Michigan regulates asbestos abatement work through a state accreditation program administered by the Michigan Department of Environment, Great Lakes, and Energy (EGLE). Contractors, supervisors, and workers who disturb asbestos-containing material in schools, public and commercial buildings must hold the appropriate Michigan credential, and abatement projects are subject to notification, work-practice, and clearance requirements modeled on the federal NESHAP and AHERA frameworks. The MI Asbestos Abatement case studies are 5 cases and about 2,550 words.

1

Monday Mobilization After a Friday Notification

A Michigan school district plans to remove 300 linear feet of friable pipe insulation and 50 square feet of vinyl asbestos floor tile from a boiler room during spring break. The abatement contractor schedules mobilization for Monday at 7 a.m.

529 words, about 3 min
2

Pleural Plaques, Smoking, and an Expired Respirator Clearance

During a routine site visit at a manufacturing plant, a 47-year-old maintenance mechanic tells the safety manager that he has smoked one pack per day for 25 years and has increasing shortness of breath. He has worked in the plant for 14 years, regularly repairing steam traps and pipe insulation that the plant assumes contains asbestos.

530 words, about 3 min
3

Negative Joint Compound Samples in a 1968 Renovation

A 1968 university building is being renovated. The corridor ceiling and lighting will be replaced, and one wall will be opened for a new doorway.

492 words, about 2 min
4

Glovebag Tear With a Bearded Worker and No Shower

A hospital maintenance contractor is removing asbestos-containing insulation from six steam valves in an occupied mechanical room. The work is done with glovebags, and the contractor plans three valves per day.

497 words, about 2 min
5

Averaging a Clearance Failure and Open Dumpster Waste

A contractor has removed 2,400 square feet of 9-inch by 9-inch floor tile and black mastic from a vacant office suite. The tile was removed with a low-speed floor machine and wet methods; the mastic was softened with solvent and scraped.