MB-330 study materials
MB-330 study resources

MB-330 study plan

MB-330 · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Implement product information management

  • Configure product dimensions, storage dimension groups, and tracking dimension groups, then justify each choice for three differently tracked items

  • Create five product masters with predefined variants and assign attribute values and category hierarchy nodes to each

  • Build a three-level category hierarchy with attribute types and attach it to released products

  • Release products and demonstrate a lifecycle state transition, a translation, and three product relationship types (upsell, cross-sell, substitute)

Your checkpoint

A sandbox containing five product masters with at least 15 released variants, one three-level category hierarchy, one lifecycle transition, and a one-page decision table explaining every dimension and item model group choice

Week 2

Implement product information management & Implement inventory and asset management

  • Define unit conversions and bar codes for the released products and validate them on a purchase order line

  • Set up inventory model groups for FIFO, weighted average, and standard cost, and assign them to item groups

  • Post movement, adjustment, and transfer journals and reconcile the resulting on-hand balances by site and warehouse

  • Configure inventory blocking and reservation, and show how marking affects a specific transaction settlement

Your checkpoint

A posted journal log with at least six transactions across three warehouses and a reconciliation sheet where calculated on-hand matches the inventory on-hand report to zero units

Week 3

Implement inventory and asset management

  • Execute a complete inventory close and adjustment run and reconcile settlements for FIFO and weighted average items

  • Configure and run a counting journal plus a tag counting process, then post the resulting adjustments

  • Create a quarantine order, a nonconformance record, and a quality order linked to a batch-controlled item

  • Set up two assets inside a functional location, raise a maintenance request, and convert it into a corrective work order attached to a preventive maintenance plan

Your checkpoint

A closed-inventory period with a variance report showing zero unexplained differences, alongside a documented quality-to-quarantine-to-nonconformance flow and one completed work order with a cost roll-up

Week 4

Implement master planning

  • Configure coverage groups, lead times, safety stock, and positive/negative days for at least four item classes

  • Set up a master plan, enter a demand forecast, and reduce it against firm orders

  • Run planning optimization and interpret planned purchase, transfer, and production orders, including action and delay messages

  • Firm at least three planned orders and confirm the resulting supply covers the demand date correctly

Your checkpoint

A 30-day planning run with a written trace of five planned orders from demand signal to firmed order, plus a table of every action message and the decision taken on it

Week 5

Implement master planning & Implement warehouse management and transportation management

  • Apply capability-to-promise and safety-stock replenishment to a constrained item and compare the outcome with the base plan

  • Model an intercompany planning scenario and validate the resulting planned transfer orders

  • Configure a warehouse with sites, warehouses, locations, and location profiles, and enable warehouse management processes on a test item

  • Create location directives and work templates for a purchase order receipt flow

Your checkpoint

A planning notebook covering three scenarios (base, constrained, intercompany) plus a WMS-enabled warehouse where a purchase order receipt generates work and a put directive without manual intervention

Week 6

Implement warehouse management and transportation management

  • Build wave templates, work templates, and load templates for an outbound sales order flow and release a wave end to end

  • Execute receiving, put-away, picking, and packing on the warehouse management mobile app using license plates and containers

  • Configure cycle counting and replenishment (min/max and demand-based) and trigger a replenishment work order

  • Set up cluster picking and cross-docking for a high-volume scenario and verify the work lines generated

Your checkpoint

One complete inbound-to-outbound cycle executed on the mobile app with screenshots or screen notes at each step, plus a work line audit table showing every generated and closed work header

Week 7

Implement warehouse management and transportation management & Implement and manage supply chain processes

  • Configure shipping carriers, rate engines, and transit time engines, then rate a load and compare two carrier options

  • Build loads, plan routes, and reconcile a freight invoice against a transportation rate

  • Configure purchase requisitions, an RFQ, and a purchase agreement, and convert each into downstream documents

  • Set up a sales order lifecycle with credit limit checking, a sales agreement, and a return order

Your checkpoint

A rated and routed load with a freight reconciliation showing an accepted or rejected match, plus a procurement-to-pay and order-to-cash document chain summary with document numbers at every hop

Week 8

Implement and manage supply chain processes & Implement product information management & Implement inventory and asset management & Implement warehouse management and transportation management & Implement master planning

  • Re-run one end-to-end scenario that touches all five domains without referencing notes

  • Audit your weakest two domains by scoring a timed 60-question practice set and logging every missed item by domain

  • Re-teach the five most-missed concepts in writing, each in under 150 words

  • Build a one-page index of setup forms and menu paths you still hesitate on

Your checkpoint

A timed 60-question practice attempt at or above 80 percent overall with no domain below 70 percent, plus a remediation sheet listing each missed item, its root cause, and the fix applied

Milestones

Week 2: Can create a product master, release variants, post an inventory journal, and explain the difference between storage and tracking dimensions without notes - verified by a 15-question self-quiz at 80 percent or better

Week 4: Can run master planning end to end and explain every action message on the output, with the planning trace document complete for five planned orders

Week 6: Can execute a wave-driven outbound shipment on the mobile app and articulate each setup prerequisite from location directive to work template, demonstrated in one uninterrupted walkthrough

Week 8: Practice exam score at or above 80 percent overall and at or above 70 percent in each of the five domains, with the remediation sheet fully populated