Chemical Process Principles and Thermodynamics

  • Steady-state energy balance for open system: Q − W = Σ n_out h_out − Σ n_in h_in + ΔKE + ΔPE; set ΔKE and ΔPE to zero for most process streams.

  • Ideal gas: PV = nRT with R = 8.314 J/(mol·K) = 8.314 kPa·m³/(kmol·K); at 1 atm and 0 °C molar volume is 22.414 L/mol.

  • Raoult's law for ideal mixtures: p_i = x_i·P_i^sat; dew point is reached when Σ (y_i·P)/P_i^sat = 1 and bubble point when Σ x_i·P_i^sat = P.

  • Modified Raoult's law uses γ_i from an activity-coefficient model (Margules, van Laar, NRTL, UNIQUAC); γ_i > 1 indicates positive deviation from ideality.

  • Gibbs phase rule: F = C − P + 2; for a reacting system use F = C − P + 2 − r where r is the number of independent reactions.

  • Clausius–Clapeyron: ln(P₂/P₁) = −(ΔH_vap/R)(1/T₂ − 1/T₁); plot ln P vs 1/T to obtain ΔH_vap from the slope.

  • Second law: ΔS_total = ΔS_system + ΔS_surroundings ≥ 0; isentropic efficiency of a compressor is η = (h₂s − h₁)/(h₂ − h₁).

  • Exergy (availability) destruction equals T₀·ΔS_gen; minimum work of separation is the reversible work calculated from chemical potentials, not the actual work.

Quick reference

Reaction Engineering and Catalysis

  • Arrhenius: k = A·exp(−E_a/RT); doubling k for a 10 K rise implies E_a ≈ 53 kJ/mol near 300 K (rule of thumb, not exact).

  • Batch design equation: t = N_A0 ∫ dX/(−r_A·V); plug flow: V = F_A0 ∫ dX/(−r_A); CSTR: V = F_A0·X/(−r_A).

  • First-order conversion in a CSTR: X = kτ/(1 + kτ); in a PFR: X = 1 − exp(−kτ).

  • Selectivity = (moles desired product)/(moles undesired product); yield = moles desired product formed per mole of key reactant fed.

  • Langmuir–Hinshelwood rate: r = k·K_A·p_A/(1 + K_A·p_A + K_B·p_B); high K·p gives zero-order behavior, low K·p gives first-order.

  • Thiele modulus φ = L·√(k/D_eff); effectiveness factor η = tanh φ/φ for a first-order slab; η → 1/φ when φ > 3 (strong pore diffusion limit).

  • Catalyst deactivation: activity a(t) = k(t)/k₀; first-order decay a = exp(−k_d·t), and for a CSTR with decay, X depends on time on stream.

  • Levenspiel plot (1/−r_A vs X): reactor volume is the area under the curve for PFR and rectangle area for CSTR; CSTR is favored at high X for autocatalytic or inhibited kinetics.

Quick reference

Unit Operations and Separation Processes

  • Fenske: N_min = ln[(x_D/(1 − x_D))·((1 − x_B)/x_B)]/ln α; Underwood gives minimum reflux; Gilliland correlates actual stages to N_min and R_min.

  • McCabe–Thiele operating lines: rectifying y = (R/(R+1))x + x_D/(R+1); q-line slope = q/(q − 1) where q is feed thermal condition.

  • Kremser equation for absorption/stripping: N = ln[(1 − 1/A)(y_in − y_out*)/(y_out − y_out*) + 1/A]/ln A, with absorption factor A = L/(m·V).

  • Liquid–liquid extraction: distribution coefficient K = y/x; extraction factor E = K·V_organic/V_aqueous; % recovery = (E − 1)/(E^(n+1) − 1) style expressions for cross-current stages.

  • Drying: constant-rate period rate is set by external heat/mass transfer; falling-rate period follows diffusion control; critical moisture content marks the transition.

  • Filtration: constant-pressure cake filtration follows V² vs t linearity (Ruth equation); specific cake resistance rises with compressibility coefficient s.

  • Heat exchanger: Q = U·A·ΔT_lm·F; LMTD correction factor F < 1 for multipass and crossflow; effectiveness–NTU method used when outlet temperatures are unknown.

  • Centrifugal pump: NPSH_available = (p_suction − p_vapor)/(ρg) + z − h_f; cavitation occurs when NPSH_available < NPSH_required.

Quick reference

Process Design, Simulation and Optimization

  • Sequential-modular simulators solve unit models in flowsheet order with recycle loops handled by tearing and successive substitution or Wegstein acceleration.

  • Degrees of freedom (Gibbs): F = 2 − π + C − r for a single-phase system; a flowsheet is fully specified when all design variables are fixed and the model is not over- or under-specified.

  • Pinch analysis: minimum utility targets from the composite curve; pinch temperature is where hot and cold composite curves are closest; ΔT_min trades capital against energy cost.

  • Optimization: set ∂f/∂x_i = 0 subject to constraints; use Lagrange multipliers for equality constraints and KKT conditions for inequality constraints.

  • Economic pipe diameter scales roughly as D ∝ Q^0.45–0.5; capital cost rises with diameter while pumping cost falls, giving a minimum total cost.

  • Heat exchanger network design rule: do not transfer heat across the pinch; number of units target is N − 1 + loops for a network with N streams.

  • Process flow diagram (PFD) shows major equipment and streams; piping and instrumentation diagram (P&ID) adds instruments, control loops, line sizes and valves.

  • Scale-up: geometric similarity, constant tip speed vs constant power per unit volume for agitators; mixing time scales differently from mass transfer coefficient.

Quick reference

Process Control and Instrumentation

  • PID controller: u(t) = K_c·e(t) + (K_c/τ_I)∫e dt + K_c·τ_D·de/dt; integral action removes offset, derivative action anticipates error.

  • First-order process with dead time: G(s) = K·e^(−θs)/(τs + 1); Ziegler–Nichols and Cohen–Coon tuning use K, τ, θ from a step test.

  • Closed-loop stability: poles of the characteristic equation must lie in the left half-plane; Routh array or Nyquist criterion determines stability for higher-order systems.

  • Control valve sizing: C_v = Q·√(SG/ΔP); choked flow occurs when ΔP exceeds about 0.5·P₁ for liquids (vapor pressure limits).

  • Flow measurement: orifice plate has a square-root relationship between flow and differential pressure; Coriolis meter measures mass flow directly via phase shift.

  • Cascade control uses a fast inner loop (flow) and slower outer loop (temperature); ratio control maintains a fixed ratio of two flows.

  • Dead time dominates control difficulty: θ/τ ratio > 1 makes feedback control difficult; feedforward or model predictive control is preferred.

  • Instrumentation: 4–20 mA current loop is standard; 4 mA is live zero for fault detection; HART superimposes digital signal on the analog loop.

Quick reference

Plant Safety, Risk Management and HSE

  • HAZOP uses guide words (no, more, less, reverse, as well as, part of, other than) applied to process parameters at nodes to identify deviations.

  • Layer of protection analysis (LOPA): risk reduction factor = initiating frequency × consequence / tolerable frequency; independent protection layers must be independent and auditable.

  • Safety integrity level (SIL) is tied to probability of failure on demand: SIL 1 = 10⁻¹–10⁻², SIL 2 = 10⁻²–10⁻³, SIL 3 = 10⁻³–10⁻⁴ (PFD average).

  • Flammability: LFL and UFL bound the flammable range; adding inert gas narrows the range; flash point is the temperature at which vapor pressure reaches the LFL.

  • Dust explosions require five conditions: fuel, oxygen, ignition, dispersion and confinement; K_st and P_max characterize dust explosibility.

  • Relief valve sizing for gas: use the ideal-gas isentropic flow equation with critical pressure ratio (P₂/P₁ ≈ 0.528 for air); for liquids use the API 520 liquid sizing equation.

  • Bow-tie analysis links threats to a top event through preventive barriers and to consequences through mitigative barriers.

  • Risk = likelihood × consequence; ALARP principle requires risk to be as low as reasonably practicable, with cost–benefit justification for further reduction.

Quick reference

Environmental Protection and Sustainability

  • CO₂ emissions from fuel combustion: mass CO₂ = fuel mass × carbon fraction × (44/12); natural gas ≈ 2.0 kg CO₂ per kg fuel, coal ≈ 2.5–3.0.

  • Wastewater: BOD₅ measures biodegradable organic load over 5 days at 20 °C; COD measures total oxidizable matter; BOD/COD ratio > 0.4 suggests good biodegradability.

  • Air dispersion: Gaussian plume model C(x,y) = Q/(2πσ_yσ_z u)·exp(−y²/2σ_y²)·[exp(−(z−H)²/2σ_z²) + exp(−(z+H)²/2σ_z²)].

  • Stack height and plume rise: effective stack height H = h_stack + Δh; ground-level concentration falls roughly with 1/H².

  • Scrubber efficiency: η = (C_in − C_out)/C_in; absorption of acid gases (SO₂, HCl) with alkaline solution is the common control method.

  • Life cycle assessment stages: goal and scope, inventory analysis, impact assessment, interpretation; functional unit is the basis for comparison.

  • Carbon capture: amine absorption (MEA) captures CO₂ from flue gas; regeneration energy is the main cost driver; capture efficiency often 85–95%.

  • Sustainability metrics: carbon intensity (kg CO₂e per tonne product), water footprint, and energy intensity are standard reporting measures.

Quick reference

Materials, Corrosion and Mechanical Integrity

  • Carbon steel is the default material; stainless steel 304 (18% Cr, 8% Ni) resists oxidation but is susceptible to chloride stress-corrosion cracking; 316 adds 2–3% Mo for chloride resistance.

  • Galvanic corrosion requires dissimilar metals in contact with an electrolyte; the more active metal (lower in the galvanic series) corrodes; avoid large cathode-to-anode area ratios.

  • Pitting resistance equivalent number (PREN) = %Cr + 3.3·%Mo + 16·%N; higher PREN means better chloride pitting resistance.

  • Nelson curves give temperature limits for hydrogen attack in carbon steel; above the curve, hydrogen reacts with carbides to form methane, causing blistering and cracking.

  • ASME B31.3 gives allowable stress and wall thickness for process piping: t = P·D/(2·S·E + P·Y) + corrosion allowance.

  • Corrosion allowance is added to minimum wall thickness; remaining life = (t_actual − t_required)/corrosion rate.

  • Hydrogen embrittlement affects high-strength steels; sulfide stress cracking occurs in wet H₂S service above a partial pressure of about 0.05 psi (NACE MR0175).

  • Mechanical integrity: API 570 covers piping inspection, API 510 pressure vessels, API 653 storage tanks; inspection intervals are set by corrosion rate and remaining life.

Quick reference

Economics, Project Management and Engineering Ethics

  • Capital cost estimate classes: order-of-magnitude (±30–50%), study (±30%), preliminary (±20%), definitive (±10%), detailed (±5%).

  • Six-tenths rule: C₂ = C₁·(Q₂/Q₁)^0.6 for equipment cost scaling; the exponent varies (0.4–0.9) by equipment type.

  • Payback period = fixed capital investment / annual net cash flow; simple and useful but ignores time value of money.

  • Net present value: NPV = Σ (cash flow_t)/(1 + i)^t − initial investment; positive NPV means the project earns above the discount rate.

  • Internal rate of return is the discount rate at which NPV = 0; IRR is compared to the hurdle rate (often 10–15% for chemical projects).

  • Engineering ethics: paramount obligation is public safety and health; engineers must report hazards, avoid conflicts of interest, and maintain competence.

  • Project schedule: critical path is the longest path through the network; any delay on the critical path delays the project; float is slack on non-critical paths.

  • Break-even point in units = fixed costs / (unit price − unit variable cost); contribution margin is the denominator.

Quick reference

Professional Practice and Regulatory Compliance

  • OSHA Process Safety Management (PSM) applies to processes with highly hazardous chemicals above threshold quantities, flammable liquids ≥ 10,000 lb, or flammable gases ≥ 10,000 lb.

  • EPA Risk Management Program (RMP) requires hazard assessment, prevention program and emergency response; three program levels based on quantity and offsite impact.

  • Clean Air Act Title V operating permits apply to major sources; New Source Review applies to modifications that increase emissions significantly.

  • RCRA governs hazardous waste from cradle to grave; generator status depends on monthly quantity (large, small, very small).

  • REACH (EU) requires registration of substances above 1 tonne/year; SDS and labeling follow GHS/CLP classification.

  • Piping and equipment codes: ASME Boiler and Pressure Vessel Code (Section VIII for pressure vessels), ASME B31.3 for process piping, API 650 for storage tanks.

  • Management of change (MOC) is required before altering process chemicals, technology, equipment or procedures; pre-startup safety review (PSSR) is required before introducing hazardous chemicals.

  • Professional registration and codes of conduct require competence only in areas of expertise, continuing education, and truthful reporting of data and test results.

Quick reference

Materials Selection and Corrosion Prevention

  • Cathodic protection: sacrificial anode (galvanic) or impressed current; protection potential for steel in soil is about −0.85 V vs Cu/CuSO₄ reference.

  • Corrosion rate (mpy) = 0.128 × (weight loss in g) × 1000 / (density × area in cm² × time in hours) - verify units against the standard formula used in your reference.

  • Erosion–corrosion is accelerated by high velocity and turbulence; keep flow velocities below the critical velocity for the material and service.

  • Stress-corrosion cracking of stainless steel in chlorides is mitigated by reducing stress, lowering temperature, or selecting duplex or higher-Mo alloys.

  • Coatings and linings provide barrier protection; holiday (coating defect) detection is critical for buried pipelines.

  • Material selection considers corrosion resistance, mechanical properties, weldability, availability and cost; life cycle cost often favors higher-grade alloys.

  • Hydrogen-induced cracking is prevented by post-weld heat treatment and low-hardness welds (typically < 22 HRC for sour service).

  • Water chemistry control (pH, dissolved oxygen, chlorides) is the primary lever for boiler and cooling-water corrosion control.

Quick reference

Process Economics and Cost Estimation

  • Total capital investment = fixed capital investment + working capital; working capital is often 10–20% of fixed capital.

  • Operating cost components: raw materials, utilities, labor, maintenance, overhead, depreciation, and taxes; raw materials usually dominate.

  • Depreciation methods: straight-line, declining balance, and MACRS; depreciation is a non-cash expense that reduces taxable income.

  • Cash flow = net income + depreciation − capital expenditure; use after-tax cash flow for project evaluation.

  • Profitability measures: NPV, IRR, payback, and return on investment (ROI = annual profit / capital investment).

  • Cost index escalation: C₂ = C₁·(index₂/index₁); use published cost indices (e.g., Chemical Engineering Plant Cost Index) for time adjustment.

  • Utility costs: steam, cooling water, electricity and fuel are priced per unit; energy integration reduces utility consumption and operating cost.

  • Sensitivity analysis varies one parameter at a time; Monte Carlo simulation varies many parameters to give a distribution of NPV.

Quick reference

Reaction Safety and Runaway Prevention

  • Runaway reaction occurs when heat generation exceeds heat removal; the Semenov criterion compares heat generation and removal curves.

  • Adiabatic temperature rise ΔT_ad = (−ΔH_r)·C_A0/(ρ·C_p); it sets the maximum temperature if cooling is lost.

  • Thermal runaway indicators: onset temperature, time to maximum rate (TMR_ad), and self-accelerating decomposition temperature (SADT) for storage.

  • Calorimetry: DSC, ARC (accelerating rate calorimetry) and reaction calorimetry measure heat release and onset temperatures for scale-up.

  • Emergency relief sizing for runaway reactions uses the DIERS methodology (two-phase flow, homogeneous vessel venting).

  • Inherent safety hierarchy: minimize, substitute, moderate, simplify; reducing inventory is the most effective runaway risk reduction.

  • Cooling failure scenarios: loss of cooling, mischarge, and agitation failure are common initiating events; design for them explicitly.

  • Process hazard analysis should include reactivity hazards; incompatible chemical storage and mixing must be prevented by design.

Quick reference

Heat Transfer and Thermodynamics of Separation

  • Conduction: q = −k·A·dT/dx; Fourier's law; thermal conductivity of metals is much higher than that of gases and organic liquids.

  • Convection: q = h·A·ΔT; Nusselt number Nu = h·D/k; forced convection in tubes correlates with Re and Pr.

  • Radiation: q = ε·σ·A·(T₁⁴ − T₂⁴); σ = 5.67 × 10⁻⁸ W/(m²·K⁴); radiation dominates at high temperature.

  • Overall heat transfer coefficient: 1/U = 1/h_i + R_f,i + t/k + R_f,o + 1/h_o; fouling resistance reduces U over time.

  • Heat exchanger types: shell-and-tube (most common), plate-and-frame (compact, high U), air-cooled (no cooling water), double-pipe (small duty).

  • Boiling regimes: nucleate boiling (high heat transfer), transition boiling (unstable), film boiling (poor heat transfer, risk of burnout).

  • Condensation: dropwise gives higher h than filmwise; non-condensable gases reduce condenser performance significantly.

  • Distillation energy: reboiler duty is roughly proportional to reflux ratio; minimum reflux gives infinite stages and minimum energy.

Quick reference

Fluid Mechanics and Transport

  • Reynolds number Re = ρ·v·D/μ; laminar flow Re < 2100, transitional 2100–4000, turbulent > 4000 in pipes.

  • Darcy–Weisbach: ΔP = f·(L/D)·(ρ·v²/2); friction factor f from Moody chart or Colebrook equation; f ≈ 0.316·Re^(−0.25) for smooth turbulent pipes.

  • Bernoulli equation with friction: P₁/ρg + v₁²/2g + z₁ = P₂/ρg + v₂²/2g + z₂ + h_f.

  • Pump power: P = ρ·g·Q·H/η; brake horsepower includes pump efficiency; system curve determines operating point.

  • Pump and system curves intersect at the operating point; throttling moves the operating point along the pump curve and wastes energy.

  • Fan and compressor laws: flow ∝ speed, head ∝ speed², power ∝ speed³ (affinity laws).

  • Fluidization: minimum fluidization velocity from Ergun equation balance; bubbling regime above U_mf; entrainment limits gas velocity.

  • Mixing: impeller power number N_p = P/(ρ·N³·D⁵); turbulent N_p is constant for a given impeller geometry.

Quick reference

Process Safety Management Systems

  • PSM elements (OSHA 1910.119): process safety information, process hazard analysis, operating procedures, training, mechanical integrity, MOC, incident investigation, emergency planning, compliance audits.

  • Process hazard analysis methods: HAZOP, what-if, checklist, FMEA, fault tree analysis, event tree analysis; HAZOP is the most common for continuous processes.

  • Mechanical integrity programs cover pressure vessels, piping, relief devices, controls, and rotating equipment; inspection and testing frequencies are documented.

  • Incident investigation should identify root causes, not just immediate causes; use techniques like 5-whys and fault tree analysis.

  • Emergency planning includes evacuation routes, alarm systems, and coordination with local responders; drills verify effectiveness.

  • Compliance audits are required at least every three years under OSHA PSM.

  • Management of change must address technical, organizational and procedural changes; temporary changes also require MOC.

  • Pre-startup safety review confirms construction meets design, procedures are in place, and hazards are addressed before startup.

Quick reference

Environmental Regulations and Permitting

  • Clean Water Act: NPDES permits regulate point-source discharges; effluent limits are set by technology-based and water-quality-based standards.

  • Clean Air Act: National Ambient Air Quality Standards (NAAQS) for six criteria pollutants; State Implementation Plans (SIPs) enforce attainment.

  • Hazardous air pollutants (HAPs) are regulated under MACT standards; major sources emit ≥ 10 tons/year of a single HAP or ≥ 25 tons/year total.

  • Greenhouse gas reporting: facilities emitting ≥ 25,000 metric tons CO₂e per year must report under EPA GHG Reporting Program.

  • Spill Prevention, Control and Countermeasure (SPCC) plans are required for facilities storing oil above threshold quantities.

  • Emergency Planning and Community Right-to-Know Act (EPCRA) requires Tier II reporting of hazardous chemicals stored above thresholds.

  • Solid waste: RCRA subtitle C regulates hazardous waste; subtitle D regulates non-hazardous solid waste.

  • Environmental permits often require best available control technology (BACT) or lowest achievable emission rate (LAER) depending on attainment status.

Quick reference

Reactor Design and Scale-Up

  • CSTR in series approaches PFR behavior as the number of tanks increases; N tanks in series with equal volume gives narrower residence time distribution.

  • Residence time distribution: E(t) for CSTR is (1/τ)·exp(−t/τ); for PFR it is a delta function at t = τ.

  • Mixing effects: poor mixing in large reactors causes concentration and temperature gradients; scale-up must maintain mixing time relative to reaction time.

  • Heat transfer in reactors: jacket, coil, and external heat exchanger; heat transfer area per unit volume falls as reactor size increases (area ∝ D², volume ∝ D³).

  • Reactor scale-up: constant power per unit volume is common for gas–liquid systems; constant tip speed for shear-sensitive systems.

  • Multiple steady states in exothermic CSTRs: ignition and extinction points; hysteresis loop; stability determined by slope of heat generation vs heat removal.

  • Recycle reactors: recycle ratio affects conversion per pass and overall conversion; high recycle approaches CSTR behavior.

  • Catalyst scale-up: pressure drop, channel size, and maldistribution in large beds; radial mixing and bypassing must be checked.

Quick reference

Distillation and Absorption Design

  • Minimum reflux ratio for binary distillation from Underwood equations; actual reflux typically 1.2–1.5 times minimum.

  • Number of theoretical stages from Gilliland correlation or McCabe–Thiele graphical construction; stage efficiency converts theoretical to actual trays.

  • Packed column design: HETP (height equivalent to a theoretical plate) and HTU/NTU method; random packing vs structured packing trade-off.

  • Flooding in packed and tray columns sets the maximum vapor/liquid loading; design at 70–80% of flooding velocity.

  • Absorption: physical absorption depends on solubility and Henry's law; chemical absorption with reaction enhances rate and capacity.

  • Stripping is the reverse of absorption; steam stripping is common for removing volatile organics from water.

  • Azeotropic distillation: entrainer breaks the azeotrope; pressure-swing distillation uses pressure-dependent azeotrope composition.

  • Energy integration in distillation: heat pump, divided wall column, and multiple-effect distillation reduce energy use significantly.

Quick reference

Process Control Loop Design

  • Feedback control loop components: sensor, transmitter, controller, final control element (valve); loop tuning depends on process dynamics.

  • Controller modes: on/off, proportional, PI, PID; proportional-only leaves offset; integral eliminates offset but can cause windup.

  • Anti-windup: integral action is limited when the valve saturates; bumpless transfer between manual and automatic modes.

  • Valve characteristics: linear, equal-percentage, quick-opening; equal-percentage is common for level and pressure control.

  • Loop tuning methods: Ziegler–Nichols (ultimate gain and period), Cohen–Coon, IMC (internal model control), and relay auto-tuning.

  • Process control safety: fail-safe valve action (fail-closed or fail-open) is chosen based on the safe state of the process.

  • Advanced control: feedforward, cascade, ratio, and model predictive control (MPC) handle interacting loops and constraints.

  • Instrumentation standards: ISA symbols and P&ID conventions; loop numbering and tag naming follow ISA-5.1.

Quick reference

Chemical Process Economics and Feasibility

  • Feasibility study: market analysis, technical feasibility, economic analysis, and risk assessment before detailed design.

  • Capital cost estimate accuracy improves with project stage: order-of-magnitude (±30–50%), study (±30%), preliminary (±20%), definitive (±10%), detailed (±5%).

  • Operating cost includes raw materials, utilities, labor, maintenance, and overhead; raw material cost is often 60–80% of total for commodity chemicals.

  • Profitability: gross profit = revenue − cost of goods sold; net profit after tax; margins depend on feedstock and product prices.

  • Break-even analysis: fixed costs / (unit price − variable cost per unit); sensitivity to price and volume is critical.

  • Project financing: debt vs equity; cost of capital; hurdle rate often 10–15% for chemical projects.

  • Inflation and escalation: use cost indices to adjust historical costs; location factors adjust for regional labor and material costs.

  • Risk analysis: scenario analysis, sensitivity analysis, and Monte Carlo simulation quantify uncertainty in NPV and IRR.

Quick reference

Engineering Ethics and Professional Responsibility

  • Engineers must hold paramount the safety, health, and welfare of the public; this overrides employer and client interests.

  • Competence: practice only within areas of expertise; disclose limitations and seek expert review when needed.

  • Conflicts of interest: disclose financial or personal interests that could influence judgment; avoid accepting gifts that compromise objectivity.

  • Truthful reporting: present data accurately, do not fabricate or selectively report results; acknowledge uncertainty.

  • Whistleblowing: report hazards or violations through internal channels first; external reporting is justified when public safety is at risk.

  • Confidentiality: protect proprietary information; exceptions for legal requirements and public safety.

  • Sustainability: consider environmental impact and resource use in design decisions; engineers have a role in reducing emissions and waste.

  • Professional development: maintain competence through continuing education and stay current with codes and standards.

Quick reference

Reaction Kinetics and Mechanism

  • Rate law: −r_A = k·C_A^n·C_B^m; overall order = n + m; elementary reactions have orders equal to stoichiometric coefficients.

  • Rate-determining step in a mechanism controls the overall rate; steady-state approximation for reactive intermediates.

  • Catalysis: homogeneous, heterogeneous, and enzymatic; catalyst lowers activation energy without changing equilibrium.

  • Enzyme kinetics: Michaelis–Menten rate = V_max·S/(K_m + S); Lineweaver–Burk plot linearizes the data.

  • Chain reactions: initiation, propagation, termination; radical mechanisms in polymerization and combustion.

  • Temperature dependence: Arrhenius; activation energy from slope of ln k vs 1/T; catalysis reduces E_a.

  • Reversible reactions: equilibrium constant K = k_forward/k_reverse; approach to equilibrium limits conversion.

  • Selectivity and yield in complex reaction networks: series and parallel reactions; selectivity depends on concentration and temperature.

Quick reference

Process Safety and Hazard Analysis

  • HAZOP guide words applied to nodes: no, more, less, reverse, as well as, part of, other than; deviations from design intent are identified.

  • Fault tree analysis: top event traced to basic events through AND/OR gates; minimal cut sets identify critical failure combinations.

  • Event tree analysis: initiating event branches into success/failure paths; quantifies consequence frequencies.

  • LOPA: independent protection layers reduce risk; each IPL must be independent, specific, dependable, and auditable.

  • SIL determination: risk reduction factor from LOPA maps to SIL; SIL 1–4 with PFD ranges.

  • Bow-tie analysis: threats and consequences linked to a top event through preventive and mitigative barriers.

  • Risk matrix: likelihood × consequence; risk ranking guides prioritization of safeguards.

  • ALARP: risk reduced as low as reasonably practicable; cost–benefit analysis for further risk reduction.

Quick reference

Environmental Engineering and Pollution Control

  • Air pollution control: cyclones, baghouses, electrostatic precipitators, scrubbers; selection depends on particle size and gas properties.

  • Particulate removal: cyclone efficiency depends on particle size and gas velocity; baghouse efficiency > 99% for fine particles.

  • SO₂ control: wet flue gas desulfurization with limestone slurry; efficiency 90–98%.

  • NOx control: low-NOx burners, selective catalytic reduction (SCR) with ammonia, selective non-catalytic reduction (SNCR).

  • Wastewater treatment: primary (settling), secondary (biological), tertiary (advanced); activated sludge is the most common secondary process.

  • BOD and COD: BOD₅ measures biodegradable organics; COD measures total oxidizable matter; BOD/COD ratio indicates biodegradability.

  • Solid waste: landfill, incineration, recycling, composting; hazardous waste requires special handling and permits.

  • Green chemistry principles: atom economy, less hazardous synthesis, safer solvents, energy efficiency, renewable feedstocks.

Quick reference

Materials and Corrosion Control

  • Corrosion types: uniform, galvanic, pitting, crevice, stress-corrosion cracking, erosion–corrosion, hydrogen damage.

  • Material selection: carbon steel, stainless steels (304, 316, duplex), nickel alloys, titanium, plastics, and composites; selection based on environment and cost.

  • Galvanic series: metals ordered by potential; the more active metal corrodes when coupled; avoid small anode/large cathode area ratios.

  • Cathodic protection: sacrificial anodes or impressed current; protection potential for steel in soil about −0.85 V vs Cu/CuSO₄.

  • Coatings and linings: barrier protection; surface preparation is critical for adhesion and performance.

  • Corrosion monitoring: coupons, probes, ultrasonic thickness measurement, and inspection per API 570/510.

  • Stress-corrosion cracking: chloride SCC in stainless steel; mitigate by reducing stress, lowering temperature, or using duplex alloys.

  • Hydrogen damage: hydrogen embrittlement, blistering, and sulfide stress cracking; NACE MR0175 limits hardness and requires post-weld heat treatment.

Quick reference

Process Economics and Project Evaluation

  • Capital cost estimate classes: order-of-magnitude (±30–50%), study (±30%), preliminary (±20%), definitive (±10%), detailed (±5%).

  • Six-tenths rule: C₂ = C₁·(Q₂/Q₁)^0.6; exponent varies by equipment type (0.4–0.9).

  • Payback period = fixed capital / annual net cash flow; simple but ignores time value.

  • NPV = Σ cash flow_t/(1 + i)^t − initial investment; positive NPV means project earns above discount rate.

  • IRR: discount rate where NPV = 0; compare to hurdle rate (often 10–15%).

  • Depreciation: straight-line, declining balance, MACRS; non-cash expense that reduces taxable income.

  • Working capital: 10–20% of fixed capital; recovered at end of project life.

  • Sensitivity analysis: vary one parameter at a time; Monte Carlo varies many to give NPV distribution.

Quick reference

Process Design and Simulation

  • Flowsheet simulation: sequential-modular vs equation-oriented; recycle loops handled by tearing and convergence acceleration.

  • Degrees of freedom: F = 2 − π + C − r for a single-phase system; flowsheet fully specified when all design variables fixed.

  • Pinch analysis: minimum utility targets from composite curves; pinch temperature where hot and cold curves closest; ΔT_min trades capital vs energy.

  • Heat exchanger network: do not transfer heat across pinch; number of units target N − 1 + loops for N streams.

  • Optimization: set ∂f/∂x_i = 0 subject to constraints; Lagrange multipliers for equality constraints, KKT for inequality constraints.

  • Economic pipe diameter: D ∝ Q^0.45–0.5; capital cost rises with diameter while pumping cost falls, giving minimum total cost.

  • PFD vs P&ID: PFD shows major equipment and streams; P&ID adds instruments, control loops, line sizes, and valves.

  • Scale-up: geometric similarity; constant tip speed vs constant power per unit volume for agitators; mixing time scales differently from mass transfer.

Quick reference

Process Control and Instrumentation

  • PID controller: u(t) = K_c·e(t) + (K_c/τ_I)∫e dt + K_c·τ_D·de/dt; integral removes offset, derivative anticipates error.

  • First-order plus dead time: G(s) = K·e^(−θs)/(τs + 1); Ziegler–Nichols and Cohen–Coon tuning use K, τ, θ from step test.

  • Closed-loop stability: poles of characteristic equation must lie in left half-plane; Routh array or Nyquist criterion for higher-order systems.

  • Control valve sizing: C_v = Q·√(SG/ΔP); choked flow when ΔP exceeds about 0.5·P₁ for liquids.

  • Flow measurement: orifice plate has square-root relationship between flow and differential pressure; Coriolis meter measures mass flow directly.

  • Cascade control: fast inner loop (flow) and slower outer loop (temperature); ratio control maintains fixed ratio of two flows.

  • Dead time dominates control difficulty: θ/τ > 1 makes feedback control difficult; feedforward or MPC preferred.

  • Instrumentation: 4–20 mA current loop standard; 4 mA is live zero for fault detection; HART superimposes digital signal on analog loop.

Quick reference

Plant Safety and Risk Management

  • HAZOP guide words: no, more, less, reverse, as well as, part of, other than; applied to process parameters at nodes.

  • LOPA: risk reduction factor = initiating frequency × consequence / tolerable frequency; IPLs must be independent and auditable.

  • SIL: PFD ranges SIL 1 = 10⁻¹–10⁻², SIL 2 = 10⁻²–10⁻³, SIL 3 = 10⁻³–10⁻⁴.

  • Flammability: LFL and UFL bound flammable range; inert gas narrows range; flash point is temperature where vapor pressure reaches LFL.

  • Dust explosions: fuel, oxygen, ignition, dispersion, confinement; K_st and P_max characterize explosibility.

  • Relief valve sizing for gas: ideal-gas isentropic flow with critical pressure ratio (P₂/P₁ ≈ 0.528 for air); liquids use API 520 equation.

  • Bow-tie analysis: threats to top event through preventive barriers; consequences through mitigative barriers.

  • Risk = likelihood × consequence; ALARP requires risk as low as reasonably practicable with cost–benefit justification.

Quick reference

Environmental Protection and Sustainability

  • CO₂ emissions from fuel combustion: mass CO₂ = fuel mass × carbon fraction × (44/12); natural gas ≈ 2.0 kg CO₂/kg fuel, coal ≈ 2.5–3.0.

  • Wastewater: BOD₅ measures biodegradable organic load over 5 days at 20 °C; COD measures total oxidizable matter; BOD/COD > 0.4 suggests good biodegradability.

  • Air dispersion: Gaussian plume model C(x,y) = Q/(2πσ_yσ_z u)·exp(−y²/2σ_y²)·[exp(−(z−H)²/2σ_z²) + exp(−(z+H)²/2σ_z²)].

  • Stack height and plume rise: effective stack height H = h_stack + Δh; ground-level concentration falls roughly with 1/H².

  • Scrubber efficiency: η = (C_in − C_out)/C_in; absorption of acid gases with alkaline solution is common control method.

  • Life cycle assessment stages: goal and scope, inventory analysis, impact assessment, interpretation; functional unit is basis for comparison.

  • Carbon capture: amine absorption (MEA) captures CO₂ from flue gas; regeneration energy is main cost driver; capture efficiency often 85–95%.

  • Sustainability metrics: carbon intensity (kg CO₂e per tonne product), water footprint, and energy intensity are standard reporting measures.

Quick reference

Materials, Corrosion and Mechanical Integrity

  • Carbon steel default; stainless steel 304 (18% Cr, 8% Ni) resists oxidation but susceptible to chloride SCC; 316 adds 2–3% Mo for chloride resistance.

  • Galvanic corrosion requires dissimilar metals in contact with electrolyte; more active metal corrodes; avoid large cathode-to-anode area ratios.

  • PREN = %Cr + 3.3·%Mo + 16·%N; higher PREN means better chloride pitting resistance.

  • Nelson curves give temperature limits for hydrogen attack in carbon steel; above curve, hydrogen reacts with carbides to form methane.

  • ASME B31.3: t = P·D/(2·S·E + P·Y) + corrosion allowance for process piping wall thickness.

  • Corrosion allowance added to minimum wall thickness; remaining life = (t_actual − t_required)/corrosion rate.

  • Hydrogen embrittlement affects high-strength steels; sulfide stress cracking in wet H₂S above about 0.05 psi partial pressure (NACE MR0175).

  • Mechanical integrity: API 570 piping inspection, API 510 pressure vessels, API 653 storage tanks; inspection intervals set by corrosion rate and remaining life.