MA Land Surveyor study materials
MA Land Surveyor study resources

MA Land Surveyor flashcards

MA Land Surveyor · Build recall with a focused review session.

33 cards. Read the term and the definition here. The deck at the top of this page is optional.

Monument controls over distance
In boundary retracement, an original, undisturbed monument called for in the deed generally controls over courses, distances, and area stated in the deed.
Adverse possession period
Massachusetts requires 20 years of actual, open, notorious, exclusive, continuous, and hostile possession under G.L. c. 260 § 21 to acquire title by adverse possession.
Mean high water line
The boundary between private upland and Commonwealth-owned tidal flats in Massachusetts; the state holds title below this line subject to the Colonial Ordinance of 1641-1647.
ANR plan
An Approval Not Required plan endorsed by the planning board when a division of land does not create a new way or require subdivision approval under G.L. c. 41 § 81P.
Combined factor
The product of the grid scale factor and the elevation factor, used to convert between grid distances on the State Plane Coordinate System and ground distances.
Curvature and refraction
Correction to leveling or trigonometric leveling of about 0.0206 times the distance in kilometers squared, in meters, accounting for Earth curvature and atmospheric refraction.
Latitude and departure
Latitude equals distance times cosine of azimuth (northing change); departure equals distance times sine of azimuth (easting change) in a traverse.
Compass rule adjustment
A traverse adjustment distributing closure error in latitude and departure proportionally to the length of each course, also called the Bowditch rule.
Horizontal curve tangent
The tangent distance T equals R times the tangent of half the intersection angle, where R is the curve radius and the angle is the deflection between tangents.
Degree of curve
The central angle subtended by a 100-foot arc under the arc definition; D equals 5729.58 divided by the radius in feet.
Vertical curve elevation
Elevation equals PVC elevation plus g1 times x plus (g2 minus g1) times x squared divided by twice the curve length, with x measured from the PVC.
Standard error of mean
The standard deviation of repeated observations divided by the square root of the number of observations; it decreases as more observations are averaged.
Least squares adjustment
An adjustment method minimizing the sum of weighted squared residuals; the solution uses normal equations with the design matrix and weight matrix.
Precision versus accuracy
Precision is the repeatability of measurements; accuracy is closeness to the true value. Systematic errors reduce accuracy without necessarily reducing precision.
Standardized residual
A residual divided by its standard deviation in a least squares adjustment; values exceeding about 3 commonly indicate a blunder in the observation.
NAD83 (2011)
The current horizontal datum realization used in Massachusetts; coordinates must document the datum and epoch, and transformations from older datums must be recorded.
NAVD88
The vertical datum used for orthometric heights in Massachusetts; ellipsoid heights from GNSS are converted using a geoid model such as GEOID18.
State Plane projection
Massachusetts uses the Lambert Conformal Conic projection for its State Plane zones; grid distances differ from ground distances by the combined factor.
RTK verification
Real-time kinematic GNSS positions should be checked by a second occupation or independent control because multipath and canopy can degrade accuracy.
Balanced sight distances
In differential leveling, keeping backsight and foresight distances equal cancels curvature, refraction, and instrument collimation errors.
Average end area method
An earthwork volume method using the average of two cross-sectional areas multiplied by the distance between them; volumes in cubic yards equal cubic feet divided by 27.
Prismoidal correction
A volume correction of L/6 times (A1 plus 4Am plus A2) that improves accuracy over the average end area method for varying cross sections.
Easement by necessity
An implied easement arising when a parcel is landlocked by a common grantor's conveyance; it is limited to the reasonable access needs of the parcel.
Prescriptive easement
A right to use another's land acquired by 20 years of open, notorious, continuous, and adverse use in Massachusetts, limited to the use actually exercised.
Boundary by acquiescence
A doctrine fixing a boundary where adjoining owners treat a line as the boundary for a long period, even without the full statutory period.
Avulsion versus accretion
Gradual, imperceptible accretion moves a water boundary; a sudden avulsive change does not alter the boundary line.
Proportionate measurement
A method of reestablishing a lost corner by distributing the record distance proportionally along the line between found original monuments.
Witness corner
A monument set near a corner to reference it when the corner itself cannot be marked; the witness corner is not the legal corner.
Land Court registration
Massachusetts registered land system in which the Land Court approves plans and decrees title; registered boundaries are not altered by adverse possession.
Subdivision Control Law
G.L. c. 41 §§ 81K-81GG governs subdivision plans and requires planning board approval for divisions creating new ways or frontage.
Wetlands Protection Act
G.L. c. 131 § 40 and 310 CMR 10.00 define resource areas and buffer zones; surveys may need to locate wetland flags and limits.
ALTA/NSPS survey
A survey standard where Table A items are specified in the contract and the surveyor certifies to named parties as of a stated effective date.
Seal and certification
A Massachusetts surveyor signs and seals only work prepared or directly supervised, certifying accuracy to named parties within the surveyor's competence.