NVQ L4 Refrigeration & AC flashcards
NVQ L4 Refrigeration & AC · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- A2L refrigerant flammability limit
- A2L refrigerants such as R-32 have a lower flammability limit of about 0.3 kg/m3, so ignition sources and ventilation must be controlled within the occupied space.
- Refrigerant vapour exposure limit
- The UK workplace exposure limit for R-134a and R-32 is 1000 ppm over an eight-hour reference period; atmosphere monitoring is required in plant rooms where leakage could accumulate.
- Confined space entry control
- Oxygen must be tested between 19.5% and 23.5% by volume before entry, with a permit to work, continuous monitoring and a rescue plan in place.
- Brazing nitrogen purge
- Passing oxygen-free nitrogen through pipework while brazing displaces air and prevents internal oxidation, which would otherwise form scale that damages compressors and expansion valves.
- Sensible heat ratio
- SHR is the sensible load divided by the total load; values below about 0.75 mean the latent load dominates and reheat or desiccant control may be needed.
- Refrigerant glide
- The temperature difference between the bubble and dew points of a zeotropic blend at constant pressure; R-407C glides about 5-7 K while R-410A glides under 0.5 K.
- Suction line pressure drop limit
- Suction lines are sized so that total pressure drop equals no more than about 1 K of saturation temperature, keeping capacity loss and compressor power within acceptable limits.
- Minimum oil return velocity
- Horizontal suction lines need at least 3-4 m/s and vertical risers 7-8 m/s to carry oil back to the compressor; dual risers maintain velocity at part load.
- Critical path float
- Float equals late start minus early start; activities on the critical path have zero float, so any delay to them directly delays the whole project completion date.
- F10 notification threshold
- A construction project must be notified to the HSE when it lasts more than 30 working days with more than 20 workers simultaneously, or exceeds 500 person-days.
- Schedule performance index
- SPI is earned value divided by planned value; a value below 1.0 means the project is behind schedule and progress is slower than the baseline forecast.
- Long-lead plant scheduling
- Chillers and large air handling units can take 12-20 weeks to deliver, so their order dates are set backwards from the required installation date.
- Strength pressure test
- Pipework is strength tested with oxygen-free nitrogen at 1.43 times the maximum allowable pressure, then leak tested at 1.1 times that pressure, following BS EN 378-2.
- Triple evacuation target
- Evacuate to below 500 microns (0.67 mbar) three times, breaking the vacuum with nitrogen between stages, to remove moisture and non-condensables before charging.
- Standing vacuum test
- After evacuation the vacuum should hold around 200-500 microns for at least one hour with no significant rise, proving the system is dry and leak-free.
- Air balancing tolerance
- Commissioned air volumes should be within plus or minus 10% of design figures at each terminal, achieved by proportional balancing from the index circuit.
- High superheat low suction
- High superheat with low suction pressure and a small evaporator temperature difference usually indicates undercharge, a liquid line restriction or a blocked filter drier.
- Non-condensable symptoms
- Air or nitrogen trapped in the system raises discharge pressure and subcooling and causes bubbles in the liquid sight glass even when the refrigerant charge is correct.
- Compressor winding resistance check
- Phase-to-phase resistances should be balanced within about 2%; a large imbalance, or insulation resistance below 1 MOhm at 500 V, indicates winding damage or moisture.
- Acid test on oil
- An acid test kit confirms oil contamination after a compressor burnout; a positive result requires an oil change, new filter driers and often suction line filtration.
- Carbon dioxide equivalent calculation
- Tonnes of CO2 equivalent equal the refrigerant charge in kilograms multiplied by its GWP and divided by 1000; this figure sets the leak check frequency band.
- F-gas leak check frequency
- Systems containing 5 tCO2e or more need checks every 12 months, 50 tCO2e every 6 months and 500 tCO2e every 3 months; fitted detection systems halve the intervals.
- Refrigerant recovery obligation
- Refrigerant must be recovered before equipment is dismantled or disposed of; venting to atmosphere is prohibited and recovered gas must be recycled, reclaimed or destroyed.
- GWP of R-410A
- R-410A has a GWP of 2088, so a 10 kg charge equals about 20.9 tCO2e, which places the system in the six-monthly leak check band.
- Toolbox talk record
- A short documented briefing given before a task; the attendance record and content provide evidence of supervision and competence control under health and safety law.
- SMSTS supervisor certification
- The Site Management Safety Training Scheme certificate shows a supervisor's health and safety knowledge and is commonly required on UK construction sites for managing work teams.
- GROW coaching model
- Goal, Reality, Options, Will: a structured conversation a supervisor uses to draw the solution from the technician rather than simply issuing an instruction.
- Herzberg two-factor theory
- Hygiene factors such as pay and conditions only prevent dissatisfaction; motivators such as recognition, responsibility and achievement are what actually raise a team's engagement.
- Inspection and test plan
- An ITP lists the inspections, tests and records required at each stage of the work, marking hold points where work cannot continue without a signed release.
- Five whys root cause
- Repeatedly asking why a failure occurred, typically five times, moves the analysis past symptoms to the underlying process or design cause.
- Chiller specific power
- Chiller efficiency expressed as kW of electrical input per kW of cooling; a machine with a COP of 3.0 has a specific power of 0.333 kW/kW.
- PDCA improvement cycle
- Plan, Do, Check, Act: a repeating cycle used to trial a change, measure its effect and standardise what works before starting the next improvement.