Industrial Engineer Industrial Safety flashcards
Industrial Engineer Industrial Safety · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Safety management system
- A documented, auditable framework of policy, planning, implementation, evaluation, and corrective action; ISO 45001 structures it around the Plan-Do-Check-Act cycle.
- Hierarchy of controls
- The order of control effectiveness: elimination, substitution, engineering controls, administrative controls, then personal protective equipment as the last resort.
- Leading indicator
- A measure of preventive activity, such as inspections completed or near-miss reports, that predicts future safety performance rather than recording past outcomes.
- General Duty Clause
- OSH Act Section 5(a)(1); requires employers to provide a workplace free from recognized hazards likely to cause death or serious physical harm when no specific standard applies.
- Recordable injury criteria
- Under 29 CFR 1904, an injury is recordable if it involves medical treatment beyond first aid, loss of consciousness, days away, restricted work, or transfer.
- Permissible exposure limit
- An OSHA regulatory limit on airborne contaminant concentration, usually an 8-hour time-weighted average, found in 29 CFR 1910.1000 tables Z-1 through Z-3.
- Hazard versus risk
- A hazard is a potential source of harm; risk is the combination of the likelihood of occurrence of that harm and its severity.
- HAZOP guide words
- Words such as no, more, less, as well as, part of, and reverse applied to process parameters to identify deviations from design intent during a hazard study.
- Job hazard analysis
- A task-based method that breaks a job into steps, identifies hazards for each step, and specifies controls for each step.
- ALARP
- As Low As Reasonably Practicable; residual risk is acceptable when further reduction would be grossly disproportionate to the benefit gained.
- Bow-tie analysis
- A diagram linking threats and preventive barriers on one side to consequences and mitigating barriers on the other, centered on a top event.
- Layers of protection analysis
- A semi-quantitative method that estimates the risk reduction provided by independent protection layers and compares mitigated frequency to a target.
- NIOSH lifting equation
- RWL = LC × HM × VM × DM × AM × FM × CM; the lifting index is load divided by RWL, and values above 1.0 indicate increased risk.
- Anthropometric design rule
- Design for the 5th percentile for reach and clearance limits, and for the 95th percentile for clearance and strength demands.
- Cognitive workload
- The mental demand of a task; it can be assessed with tools such as NASA-TLX, which rates mental, physical, temporal, performance, effort, and frustration demands.
- Point-of-operation guard
- A barrier or device that prevents the operator's hands, arms, or other body parts from entering the danger zone during the machine operating cycle.
- Safety distance formula
- D = K × T, where K is the approach speed (commonly 63 in/s or 1600 mm/s) and T is the total stopping time including device response.
- Interlocked guard
- A guard that stops hazardous machine motion when it is opened; the interlock must be designed so a single fault cannot defeat it.
- LOTO six-step sequence
- Notify affected employees, shut down, isolate all energy sources, apply locks and tags, release stored energy, and verify isolation before work begins.
- Arc flash boundary
- The distance from an electrical hazard at which incident energy equals 1.2 cal/cm², the threshold for a second-degree burn.
- Group lockout
- A method using a hasp or lockout device so that each authorized employee applies a personal lock that must remain until their work is complete.
- Fire tetrahedron
- The four elements needed for combustion: fuel, oxygen, heat, and the chemical chain reaction; removing any one element extinguishes the fire.
- Flash point
- The lowest temperature at which a liquid gives off enough vapor to form an ignitable mixture with air near its surface; flammable liquids are below 100 °F.
- Means of egress
- The continuous and unobstructed path of travel from any point in a building to a public way, comprising exit access, exit, and exit discharge.
- TWA exposure formula
- TWA = (C₁T₁ + C₂T₂ + … + CₙTₙ) / 8 hours, where C is concentration and T is time in hours; compared to the 8-hour permissible exposure limit.
- Hearing conservation action level
- An 8-hour time-weighted average noise exposure of 85 dBA; at or above this level, a hearing conservation program is required under OSHA rules.
- Five Whys
- A root cause technique that repeatedly asks why a condition or action occurred until a systemic cause is reached rather than stopping at human error.
- Fault tree analysis
- A deductive method starting from a top event and working backward through AND/OR gates to basic events that could cause it.
- OSHA incidence rate
- (Number of recordable cases × 200,000) / total hours worked; 200,000 is the base for 100 full-time-equivalent workers at 40 hours per week for 50 weeks.
- DART rate
- (Days away, restricted, or transfer cases × 200,000) / total hours worked; a lagging indicator of serious injury outcomes.
- PSM threshold quantity
- For a flammable liquid or gas, 10,000 lb in one location; for listed highly hazardous chemicals, the threshold is specified in OSHA Appendix A.
- Management of change
- A PSM element requiring review of the technical basis, safety and health impacts, procedure changes, training needs, and authorization before a process change.