Engineer Interior Architecture flashcards
Engineer Interior Architecture · Build recall with a focused review session.
33 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Net assignable area
- The usable floor area assigned to a specific function, excluding corridors, partitions, columns, shafts, and exterior wall thickness. It is the basis for efficiency ratio calculations.
- Efficiency ratio
- Net assignable area divided by gross area. Typical office buildings fall between 0.75 and 0.85; lower values indicate heavy core, circulation, or structural area.
- Accessible turning space
- A clear floor area of 60 inches (1525 mm) diameter, or a T-shaped space within a 36-inch square, allowing a wheelchair user to change direction.
- Adjacency matrix
- A planning tool that ranks required proximity between program spaces, guiding bubble diagrams and block plans before dimensions and walls are fixed.
- Occupant load factor
- Floor area per occupant used to compute occupant load. Business occupancies commonly use 150 gross square feet per person; assembly concentrated uses 15 net.
- Egress width factor
- Inches of clear width required per occupant by egress component: 0.2 inch on level surfaces, 0.3 inch for stairs and ramps, with 36 inches minimum clear width.
- Accessory occupancy
- A small subordinate use, limited in area and height relative to the main occupancy, that is classified as part of the main occupancy rather than separately.
- Type I construction
- The most restrictive construction type, requiring noncombustible structural elements with high fire-resistance ratings, typically used for tall buildings.
- Dead-end corridor
- A corridor segment with egress in only one direction, limited by code to 20 feet in most nonsprinklered cases and 50 feet where sprinklered.
- Exit remoteness
- The required separation between two exits, commonly at least one-half the diagonal of the area served, so a single fire cannot block both routes.
- Fire-resistance rating
- The time in hours an assembly resists fire under standardized testing such as ASTM E119 or UL 263, including limits on temperature rise and hose stream.
- Smoke barrier
- A continuous membrane with a 1-hour fire-resistance rating and protected openings, designed to restrict smoke movement between compartments and support smoke control.
- Class A interior finish
- Interior finish with a flame spread index of 0 to 25 and smoke-developed index of 450 or less, the most restrictive classification under interior finish testing.
- Critical radiant flux
- A flooring flammability measure from ASTM E648, expressed in watts per square centimeter; higher values indicate greater resistance to flame spread.
- Basis-of-design specification
- A specification naming a specific product as the standard for quality and performance, permitting substitutions only through the stated approval process.
- MasterFormat Division 09
- The specification division covering finishes, including gypsum board, tile, acoustical ceilings, flooring, paints, and coatings, organized by construction work results.
- Live load deflection limit
- A common structural criterion of L/360 for floor beams under live load, where L is the span, intended to limit cracking of finishes and vibration.
- UL fire-rated assembly
- A listed combination of framing, board type, fasteners, and spacing that achieves a specific fire-resistance rating; altering any component can void the rating.
- Seismic ceiling bracing
- Additional grid wires, struts, and perimeter attachments required in high-seismic zones to keep suspended ceilings from falling during ground motion.
- Footcandle
- A unit of illuminance equal to one lumen per square foot; one footcandle equals approximately 10.76 lux. Office work planes are often designed at 30 to 50 footcandles.
- Luminous efficacy
- The ratio of light output in lumens to power input in watts. LED sources commonly exceed 100 lumens per watt, far above incandescent lamps.
- Sound transmission class
- A single-number rating of airborne sound isolation for a partition; higher values mean better speech privacy between adjacent rooms.
- Noise reduction coefficient
- A single-number average of sound absorption across speech frequencies, ranging from 0 for fully reflective to 1.0 for fully absorptive surfaces.
- Environmental Product Declaration
- A third-party verified report disclosing a product's life-cycle environmental impacts, used to compare materials and support green building credit documentation.
- Health Product Declaration
- A standardized disclosure of a building product's contents and associated health hazards, supporting material ingredient reporting and informed specification choices.
- Construction IAQ flush-out
- A procedure that ventilates a new building with outdoor air for a specified volume before occupancy to remove construction-related volatile organic compounds.
- Embodied carbon
- The greenhouse gas emissions associated with extracting, manufacturing, transporting, installing, and disposing of building materials, excluding operational energy use.
- Contingency in estimates
- A percentage allowance added to an estimate for unknown conditions; design contingency is largest at schematic design and decreases as documents are completed.
- Construction change directive
- A written order directing the contractor to proceed with work before price and time are agreed, used when the owner and contractor cannot settle a change promptly.
- Critical path
- The longest sequence of dependent activities in a schedule; activities on it have zero float, so any delay extends the project completion date.
- Substantial completion
- The stage when work is sufficiently complete for the owner's intended use, starting warranty periods and shifting risk of loss to the owner.
- Standard of care
- The level of skill and diligence ordinarily exercised by similarly situated design professionals under similar circumstances, used to judge negligence claims.
- Instruments of service
- Drawings, specifications, and other design documents prepared by the architect; the architect retains ownership and grants the owner a license for the project.