- Relevant cost
- A future cash flow that differs between alternatives. Sunk costs, committed fixed costs, and non-cash book values are excluded because they do not change with the decision.
- Opportunity cost
- The contribution or benefit forgone from the next best alternative use of a resource. It is a relevant cost even though no cash payment is made.
- Target cost
- Competitive market price minus the required profit margin. The resulting allowable cost drives design, value engineering, and process redesign before production begins.
- Life-cycle costing
- Accumulating all costs over a product's whole life, from research and design through production, distribution, and disposal, so design-stage decisions reflect total cost.
- High-low method
- Estimates the variable rate as the change in cost divided by the change in activity between the highest and lowest activity levels; fixed cost is the residual.
- Coefficient of determination
- r squared: the proportion of total variation in the dependent variable explained by the independent activity driver in a regression. A value near one indicates a strong fit.
- Learning curve
- Cumulative average model: each time cumulative output doubles, the average time per unit falls to a constant percentage of its previous average.
- Engineering cost estimate
- A cost estimate built from specification, time, and quantity studies rather than historical data. It suits new activities but is costly and may embed current inefficiency.
- Step-fixed cost
- A cost that stays constant over a range of activity and then jumps to a new level. Each relevant range must be estimated separately.
- Cost hierarchy
- Classification of overhead into unit-level, batch-level, product-sustaining, and facility-sustaining costs. Only unit-level costs vary proportionately with production volume.
- Activity-based costing
- Assigning overhead to products through activities: pool cost divided by driver quantity gives a rate, multiplied by each product's driver consumption.
- Over-absorption
- The excess of overhead absorbed using a predetermined rate over overhead actually incurred. It is credited to cost of sales at the period end.
- Production budget
- Budgeted sales units plus required closing finished goods units minus opening finished goods units. It drives material, labour, and overhead budgets.
- Flexed budget
- A budget restated at actual activity using standard variable cost per unit, while fixed costs remain at budgeted amount. It is the correct comparator for variance analysis.
- Zero-based budgeting
- Each activity and cost must be justified from a zero base rather than from last year's figure. It challenges slack but is time-consuming and costly.
- Principal budget factor
- The limiting factor, such as scarce material, skilled labour, or machine capacity, that restricts output. It is identified first and all other budgets are built around it.
- Material usage variance
- Standard quantity for actual output minus actual quantity used, multiplied by standard price. It isolates inefficient material consumption from price effects.
- Labour efficiency variance
- Standard hours for actual output minus actual hours worked, multiplied by standard rate. It measures productivity against the standard allowance.
- Sales mix variance
- Actual total quantity times the difference between actual and standard mix proportions, times standard contribution margin per unit. It isolates the effect of changing product mix.
- Planning variance
- The difference between the original standard and a revised standard, caused by forecasting error or changed conditions. It is separated from operating variances.
- Profit-maximising price
- The price at the output where marginal revenue equals marginal cost. Price is read from the demand curve at that quantity, not from total cost.
- Price elasticity of demand
- Percentage change in quantity demanded divided by percentage change in price. Demand is elastic when the absolute value exceeds one, so a price cut raises total revenue.
- Price skimming
- Setting a high launch price to capture value from early adopters and recover development cost, then reducing price as competition enters.
- Penetration pricing
- Setting a low initial price to build market share quickly, gain experience-curve cost reductions, and deter entrants.
- Minimum transfer price
- Variable cost of the selling division plus the opportunity cost of transferring internally. With spare capacity the opportunity cost is zero.
- Dual transfer pricing
- The selling division is credited at market price while the buying division is charged variable cost. The difference is absorbed centrally, motivating both divisions.
- Residual income
- Divisional operating profit minus the required rate of return multiplied by divisional investment. It encourages acceptance of projects earning above the required rate.
- Balanced scorecard
- A performance framework with financial, customer, internal process, and learning and growth perspectives, each with objectives, measures, targets, and initiatives.
- Controllability principle
- Managers should be assessed only on revenues, costs, and investments they can influence. Allocated head-office costs and uncontrollable items should be excluded from their appraisal.
- Sell or process further
- Process further only if incremental revenue from additional processing exceeds incremental cost. Joint costs incurred before split-off are sunk and irrelevant.
- Shut-down decision
- A segment is retained in the short run if its contribution covers avoidable fixed costs. Unavoidable allocated fixed costs do not affect the decision.
- Decision tree
- A diagram of sequential decisions and chance events with probabilities and payoffs. Expected values are rolled back from the branch ends to the first decision.
- Coefficient of variation
- Standard deviation divided by expected value. It measures risk relative to return, allowing comparison of projects with different expected values.
- Maximin criterion
- Choosing the alternative whose worst possible outcome is better than the worst outcome of every other alternative. It reflects a risk-averse attitude.
- Minimax regret
- Choosing the alternative that minimises the maximum opportunity loss, where regret is the difference from the best outcome for each state of nature.