LEED AP O+M study materials
LEED AP O+M study resources

LEED AP O+M flashcards

LEED AP O+M · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Performance period length
LEED O+M certification requires a consecutive 12-month performance period of measured data ending no more than 12 months before the certification submittal date.
Arc platform purpose
Arc is the USGBC digital platform where projects upload measured performance data, receive scores, and submit for LEED O+M certification review.
Recertification cycle
LEED O+M recertification occurs every three years using the most recent 12 consecutive months of measured performance data available at submittal.
Certified point threshold
A LEED O+M project earns Certified at 40-49 points, Silver at 50-59, Gold at 60-79, and Platinum at 80 or more out of 110.
Regional Priority credits
Regional Priority credits are zip-code-specific bonus credits selected from a list of priority credits designated for the project's region; each earned RP credit is worth one point.
Innovation credit sources
Innovation credits are earned through exemplary performance above credit thresholds or through pilot credits from the USGBC pilot credit library.
Source energy use intensity
Energy performance in Arc is measured as source EUI in kBtu per square foot per year and compared to a national median for the same building type.
ASHRAE Level II audit
A detailed energy survey that includes analysis of specific efficiency measures with estimated savings and costs, more thorough than a Level I walk-through.
Advanced energy metering
Meters recording at one-hour intervals or less, storing at least 36 months of data, and remotely accessible, required for the advanced metering credit.
ENERGY STAR benchmark score
A 1-100 score comparing a building's energy performance to similar buildings; 75 or higher is the typical exemplary benchmark for eligible building types.
Ongoing commissioning requirement
A commissioning plan, current facilities requirements, and systems manual must be maintained, with a commissioning authority reviewing building systems at least annually.
Indoor water prerequisite
The indoor water use prerequisite requires a 20% reduction from the EPAct 1992 fixture baseline calculated using the building's occupancy.
Outdoor water prerequisite
The outdoor water use prerequisite requires a 30% reduction from baseline irrigation demand or no permanent irrigation system installed.
Water metering credit
Permanent meters measuring total potable water consumption at one-hour intervals or less, with remote data storage of at least 36 months.
Cooling tower water analysis
A one-time potable water analysis measuring calcium, magnesium, silica, chloride, and conductivity to determine allowable cycles of concentration.
Waste diversion rate
The percentage calculated as material recycled, composted, or reused divided by total waste generated over the performance period.
Ongoing purchasing credit
Rewards purchase of products meeting sustainability criteria in categories such as paper, cleaning products, furniture, and electronics, documented by purchase value.
O+M waste scope
O+M waste credits cover ongoing operational waste generated during the performance period, not construction and demolition waste.
Green cleaning product threshold
At least 75% of cleaning products by cost must meet third-party criteria such as Green Seal or UL ECOLOGO for the green cleaning credit.
Environmental tobacco smoke prerequisite
Prohibits smoking inside the building and within 25 feet of entries, outdoor air intakes, and operable windows; designated areas must be signed.
Occupant comfort survey
A survey conducted at least once during the performance period; results must be documented and corrective action taken for identified comfort issues.
Thermal comfort standard
Thermal comfort in LEED O+M is assessed against ASHRAE Standard 55, while ventilation is assessed against ASHRAE Standard 62.1.
BUG rating
The backlight, uplight, and glare rating system used to evaluate exterior luminaires for the light pollution reduction credit.
Transportation survey
A survey of occupants capturing commuting mode share, distance traveled, and vehicle miles traveled, entered into Arc for the transportation credit.
Site management prerequisite
Requires a site management policy addressing maintenance, snow and ice removal, fertilizer and pesticide use, and exterior cleaning practices.
LEED AP O+M eligibility
Candidates must hold a current LEED Green Associate credential and have documented experience on a LEED project within the last three years.
LEED AP O+M exam format
100 multiple-choice questions administered in two hours at a Prometric test center or through online proctoring; passing score is 170 of 200.
O+M continuing education
LEED AP O+M holders must earn 30 continuing education hours every two years, including at least 6 hours specific to the O+M rating system.
Professional conduct agreement
Credential holders agree to the USGBC credentialing agreement and code of conduct, prohibiting misrepresentation of credentials and requiring accurate project documentation.
Integrative process credit
A one-point credit requiring documented discovery analysis of energy and water system synergies performed during the performance period before decisions were finalized.
Integrative process documentation
A narrative describing the analysis performed, participants involved, and outcomes that informed operations decisions, submitted through Arc with supporting evidence.
Prerequisite enforcement
Every prerequisite in a category used must be met; failing any prerequisite prevents certification regardless of total points earned.