Sri Lanka NVQ L3 Carpenter study plan
Sri Lanka NVQ L3 Carpenter · Give each week a clear focus.
8 weeks · About 6 hours per week
Occupational Health, Safety and Environment on the Carpentry Site & Tools, Equipment and Machinery for Carpentry
List the personal protective equipment required for sawing, chiselling, planning and site handling tasks, and state when each item must be worn
Identify five site hazards common to carpentry workshops and building sites, and describe one control measure for each
Demonstrate the safe setup and use of a circular saw and a hand plane, including guard checks, blade condition and clamping of the workpiece
Describe the correct storage, labelling and disposal of timber preservatives, solvents, adhesives and sawdust in line with environmental requirements
Explain the emergency and first-aid response for a deep cut and for eye injury from flying chips
Your checkpoint
A two-page hazard-and-control checklist covering at least 10 carpentry hazards, each with its PPE and control measure, written in your own words and checked against your own workshop
Tools, Equipment and Machinery for Carpentry & Materials, Timber Technology and Material Selection
Name the main hand tools and power tools used in carpentry and state the purpose of each in one sentence
Sharpen and set a hand saw and hone a chisel edge, then test the edge on end grain
Select timber for a given job by comparing species available locally on hardness, durability, shrinkage and cost
Distinguish between seasoning defects such as checks, shakes, warp and case hardening, and explain how each affects machining
Match three common sheet materials and two adhesives to appropriate interior and exterior applications
Your checkpoint
A tool-and-material reference sheet listing 15 tools with their purpose and maintenance point, plus a timber selection table for five species used in Sri Lankan carpentry
Setting Out, Measurement and Working Drawings & Materials, Timber Technology and Material Selection
Read a simple floor plan and elevation and extract all dimensions needed for setting out
Set out a rectangular building outline on the ground using the 3-4-5 method and check the diagonals for squareness
Convert scaled drawing dimensions to full size and record measurements in a consistent unit
Produce a cutting list from a working drawing for a simple item such as a door frame
Identify common drawing symbols for doors, windows, levels and section markers
Your checkpoint
A marked-up working drawing with a full setting-out sketch and a cutting list of at least 10 components, with diagonal checks recorded
Formwork and Shuttering for Concrete & Quantification, Estimation and Work Planning
Describe the components of formwork for a beam and a column, and explain how each part carries wet concrete load
Erect a small slab or beam formwork mock-up and check it for line, level, plumb and tightness at joints
Calculate the quantity of timber, plywood and props needed for a given slab area from a simple drawing
Explain stripping times and the sequence for safe removal of formwork
Prepare a two-day work plan for a formwork task showing labour, materials and sequence
Your checkpoint
A formwork take-off for one slab and one column, plus a photograph or sketch of your erected mock-up with a level and plumbness check recorded
Roof Framing and Roof Construction & Quantification, Estimation and Work Planning
Name the parts of a pitched roof, including ridge, rafters, purlins, wall plate, collar and barge board, and state the function of each
Calculate rafter length for a given span and pitch using the rise-and-run method
Mark and cut common rafters and a ridge for a small practice frame, keeping birdsmouth seats consistent
Estimate the quantity of roofing sheets, battens and fixings for a stated roof area
Sequence a roof erection plan showing safe access, lifting and temporary bracing
Your checkpoint
A cut and assembled half-scale or full-size roof frame section with a written rafter calculation and a materials estimate for a stated roof area
Doors, Windows, Fittings and Joinery & Flooring, Ceilings, Partitions and Interior Finishes
Set out and assemble a door frame and hang a door so that it swings freely with even gaps on all three sides
Fit a lock, hinges and a door closer correctly and test the operation of each
Describe the construction of a window frame and sash and identify the weatherproofing details
Install a partition frame, fix plasterboard or ceiling sheets, and finish joints ready for painting
Explain the sequence for laying a timber floor and for fixing a suspended ceiling grid
Your checkpoint
A hung door in its frame with fittings operating correctly, plus a written step-by-step procedure for the partition and ceiling task
Communication, Teamwork and Workplace Conduct & Quantification, Estimation and Work Planning
Give a clear five-minute verbal briefing to a small team on a carpentry task, including safety points and sequence
Write a short site instruction or progress note that is unambiguous and correctly dated and referenced
Prepare a simple estimate for a small carpentry job covering labour, material, wastage and overhead
Build a one-week work programme that sequences three tasks and shows dependencies
Describe how to raise a concern about unsafe work or a material shortage with a supervisor and record the outcome
Your checkpoint
A one-page job estimate and one-week work programme for a small carpentry job, presented verbally in five minutes and checked against a peer's questions
Occupational Health, Safety and Environment on the Carpentry Site & Setting Out, Measurement and Working Drawings & Formwork and Shuttering for Concrete & Roof Framing and Roof Construction & Doors, Windows, Fittings and Joinery & Flooring, Ceilings, Partitions and Interior Finishes
Revise all ten domains using a self-made summary sheet of key facts, formulas and safety rules
Complete a timed mock paper of at least 40 mixed questions and score it
Re-explain the three weakest topics aloud without notes
Re-check setting-out, rafter length and quantity calculations for errors under time pressure
Confirm your tools, PPE and calculation methods are ready for assessment conditions
Your checkpoint
A scored mock paper with a written list of your three weakest topics and a one-page correction plan for each
Milestones
Week 2: Can name 15 tools with purpose and maintenance point, and justify a timber choice for three different applications without notes
Week 4: Sets out a rectangle square within tolerance using the 3-4-5 method and produces a correct formwork take-off for a slab and column
Week 6: Hangs a door that swings freely with even gaps, and calculates rafter length correctly for two different pitches
Week 8: Scores at least 70 percent on the timed mock paper and can state the correct method for each previously weak topic