- Plan Review
- Related: Submittal Package, Approved Plans, Plan Reviewer
The formal process in which a fire authority examines submitted sprinkler drawings and calculations against adopted codes before issuing approval to install or modify a system.
- Submittal Package
- Related: Plan Review, Working Drawings, Hydraulic Calculations
The complete set of documents a contractor files for approval, typically including working drawings, hydraulic calculations, manufacturer data sheets, and a completed permit application.
- Working Drawings
- Related: Submittal Package, Approved Plans, Riser Detail
Scaled plans showing pipe routing, sprinkler locations, pipe sizes, hanger locations, and riser details that installers use to build the system as approved.
- Approved Plans
- Related: Plan Review, Revision Submittal, Authority Having Jurisdiction
Drawings that have received written acceptance from the authority having jurisdiction and must be kept on site; deviations generally require a revised submittal and re-approval.
- Hydraulic Calculations
- Related: Remote Area, Safety Margin, Water Supply Curve
The mathematical analysis showing that available water supply pressure and flow satisfy the demand of the most remote sprinkler area plus hose allowance and other required additions.
- Remote Area
- Related: Hydraulic Calculations, Design Density, Safety Margin
The hydraulically most demanding area of sprinkler operation, determined by design density and assumed operating sprinkler count, used as the basis for calculating system demand.
- Design Density
- Related: Hazard Classification, Remote Area, Hydraulic Calculations
The minimum water flow rate, expressed in gallons per minute per square foot, that must be delivered over a specified floor area for a given hazard classification.
- Hazard Classification
- Related: Design Density, Occupancy Classification, Commodity Classification
The category assigned to an occupancy based on fuel load and combustibility, such as light, ordinary group 1 or 2, or extra hazard, which drives sprinkler and density requirements.
- Occupancy Classification
- Related: Hazard Classification, Commodity Classification, Code Adoption
The building-code grouping of a structure by use, such as assembly, business, mercantile, or storage, which determines whether sprinklers are required and under what conditions.
- Commodity Classification
- Related: Hazard Classification, Storage Design Criteria
A storage-oriented ranking of goods by packaging and combustibility, used with storage height and arrangement to select sprinkler design criteria in storage occupancies.
- Authority Having Jurisdiction
- Related: Approved Plans, Plan Review, Certificate of Occupancy
The organization, office, or individual responsible for enforcing code requirements and approving equipment, materials, installations, and procedures in a given jurisdiction.
- Riser Detail
- Related: Working Drawings, Riser Nipple, Inspector's Test Valve
A drawing or diagram showing the vertical supply piping assembly, including control valves, check valve, alarm valve, gauges, drain, and test connections at the system origin.
- Revision Submittal
- Related: Approved Plans, As-Built Drawings
A resubmission of plans documenting changes from previously approved drawings, required when field conditions or design changes alter the approved layout or hydraulic demand.
- As-Built Drawings
- Related: Revision Submittal, Approved Plans
Record drawings updated to reflect actual installed conditions, including field deviations from the approved design, often required at project closeout.
- Safety Margin
- Related: Hydraulic Calculations, Water Supply Curve, Remote Area
The difference between available water supply and calculated system demand, used to confirm the supply can reliably meet demand without excessive reliance on full municipal pressure.
- Water Supply Curve
- Related: Safety Margin, Hydraulic Calculations, Flow Test
A graph or table of static, residual, and flow test data that describes how much pressure remains available at various flow rates from the public main or private source.
- Flow Test
- Related: Water Supply Curve, Safety Margin
A field measurement of static and residual pressure at known flow from a hydrant or test outlet, used to estimate the water supply available for sprinkler design.
- Rough-In Inspection
- Related: Final Inspection, Hydrostatic Test, Hanger Spacing
A field inspection performed after piping and hangers are installed but before concealment, verifying materials, spacing, bracing, and compliance with approved plans.
- Hydrostatic Test
- Related: Rough-In Inspection, Final Inspection, Inspector's Test Valve
A pressure test in which the system is filled with water and held at a specified pressure for a set duration to reveal leaks in piping and joints.
- Final Inspection
- Related: Rough-In Inspection, Hydrostatic Test, Certificate of Occupancy
The closing field inspection confirming the completed system matches approved plans, passes required tests, and has functioning alarms, valves, and signage.
- Hanger Spacing
- Related: Rough-In Inspection, Sway Bracing, Seismic Bracing
The maximum permitted distance between supports for a given pipe size and material, set by code to prevent sagging and to keep sprinklers in their intended positions.
- Sway Bracing
- Related: Hanger Spacing, Seismic Bracing, Rough-In Inspection
Lateral and longitudinal bracing installed to resist earthquake or other horizontal forces that could displace piping and damage sprinkler heads or joints.
- Inspector's Test Valve
- Related: Riser Detail, Main Drain Test, Hydrostatic Test
A valve at the remote end of the system that opens a small orifice to simulate a single sprinkler flow, confirming water reaches the end of the line.
- Main Drain Test
- Related: Inspector's Test Valve, Water Supply Curve
A test in which the main drain is fully opened and pressure readings are recorded before and after, used to detect supply restrictions and compare against baseline values.
- Certificate of Occupancy
- Related: Final Inspection, Authority Having Jurisdiction
The document issued by a building official confirming a structure is approved for its intended use, often contingent on satisfactory sprinkler inspection and testing.
- Contractor License
- Related: Qualifying Party, License Renewal, License Classification
The credential issued by the state to a business entity authorizing it to contract for fire sprinkler work, held separately from an individual's qualifying certification.
- Qualifying Party
- Related: Contractor License, Continuing Education, License Classification
The individual who passes the required examination and whose credentials support the firm's license, often required to be an owner or designated responsible managing employee.
- License Classification
- Related: Contractor License, Scope of Work, Qualifying Party
A scope designation on a contractor license, such as a category limited to certain system types or work values, that defines what work the holder may legally perform.
- License Renewal
- Related: Continuing Education, Contractor License, License Lapse
The periodic process of maintaining an active license by paying fees and meeting continuing education or other conditions before the expiration date.
- Continuing Education
- Related: License Renewal, Qualifying Party
Required coursework or training hours that license holders complete within a renewal cycle to keep their credential active and current with code changes.
- License Lapse
- Related: License Renewal, Contractor License
The inactive status of a license that has expired without renewal, which generally prohibits contracting for work until reinstated under state rules.
- Scope of Work
- Related: License Classification, Submittal Package
The defined boundaries of the contracted sprinkler installation or alteration, used to determine permit needs, license classification, and inspection responsibility.
- Code Adoption
- Related: Model Code, Local Amendment, Authority Having Jurisdiction
The formal legal action by which a jurisdiction adopts a model code or standard edition, establishing which requirements are enforceable within its boundaries.
- Model Code
- Related: Code Adoption, Local Amendment, Standard Edition
A consensus standard published by a national organization, such as NFPA 13 for sprinkler installation, that becomes enforceable only when adopted by a jurisdiction.
- Local Amendment
- Related: Code Adoption, Model Code
A jurisdiction-specific change to an adopted model code that modifies, adds, or deletes requirements, and which takes precedence over the model text locally.
- Standard Edition
- Related: Model Code, Code Adoption
The specific year-dated version of a model standard that a jurisdiction has adopted, which governs because later or earlier editions are not enforceable.
- Occupancy Hazard Comparison
- Related: Hazard Classification, Commodity Classification, Occupancy Classification
The analysis of whether a proposed use matches the hazard assumptions used in the approved design, triggering review when storage, processes, or materials change.
- Storage Design Criteria
- Related: Commodity Classification, Hazard Classification, Design Density
The sprinkler design parameters selected for a storage occupancy based on commodity class, storage height, aisle width, and sprinkler type and spacing.