32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Span of control
- The number of subordinates reporting directly to one manager. Wide spans flatten the hierarchy and cut cost but demand standardised work and capable staff; narrow spans add layers.
- Tuckman's stages
- Forming, Storming, Norming, Performing, Adjourning. Groups pass through these phases; conflict typically peaks at Storming before roles and norms stabilize.
- Accountability in delegation
- A manager may delegate authority and assign tasks, but remains answerable for results. Accountability cannot be passed downward; only authority and responsibility move.
- Grapevine communication
- Informal, person-to-person channel that spreads quickly and is often accurate on routine matters. It cannot be abolished, so managers use it to test reaction and correct rumour.
- SWOT and TOWS
- SWOT lists internal strengths and weaknesses with external opportunities and threats. TOWS cross-matches them into SO, ST, WO and WT strategies to convert analysis into action.
- Porter's generic strategies
- Cost leadership, differentiation, and focus (cost or differentiation focus). Firms failing to choose one and becoming stuck in the middle earn below-average returns.
- Five Forces model
- Rates industry attractiveness through rivalry, threat of new entrants, threat of substitutes, supplier bargaining power and buyer bargaining power. Strong forces compress industry profitability.
- Ansoff matrix
- Four growth options from existing and new products and markets: market penetration, product development, market development and diversification. Diversification carries the highest risk.
- BCG matrix
- Classifies business units as stars, cash cows, question marks or dogs by market growth and relative share. Cash cows fund stars and selected question marks; dogs are candidates for divestment.
- SMART objectives
- Specific, Measurable, Achievable, Relevant and Time-bound. Measurability is essential because unmeasured objectives cannot be monitored or controlled against plan.
- Human resource planning
- Forecasting future staffing demand against current supply and expected attrition. The gap, positive or negative, sets recruitment, training or redundancy requirements.
- Job description vs person specification
- The job description states duties, reporting lines and conditions of the post. The person specification states qualifications, skills and experience required, and drives selection criteria.
- Kirkpatrick evaluation levels
- Four training evaluation levels: reaction, learning, behaviour and results. Only the results level measures transfer into business performance such as productivity or quality.
- Herzberg's two factors
- Hygiene factors such as pay and working conditions prevent dissatisfaction but do not motivate. Motivators such as achievement, recognition and growth create genuine satisfaction and effort.
- Labour turnover rate
- Leavers during a period divided by average employees in that period, multiplied by 100. Departmental comparison reveals where retention problems concentrate.
- Break-even point
- Fixed costs divided by contribution per unit (price minus variable cost per unit). It gives the sales volume at which total revenue equals total cost and profit is zero.
- Margin of safety
- Actual or budgeted sales minus break-even sales, expressed as a percentage of actual sales. It measures how far sales can fall before a loss occurs.
- Current and quick ratios
- Current ratio is current assets divided by current liabilities. Quick ratio excludes inventory from assets, giving a stricter test of short-term liquidity.
- Material price variance
- (Standard price minus actual price) multiplied by actual quantity purchased. A positive result is favourable; a negative result is adverse and reduces budgeted profit.
- Net present value
- The sum of future cash flows discounted at the cost of capital, minus initial investment. A positive NPV means the project adds value; accept the project.
- Productivity ratio
- Output divided by input, such as units per labour hour. Multi-factor productivity combines inputs, which must first be converted to a common unit such as money.
- Little's Law
- Work-in-process equals throughput rate multiplied by flow time. Knowing two values yields the third, useful for sizing queues, buffers and process capacity.
- Economic order quantity
- The order size minimising combined ordering and holding costs: square root of (2 × annual demand × order cost ÷ holding cost per unit per year).
- Seven wastes of lean
- Overproduction, waiting, transport, over-processing, inventory, motion and defects. Overproduction is treated as the root waste because it creates the others.
- Six Sigma and DMAIC
- Six Sigma targets 3.4 defects per million opportunities. DMAIC (Define, Measure, Analyze, Improve, Control) is the structured method for improving existing processes.
- STP model
- Segmentation, Targeting and Positioning. The market is divided into groups, attractive segments are selected, and an offer is positioned in the customer's mind.
- Net Promoter Score
- Percentage of promoters (scores 9-10) minus percentage of detractors (scores 0-6). Passives scoring 7-8 are excluded. Range is minus 100 to plus 100.
- Customer lifetime value
- Average purchase value multiplied by purchase frequency and customer lifespan, then by gross margin. Compared with acquisition cost, it shows whether a customer is worth winning.
- Price elasticity of demand
- Percentage change in quantity demanded divided by percentage change in price. Demand is elastic when the absolute value exceeds 1, so price rises cut revenue.
- Contract essentials
- Offer, acceptance, consideration, intention to create legal relations and capacity. Missing an essential element can make an agreement void, voidable or unenforceable.
- Condition versus warranty
- A condition is a fundamental contract term; breaching it allows termination and damages. A warranty is a minor term; breach allows damages only, not termination.
- Negligence elements
- The claimant must prove a duty of care existed, the defendant breached it, the breach caused the loss, and the damage was not too remote.