Hierarchy of control

The ranked order of risk-reduction measures, from eliminating a hazard through substitution, engineering controls and safe systems of work, down to personal protective equipment as the last resort.

Related: Risk assessment, Method statement
Risk assessment

A documented process of identifying hazards on a task or site, judging how likely and how severe the harm could be, and recording the controls that will reduce that risk to an acceptable level.

Related: Hierarchy of control, Method statement
Method statement

A written description of how a specific work activity will be carried out safely, setting out the sequence of steps, the plant and equipment used, and the control measures required.

Related: Risk assessment, Permit to work
Permit to work

A formal written authorisation issued before high-risk work begins, recording the precautions taken, the person in charge and the time limits, and requiring sign-off when the task is finished.

Related: Method statement, Isolation and lock-off
Near miss

An unplanned event that did not cause injury or damage but had the potential to do so, which must be reported so that the underlying cause can be corrected before a real incident occurs.

Related: Incident reporting, Toolbox talk
Toolbox talk

A short, focused briefing given to the work team at the start of a shift or task, covering the specific hazards, controls and any changes to the planned work for that day.

Related: Near miss, Method statement
Lone working

Carrying out plant or site tasks without another competent person present, which requires extra planning for communication, emergency rescue and first aid arrangements before work starts.

Related: Emergency procedure, Exclusion zone
Emergency procedure

The documented actions to take when fire, collapse, injury, spillage or another emergency occurs, including alarm signals, escape routes, assembly points and who to notify.

Related: Lone working, Isolation and lock-off
Pre-use inspection

A systematic check of the machine carried out by the operator before each shift or use, covering fluid levels, tyres or tracks, guards, alarms, lights, brakes and visible damage, with results recorded.

Related: Defect log, Daily checklist
Daily checklist

A printed or digital schedule listing the items to be inspected and confirmed during the pre-use check, signed by the operator so that the inspection can be evidenced and audited.

Related: Pre-use inspection, Defect log
Isolation and lock-off

Making a machine or system safe by disconnecting energy sources, locking the isolator in the off position and removing the key, so that it cannot be re-energised while work is in progress.

Related: Permit to work, Emergency procedure
Parking and shutdown procedure

The manufacturer's defined sequence at the end of use: stopping on firm level ground, lowering attachments, applying the parking brake, isolating the battery, securing the cab and removing the key.

Related: Pre-use inspection, Defect log
Rated capacity

The maximum load a machine or lifting accessory may safely handle under stated conditions, as set by the manufacturer and shown on the capacity plate or load chart.

Related: Load chart, Safe working load
Safe working load

The maximum permitted load for a lifting accessory or assembly in a given configuration, derived from its rated capacity and reduced where the slinging arrangement or angle demands it.

Related: Rated capacity, Sling angle
Load chart

A table or diagram supplied with a machine showing how much it can lift or carry at given radii, boom lengths and heights, and the configuration limits that apply.

Related: Rated capacity, Working radius
Working radius

The horizontal distance from the machine's slewing centre or tipping point to the load's centre of gravity, which determines the capacity available at that position.

Related: Load chart, Rated capacity
Sling angle

The angle between a sling leg and the horizontal when lifting, which governs the tension in each leg: shallower angles increase the load in the sling and reduce the safe working load.

Related: Safe working load, Rigging
Rigging

Selecting, attaching and configuring slings, shackles and other lifting accessories to connect a load to the lifting point safely, including protection against sharp edges and load control.

Related: Sling angle, Tag line
Tag line

A rope attached to a load so a person standing clear of the danger zone can control its rotation and swing without touching the load or standing under it.

Related: Rigging, Exclusion zone
Exclusion zone

A marked or barriered area around operating plant that only the authorised operator and signalled persons may enter, keeping others clear of slewing, tracked and falling-load hazards.

Related: Tag line, Banksman
Excavation support

Temporary shoring, trench boxes or battered sides used to prevent the collapse of excavation walls and protect people working inside the excavation.

Related: Service strike, Spoil heap
Service strike

Damage to an underground pipe or cable during excavation, which requires work to stop, the area to be evacuated and the utility owner to be contacted immediately.

Related: Cable avoidance tool, Excavation support
Cable avoidance tool

A locating device used with up-to-date service plans to detect buried pipes and cables before and during excavation, reducing the risk of striking live services.

Related: Service strike, Permit to work
Spoil heap

Excavated material placed at a controlled distance and height from the excavation edge so that it does not surcharge the sides, block access or fall back into the trench.

Related: Excavation support, Banksman
Banksman

A competent person who directs vehicle movements and lifting operations by agreed signals, standing in a safe position with a clear view of the operator and the load.

Related: Hand signals, Exclusion zone
Hand signals

An agreed set of arm and hand movements used to direct plant operators when speech or radio is impractical, which must be understood identically by signaller and operator before work starts.

Related: Banksman, Radio communication protocol
Radio communication protocol

The agreed channel, call signs, phrasing and emergency words used over site radios, including confirming that a message has been received and understood before acting on it.

Related: Hand signals, Banksman
Defect log

The record in which operators enter any fault or damage found on the machine, with the date, description and action taken, so that repairs can be tracked and the machine's status is known.

Related: Pre-use inspection, Out of service tag
Out of service tag

A clearly visible label attached to a defective machine or accessory stating that it must not be used until the fault is repaired and the tag is removed by an authorised person.

Related: Defect log, Isolation and lock-off
Planned preventive maintenance

Servicing carried out at the intervals and to the specification set by the manufacturer, intended to prevent breakdowns and keep the machine within its designed safety and emissions performance.

Related: Defect log, Lubrication schedule
Lubrication schedule

The manufacturer's list of grease points and fluid checks with their required intervals, which the operator or fitter follows to reduce wear and avoid premature component failure.

Related: Planned preventive maintenance
Spill kit

A stocked container of absorbent materials, booms, bags and disposal sacks kept on site so that a fuel, oil or hydraulic fluid spill can be contained and cleaned up immediately.

Related: Bunding, Waste segregation
Bunding

A raised, sealed surround around a fuel or oil storage tank or drum that holds at least the volume of the largest container, so leaks are captured instead of reaching ground or drains.

Related: Spill kit, Waste segregation
Waste segregation

Separating waste streams such as excavated spoil, metals, plastics, oils and hazardous liquids into correctly labelled containers so that each can be recycled, recovered or disposed of lawfully.

Related: Spill kit, Dust suppression
Dust suppression

Measures such as water sprays, damping down haul routes and covering loads that reduce airborne dust from cutting, loading and vehicle movement, protecting health and nearby residents.

Related: Waste segregation, Noise nuisance
Noise nuisance

Excessive or prolonged sound from plant that disturbs neighbours or damages hearing, controlled by choosing quieter machines, fitting silencers, limiting hours and providing hearing protection.

Related: Dust suppression, Toolbox talk
Site diary

The operator's day-by-day written record of work done, plant used, hours, weather, delays, instructions received and incidents, which supports progress reporting and later disputes.

Related: Defect log, Daily checklist
Competence card

A card evidencing that the holder has been trained, assessed and certificated for a specific plant category, and which must be produced on request before operating that machine.

Related: Method statement, Toolbox talk
Continuing professional development

Ongoing learning through refresher training, new-machine instruction and recorded experience that keeps an operator's knowledge current and demonstrates commitment to safe practice.

Related: Competence card, Risk assessment