- Risk appetite
- The amount and type of risk an organization is willing to pursue or retain in pursuit of its objectives, formally approved by the governing body and expressed in measurable terms.
- Risk tolerance
- The acceptable variation or deviation around the stated risk appetite that an organization can withstand before triggering escalation or corrective action by management.
- Residual risk
- The level of risk remaining after existing controls and treatments have been applied; it is the basis for formal acceptance decisions and board reporting.
- Three lines model
- Governance structure where operational management owns risk, a risk and compliance function provides oversight and challenge, and internal audit gives independent assurance.
- Risk owner
- The accountable individual with authority to manage a specific risk, including approving and funding treatment, distinct from the person executing control tasks.
- Risk statement structure
- A well-formed risk is expressed as cause leading to event leading to consequence, tied to a specific business objective, rather than a vague category label.
- Asset inventory
- A maintained register of hardware, software, data, people, facilities, and third parties, each with a unique identifier, owner, classification, and location.
- Data classification
- Assignment of data to tiers such as public, internal, confidential, or restricted, which determines handling rules, access controls, retention, and protection requirements.
- Dependency mapping
- Identifying upstream suppliers, downstream customers, and internal service chains so the blast radius of a single failure becomes visible and manageable.
- Annualized loss expectancy
- ALE = single loss expectancy multiplied by annualized rate of occurrence; it expresses expected yearly financial loss for a given risk scenario.
- Single loss expectancy
- SLE = asset value multiplied by exposure factor, representing the expected monetary loss from one occurrence of a threat event against an asset.
- Bow-tie analysis
- A diagram placing a central event between causes on the left and consequences on the right, with preventive controls on causes and mitigating controls on consequences.
- FAIR methodology
- A quantitative risk model decomposing risk into frequency (threat event frequency times vulnerability) and magnitude (primary plus secondary loss), often simulated with Monte Carlo.
- FMEA
- Failure mode and effects analysis scores severity, occurrence, and detection for each failure mode; the risk priority number is their product.
- Risk criteria
- Documented thresholds, appetite limits, and regulatory constraints against which analyzed risk is compared to decide whether to accept, treat, transfer, or avoid.
- Risk velocity
- The speed at which a risk event materializes and causes impact; high-velocity risks warrant prioritization beyond their static score alone.
- Risk aggregation
- Combining individual risk exposures into a portfolio view, accounting for dependencies and shared controls rather than simply summing individual scores.
- Treatment cost-benefit
- A control is justified when the expected reduction in annualized loss exceeds the total cost of ownership of implementing and operating it.
- Compensating control
- An alternative safeguard used when a primary control is infeasible, providing equivalent risk reduction and documented as a substitute in the control record.
- Defense in depth
- Layering preventive, detective, and corrective controls so that failure of any single control does not result in unmitigated loss.
- Statement of applicability
- A document listing which controls are applied, which are excluded, and the justification for each exclusion, used as audit and certification evidence.
- Control effectiveness
- The degree to which a control reduces inherent risk to residual risk; measured through design effectiveness and operating effectiveness testing over time.
- Key risk indicator
- A leading metric with defined thresholds and an owner that signals rising or falling exposure before losses occur, enabling proactive management action.
- Risk register
- The central record of identified risks with description, cause, consequence, owner, inherent and residual scores, treatments, status, and review dates.
- Escalation criteria
- Predefined triggers such as threshold breach, repeated control failure, emerging risk, or material context change that require reporting to higher authority.
- Vendor tiering
- Classifying third parties by data sensitivity, system access, and business dependency to determine assessment depth and monitoring frequency.
- Fourth-party risk
- Exposure arising from a vendor's own subcontractors and suppliers, which can propagate failures not visible in direct vendor assessments.
- Right to audit clause
- A contract provision allowing the customer to examine a vendor's controls, records, and environments, often satisfied through independent attestation reports.
- Data subject rights
- Entitlements such as access, rectification, erasure, portability, and objection that organizations must operationalize within regulatory timeframes.
- Records retention schedule
- A documented plan specifying how long each record class is kept, reflecting legal, regulatory, and contractual minimums and maximums.
- Recovery time objective
- The target duration within which a business process or system must be restored after disruption, set below the maximum tolerable downtime.
- Recovery point objective
- The maximum acceptable amount of data loss measured in time, determining backup and replication frequency for a given system.