Craftsman Computer Aided Mechanical Drawing study materials
Craftsman Computer Aided Mechanical Drawing study resources

Craftsman Computer Aided Mechanical Drawing study plan

Craftsman Computer Aided Mechanical Drawing · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Fundamentals of engineering drawing and drafting standards & CAD software operation and file/environment management

  • Memorize the ISO 128 line types (continuous thick, continuous thin, dashed, chain, double-dashed chain) and state the correct application for each in a hand-drawn reference sheet.

  • Set up a metric drawing template in the CAD package with A3/A4 sheets, title block, layer scheme (outline, hidden, center, dimension, hatch, text), line weights, and text/dimension styles, then save it as the default start file.

  • Configure and demonstrate five environment settings: drawing units and precision, object snap, polar tracking increments, grid/snap spacing, and autosave interval.

  • Practice file management by saving, exporting to DXF/DWG and PDF, and recovering a deliberately corrupted copy from a backup.

  • Explain first-angle versus third-angle projection symbol placement and identify which standard your template uses.

Your checkpoint

A saved custom .dwt/.dwg template plus a one-page layer and line-type standard sheet, both verified by opening a test drawing that uses every layer.

Week 2

CAD software operation and file/environment management & 2D geometric construction and sketching

  • Execute the full 2D command set fluently on timed drills: line, polyline, circle, arc, rectangle, polygon, ellipse, offset, trim, extend, fillet, chamfer, array, mirror, rotate, scale, stretch.

  • Construct geometric entities from constraints alone: draw a line tangent to two circles, bisect an angle, inscribe a hexagon in a circle, and construct a perpendicular at a line end using only compass-and-straightedge logic applied in CAD.

  • Use object snaps and tracking (endpoint, midpoint, center, tangent, perpendicular, intersection, extension) with zero mis-clicks in a 20-object accuracy drill.

  • Apply parametric or geometric constraints to keep a sketch fully defined, and diagnose under-constrained geometry by dragging it.

  • Create and reuse blocks with attributes for repeated symbols such as fasteners and surface-finish marks.

Your checkpoint

A single sketch file containing six constraint-based constructions (tangency, bisection, inscribed polygon, perpendicular, arc blend, symmetry) with all geometry fully constrained.

Week 3

Orthographic projection and multi-view drawing

  • Project a given 3D-shaped object into front, top, and right-side views using correct alignment and projection lines, and verify the 45-degree miter transfer method.

  • Select the minimum number of views needed for five sample parts and justify each omission of a redundant view.

  • Draw hidden lines, center lines, and symmetry lines according to convention in at least three multi-view exercises, including one part with a cylindrical feature.

  • Convert a set of three orthographic views back into an isometric sketch to confirm reading accuracy.

  • Identify and correct at least five deliberate errors (misaligned views, missing hidden lines, wrong line precedence) in a supplied faulty drawing.

Your checkpoint

A three-view drawing set for two parts (one prismatic, one with cylindrical features) plus a corrected version of the faulty drawing with each error annotated.

Week 4

Orthographic projection and multi-view drawing & Dimensioning, tolerancing, and fits

  • Apply the full dimensioning rule set: no duplicate dimensions, dimensions to visible edges only, grouping, baseline versus chain dimensioning, and placement outside the view when crowded.

  • Assign limits and tolerances to a shaft and hole pair and compute clearance, interference, or transition fit for three ISO fit designations (e.g., H7/g6, H7/k6, H7/s6).

  • Calculate allowance, maximum and minimum clearance, and tolerance stack-up for a three-part chain, showing the arithmetic.

  • Apply geometric tolerancing symbols (flatness, perpendicularity, position, concentricity) with correct datum references on two sample parts.

  • Dimension a drawing so that every feature is defined once and no dimension is redundant, verified by a self-check against a checklist.

Your checkpoint

A fully dimensioned and toleranced part drawing with a separate calculation sheet showing fit values and a tolerance stack-up result.

Week 5

Dimensioning, tolerancing, and fits & Sections, auxiliary views, and conventions

  • Produce a full section, a half section, and an offset section of the same part and compare which features each reveals.

  • Apply section conventions: omit hidden lines in the sectioned view, hatch adjacent parts at different angles, and exclude shafts, bolts, ribs, and webs from hatching when cut longitudinally.

  • Create a broken-out section and a revolved section for a thin feature such as a rib or spoke.

  • Construct an auxiliary view from an inclined surface using the correct reference-plane method and project the true shape.

  • Label cutting-plane lines, section arrows, and view identifiers consistently with the standard you selected in week 1.

Your checkpoint

One drawing sheet containing full, half, and offset sections of a single part plus an auxiliary view of an inclined face, all correctly labeled and hatched.

Week 6

Sections, auxiliary views, and conventions & Mechanical part and assembly drawing

  • Draw a complete mechanical part drawing for a bracket or housing including all views, sections, dimensions, tolerances, surface finish, and a title block.

  • Create a detail drawing set for three components of a small assembly (e.g., a shaft, a bushing, and a cover) with consistent dimensioning schemes.

  • Assemble the parts into an assembly drawing with a bill of materials, item balloons, and a parts list keyed to the balloons.

  • Apply standard representation of threaded fasteners, bearings, springs, and weld symbols in the assembly.

  • Check the assembly for interference and confirm that mating dimensions match across detail drawings.

Your checkpoint

A multi-sheet package: three detail drawings plus one assembly drawing with balloons, BOM, and a recorded interference/mating-dimension check.

Week 7

Mechanical part and assembly drawing & Plotting, output, and drawing documentation

  • Prepare drawings for output: set plot scale, choose paper size, configure line-weight scaling, and verify that line weights print as intended at 1:1 and 1:2.

  • Create a multi-sheet layout set with a consistent title block, revision table, and drawing numbering scheme.

  • Export to PDF and DXF and confirm that layers, text, and dimensions survive the round trip without loss.

  • Write a drawing register and a short documentation note covering revision control, approval signatures, and file naming conventions.

  • Run a final plot check against a print-readability checklist (text height, arrow size, line contrast).

Your checkpoint

A plotted PDF set of all drawings from weeks 3-6 with revision table, drawing register, and a completed print-readability checklist.

Week 8

Fundamentals of engineering drawing and drafting standards & Dimensioning, tolerancing, and fits

  • Re-derive from memory the line-type, dimensioning, and tolerancing rules that were weakest on practice quizzes, and record them in a one-page cheat sheet.

  • Complete a timed full-length mock exam under exam conditions and score it by domain to identify residual weak areas.

  • Redo every mock-exam question answered incorrectly and write a one-line reason for each error.

  • Review fit calculations and tolerance stack-up once more, since these carry high weight in domain 5 and are common error sources.

  • Confirm readiness by scoring at least 80 percent on a second, shorter timed quiz covering domains 1, 5, and 8.

Your checkpoint

A scored mock-exam report with per-domain percentages, an error log, and a final one-page standards cheat sheet.

Milestones

Week 2: Custom template and layer standard are in use, and the six-construction sketch is fully constrained with no under-defined geometry.

Week 4: Two correct three-view drawings are complete and the fit/stack-up calculations produce verifiable numeric answers.

Week 6: Section and auxiliary view sheet is complete, and the three detail drawings plus assembly drawing pass the mating-dimension check.

Week 8: Mock exam scored and analyzed by domain, with at least 80 percent on the domain 1/5/8 quiz and all errors logged with reasons.