MB-700 study materials
MB-700 study resources

MB-700 study plan

MB-700 · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Define solution strategies

  • Map the five subareas of solution strategy definition (business requirements, data model, security, integration, ALM) to the MB-700 skills outline

  • Draft a one-page requirements traceability matrix for a hypothetical Dynamics 365 implementation, linking each business goal to a functional area

  • Compare fit-gap vs. process-first approaches and write a 150-word recommendation for a mid-size client

  • List the decision criteria for choosing between model-driven, canvas, and Power Pages apps in a solution architecture

Your checkpoint

A 2-page solution strategy brief (requirements matrix + app-type decision rationale) for a fictional client scenario, saved as a PDF.

Week 2

Define solution strategies

  • Decompose a business process into Dynamics 365 apps and modules, justifying each mapping

  • Design a data model (entities, relationships, ownership) for a customer-service scenario and validate it against reporting needs

  • Identify three integration patterns (real-time, batch, event-driven) and select one for a given latency and volume requirement

  • Document non-functional requirements (performance, availability, compliance) and translate them into architectural constraints

Your checkpoint

An architecture decision record (ADR) set of 4 records covering app mapping, data model, integration pattern, and non-functional constraints.

Week 3

Define solution strategies & Architect solutions

  • Translate the week-2 data model into a security model (business units, teams, roles, field security profiles)

  • Evaluate licensing and capacity implications of the proposed solution using Microsoft Learn licensing modules

  • Define an environment strategy (dev, test, UAT, prod) with solution layering and managed vs. unmanaged decisions

  • Produce a risk register with 5 architectural risks and mitigations

Your checkpoint

A security and environment strategy document (3 pages) plus a 5-item risk register with likelihood, impact, and mitigation.

Week 4

Architect solutions

  • Compare Power Platform and Dynamics 365 first-party capabilities against custom development for three scenarios

  • Design a coexistence and migration path from a legacy CRM to Dynamics 365, including data volume and cutover considerations

  • Evaluate ALM tooling (Power Platform CLI, Azure DevOps pipelines, solution checker) and select a pipeline design

  • Draft a high-level solution blueprint that integrates the week 1-3 artifacts into a single architecture narrative

Your checkpoint

A 5-page solution blueprint with architecture diagram (components, integrations, environments) and a one-page executive summary.

Week 5

Architect solutions & Manage implementations

  • Define the implementation project phases (discovery, design, build, test, deploy, hypercare) with entry and exit criteria

  • Build a RACI matrix for a 10-person implementation team covering functional, technical, and PM roles

  • Identify the top 5 implementation risks (scope creep, data quality, adoption) and write mitigation actions

  • Map the solution blueprint to a work breakdown structure with estimated effort per workstream

Your checkpoint

An implementation plan (WBS + RACI + phase gate criteria) in a spreadsheet or table format.

Week 6

Manage implementations & Manage testing

  • Design a test strategy covering unit, system integration, UAT, regression, and performance testing for a Dynamics 365 rollout

  • Write 10 test cases (given/when/then) for the highest-risk business processes identified in week 5

  • Define defect triage severity levels and a resolution SLA aligned to project phase

  • Plan a data migration rehearsal with validation checkpoints and rollback criteria

Your checkpoint

A test plan document (strategy, 10 test cases, defect SLA, migration rehearsal checklist).

Week 7

Manage testing & Architect solutions

  • Create a UAT execution plan with participant roles, schedule, and sign-off criteria

  • Design a go-live readiness checklist covering cutover, training, support model, and rollback

  • Review the full architecture against the test results and identify any design gaps requiring rework

  • Prepare a 10-question self-assessment covering all four MB-700 domains and score it honestly

Your checkpoint

A go-live readiness checklist and a scored self-assessment with a list of weak areas to revisit in week 8.

Week 8

Architect solutions & Define solution strategies & Manage implementations & Manage testing

  • Revisit weak areas from the week-7 self-assessment and close knowledge gaps using targeted Microsoft Learn modules

  • Complete two timed practice sets (at least 40 questions each) and review every incorrect answer

  • Summarize the 10 most commonly confused MB-700 concepts in your own words

  • Finalize a one-page exam-day strategy covering question triage, time allocation, and flagging approach

Your checkpoint

A personal exam readiness sheet (weak-area closure log + practice scores + one-page strategy).

Milestones

Week 2: Can explain, without notes, how to map a business process to Dynamics 365 apps and justify the data model choices in the ADR set.

Week 4: Solution blueprint is complete and internally consistent: every business requirement traces to a component, and every component has an environment and security decision.

Week 6: Test plan covers all required test levels and includes at least 10 concrete test cases with expected results; defect SLA is defined.

Week 8: Scored at least 80% on both timed practice sets and closed all items on the weak-area list from week 7.