of runs, sags, pinholes, orange peel, and misses, each with location and size. It supports repair decisions and later certification review.
- Ambient condition record
- Temperature and humidity logged at the start, middle, and end of each session. These readings show whether the coating was applied within the allowed envelope.
- Acceptance criteria
- The measurable limits, such as thickness range and adhesion grade, agreed before work begins. Results are judged against them, so they must be written and unambiguous.
- Certification evidence package
- The collected preparation records, batch numbers, application logs, and inspection results. A certificate is issued only when this package is complete and criteria are met.
- Batch traceability
- Linking each coating batch number to the location and date where it was applied. It allows later investigation if a defect appears in a specific area.
- Inspector qualification
- The current credential held by the person performing inspection. An expired qualification invalidates the inspection record for certification purposes.
- Repair re-inspection
- A repaired area is assessed by the same protocol as new work. It is not automatically certified on the basis of the repair alone.
- Written deviation approval
- Permission to depart from the specification, granted in writing before work proceeds. Verbal approval is not accepted as evidence during certification review.
- Record retention period
- The time certification documents must be kept after project completion, commonly set by contract at 5 to 10 years. It supports later warranty or dispute claims.