Septic Setback on a Tight Lakeside Lot

ME Well Driller · Put your knowledge to work in context.

All case studies

Septic Setback on a Tight Lakeside Lot

A landowner proposes a new 6-inch bedrock well for a seasonal cottage on a 1.1-acre lot. The site is on a 12% slope; a test pit shows 32 ft of sand and gravel over bedrock, with seasonal high groundwater at 4 ft. The proposed borehole is 80 ft from the edge of the septic absorption field, 25 ft from the property line, and 75 ft from a seasonal stream. An existing dug well is 40 ft away and will remain in use. The driller plans 6-inch casing to 42 ft, grout to surface, and a 20-inch riser. The homeowner wants the well as close to the cottage as possible to avoid a long trench and asks whether the slope can justify the 80-ft separation from the septic field. The local plumbing inspector has not yet reviewed the revised septic plan.

1. Evaluate the proposed location. Which separation is a problem, and does the 12% slope justify a reduction?

Read the worked answer

The 80-ft separation to the septic absorption field does not meet Maine's minimum isolation distance of 100 ft for a private well. Slope does not substitute for horizontal separation: contaminants move with groundwater, and the rule is a horizontal minimum. The 25-ft property-line distance may also be short under local ordinance, so check it. The 75-ft distance to the seasonal stream is likely acceptable for the state minimum but may be regulated locally. Do not drill at the proposed spot. Relocate the well at least 100 ft from the absorption field and any reserve area, then recheck the property line, stream, and existing dug well. The existing dug well 40 ft away is a potential pathway if its casing or cover is deteriorated; it should be evaluated and either upgraded or properly abandoned before the new well is relied on.

2. Specify casing, grout, and surface completion. Is 42 ft of casing correct?

Read the worked answer

With 32 ft of overburden, casing must reach at least 10 ft into bedrock, so 42 ft is the minimum; use 6-inch casing to 42 ft or deeper if the rock is fractured. The annulus should be grouted from the bottom of the casing to ground surface with neat cement or bentonite slurry, placed by tremie, not dumped from the top. Because seasonal high water is at 4 ft, the surface seal is critical: extend casing at least 18 inches above grade, install a sanitary cap and pitless adapter, slope the ground away, and divert surface water. Do not create a pit that can collect water. Check grout volume against the theoretical annular volume; lost returns must be handled, not ignored.

3. If the lot has no location 100 ft from the septic field, what should the driller do?

Read the worked answer

Do not drill and do not rely on a verbal OK. The driller should tell the owner and designer that the state minimum is not met and that the septic system or building plan must be reconfigured. Options include moving the absorption field, using an alternative septic design, or obtaining a written variance from the authority having jurisdiction if the rule allows one. The driller should document the refusal and the reason in the file. Drilling first and asking later exposes the driller to enforcement, liability, and a well that may not be approved for the certificate of occupancy.