- Scope baseline
- The signed statement of work plus all approved change requests. Any requested deliverable not traceable to this baseline is out of scope until a formal change order is approved.
- Cost Performance Index
- CPI equals earned value divided by actual cost. A value below 1.0 means the engagement is spending more than the work completed is worth, signaling a cost overrun.
- Schedule Performance Index
- SPI equals earned value divided by planned value. A value below 1.0 indicates the project is behind schedule relative to the baseline plan at the measurement date.
- RACI matrix
- A responsibility assignment grid. Each activity has exactly one Accountable owner, one or more Responsible performers, Consulted contributors engaged before decisions, and Informed recipients notified afterward.
- Change control sequence
- Log the request, assess impact on scope, schedule, cost and risk, obtain written approval from the authorized client sponsor, rebaseline the plan, then execute the approved change.
- Non-functional requirement
- A quality attribute describing how well a system must perform, such as latency, availability, throughput, scalability or security. It must be measurable to be testable and verifiable.
- Fit-gap analysis
- Classification of each requirement as standard fit, configuration fit, customization, or process change. The count of customizations is the main driver of total cost of ownership.
- Requirements traceability matrix
- A table linking each requirement identifier to its business justification, design element, build component, and test case. Orphan requirements lack either upstream justification or downstream verification.
- MoSCoW prioritization
- Ranks requirements as Must, Should, Could, or Won't have. Must items must together form a viable deliverable solution, and Won't items are explicitly deferred from the current release.
- Testable requirement criterion
- A requirement is testable only when it states a measurable condition and expected outcome. Vague terms such as fast, intuitive or user-friendly are defects requiring clarification.
- Idempotent message consumer
- A consumer designed so repeated delivery of the same message produces the same end state. Achieved with natural keys, deduplication stores, or upsert operations rather than blind inserts.
- Synchronous versus asynchronous integration
- Synchronous request and response blocks the caller and fails immediately. Asynchronous messaging decouples producer and consumer, tolerating outages but requiring retries, ordering rules and dead-letter queues.
- Authentication versus authorization
- Authentication proves who a user is, typically through SAML or OIDC. Authorization determines what that authenticated user may do, using roles, scopes or policy rules. They are separate controls.
- CAP theorem
- Under a network partition, a distributed system must sacrifice either consistency or availability. The chosen trade-off is an explicit architecture decision with business consequences.
- Recovery point and time objectives
- RPO is the maximum acceptable data loss measured in time; RTO is the maximum acceptable downtime. Both must be quantified and validated by an actual failover test.
- Configuration versus customization
- Configuration uses supported platform settings and survives upgrades. Customization requires code or schema change and carries upgrade, testing and maintenance cost. Prefer configuration where requirements allow.
- Data migration reconciliation
- After loading, compare source and target record counts, key field totals and checksums. Unreconciled differences block sign-off and must be resolved or formally accepted before cutover.
- Environment promotion path
- The sequence development, integration test, staging or UAT, then production. Each promotion uses a versioned, repeatable deployment artifact rather than manual ad hoc changes.
- Rollback plan
- A pre-approved procedure to restore the prior state if deployment fails, using reverse scripts or a verified restore point tested in non-production before the production change window.
- Bulk load rate limits
- Platform APIs cap requests per interval. Bulk loads must batch, throttle and monitor errors, because parallel writes to the same records cause lock contention and partial failures.
- Smoke versus regression testing
- Smoke testing quickly confirms a new build is stable enough for deeper testing. Regression testing re-executes existing cases after any change to detect broken previously working behavior.
- Defect severity versus priority
- Severity measures impact on the system or business; priority measures urgency of fixing. They are independent attributes and frequently disagree, so both fields are tracked separately.
- UAT exit criteria
- Predefined conditions ending user acceptance testing: all critical and high defects closed, agreed defect tolerance met, test cases executed, and business sign-off formally recorded.
- Parallel run deployment
- Both legacy and new systems operate simultaneously for a defined period, with outputs compared. It is the safest and most expensive cutover strategy and reduces transition risk.
- Go/no-go readiness checklist
- The gate before production cutover: test completion, data reconciliation, training completion, confirmed rollback plan, support rota, and named business approver recorded in writing.
- Hypercare period
- A defined post-deployment window of intensified monitoring and rapid issue resolution, tracking error rates, integration queue depth and user reports before transition to steady-state support.
- RAG status criteria
- Red, amber, green status must map to stated thresholds, such as red meaning a milestone slip over five working days or an unresolved critical issue. Undefined colors mislead sponsors.
- Decision log
- A record of each significant decision with date, decision, rationale, alternatives rejected and owner. It resolves later disputes about why the solution was designed as it is.
- Handover package contents
- As-built documentation, configuration workbook, operational runbook, support model, transferred credentials and warranty terms. It enables the client to operate and maintain the solution independently.
- Knowledge transfer verification
- Confirming the client can perform the task unaided, observed in a practical exercise. Attendance at a training session alone does not demonstrate transferred competence.
- Data processing agreement
- A contract required when a processor handles personal data for a controller. It sets purpose limits, security measures, sub-processor rules, breach notification and deletion obligations.
- Conflict of interest disclosure
- Any personal, financial or competing interest that could bias advice must be disclosed in writing as soon as identified, allowing the client to decide on mitigation or continuation.