MEngC PE Electrical Building Services study materials
MEngC PE Electrical Building Services study resources

MEngC PE Electrical Building Services study plan

MEngC PE Electrical Building Services · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Electrical power systems and distribution design for buildings

  • Derive and compare the design current, voltage drop and protective-device rating for a three-phase submain feeding a mixed office and plant load, and justify each choice in writing.

  • Explain how TN-S, TN-C-S and TT supply arrangements in a building change the fault path and the required protective measure, using a one-line sketch you draw yourself.

  • Size a distribution board schedule by allocating final circuits to ways and totalling connected load and diversified demand per board.

  • State the key selection and erection requirements you would apply to a main switchboard and rising busbar in a multi-storey building, and note where you would verify against the local wiring code.

Your checkpoint

A hand-drawn single-line diagram with a board schedule for a 6-storey building, including design currents, voltage drop at the furthest load, and a written justification of each protective device rating.

Week 2

Electrical power systems and distribution design for buildings & Protection, switching, cables and fault current calculations

  • Calculate prospective short-circuit current at two points in a radial distribution system from transformer impedance and cable impedance, showing each step.

  • Select cable cross-sectional area for a given load using current-carrying capacity, derating factors for grouping and ambient temperature, and voltage drop, then check the earth fault loop impedance against the disconnection time.

  • Compare the operating characteristics of MCBs, MCCBs and fuses for overload and short-circuit protection and state where each is appropriate in a building distribution system.

  • Explain discrimination and cascading between upstream and downstream devices and identify one arrangement in your own design where discrimination is critical.

Your checkpoint

A fault-current and cable-sizing calculation sheet for one radial feeder showing Ib, In, Iz, voltage drop percentage and Zs against the maximum permitted value.

Week 3

Building services electrical loads, demand and energy management

  • Build a maximum demand estimate for a building using diversity after diversity, and compare the result with a direct VA-per-square-metre method.

  • Assess the impact of large motor loads on demand and starting current and propose a starting method that keeps voltage dip within an acceptable limit.

  • Identify the main opportunities for energy reduction in a building services load profile, including power factor correction and load shifting, and estimate the saving for one measure.

  • Explain how sub-metering and energy monitoring data would be used to verify a design assumption about demand.

Your checkpoint

A one-page maximum demand and diversity calculation for a mixed-use building with a table of connected load, diversity factor applied and resulting demand per board.

Week 4

Lighting design, controls and energy efficiency

  • Calculate the maintained illuminance, number of luminaires and uniformity for an office using the lumen method, and state the assumptions for maintenance factor and reflectance.

  • Select luminaire types and control strategies for an office, a circulation area and a plant room, and justify each against visual task and energy use.

  • Explain the requirements for emergency lighting in escape routes and open areas and size a battery-backed luminaire set for a given duration.

  • Describe how daylight linking and occupancy sensing interact with manual switching and where the control strategy would conflict with occupant needs.

Your checkpoint

A lighting design calculation for one office room including luminaire schedule, lumen method calculation, control narrative and emergency lighting provision.

Week 5

Earthing, bonding, lightning protection and electrical safety & Fire detection, alarm and life safety electrical systems

  • Design an earthing and bonding arrangement for a building with a TN-C-S supply and a separate structural steel earth, and identify the main protective bonding conductors required.

  • Explain the principle of a lightning protection system, the role of the air termination, down conductor and earth termination, and how you would determine the need for protection.

  • Trace the sequence of operation of a fire detection and alarm system from detector activation to sounder operation and interface with other systems.

  • Describe the electrical requirements for life safety systems, including fire-rated cable routes and the supply arrangement for fire pumps and smoke control.

Your checkpoint

An earthing and bonding schematic plus a fire alarm cause-and-effect matrix for a simple three-storey building, covering detection zones, sounders and one interface to a door release.

Week 6

Standby and emergency power, UPS and generators

  • Size a standby generator for a building load that includes motors and a UPS, accounting for starting kVA, step loading and derating for altitude and temperature.

  • Compare the operating principles and appropriate applications of an online double-conversion UPS and a line-interactive UPS, and state the battery autonomy you would specify for a given duty.

  • Design the changeover arrangement between utility and generator supply, including interlocking and the neutral earthing arrangement, and explain the risk of parallel operation.

  • Explain the testing and maintenance regime you would require for a standby generator and a UPS system.

Your checkpoint

A standby power single-line diagram with generator and UPS sizing calculations, changeover arrangement and a written test and maintenance schedule.

Week 7

Building automation, controls and ELV/ICT systems & Codes, standards, contracts, ethics and professional practice

  • Describe the layered architecture of a building automation system and explain how a field bus, a controller and a supervisory layer exchange data.

  • Specify the points list for a small plant room, covering temperature, pressure, status and command points, and state the alarm and trending requirement for each.

  • Explain the contractual roles of employer, engineer, contractor and subcontractor in a building services project and identify where design responsibility sits for a design-and-build element.

  • Apply a professional ethics scenario about a design change that reduces cost but compromises safety, and set out the action you would take and to whom you would report.

Your checkpoint

A building automation points list for one plant room with a short written answer to an ethics scenario, citing the applicable standard or code clause you would rely on.

Week 8

Electrical power systems and distribution design for buildings & Protection, switching, cables and fault current calculations & Codes, standards, contracts, ethics and professional practice

  • Re-solve two fault-current and cable-sizing problems under timed conditions without notes and check against your earlier calculation sheets.

  • Review your weak areas from weeks 1 to 7 and rewrite the two weakest topics as concise reference notes you can revise from.

  • Work through a full building services electrical design scenario that combines distribution, protection, standby power and life safety, and state the interfaces between them.

  • Confirm the current edition of each standard you rely on and note any clause numbers you are unsure of for further checking.

Your checkpoint

A timed mock design exercise completed in one sitting with a self-marked error log listing every mistake, its cause and the reference note that fixes it.

Milestones

Week 2: Can complete a fault-current and cable-sizing calculation unaided from transformer to final circuit and state Zs against the maximum permitted value without referring to notes.

Week 4: Can produce a full maximum demand estimate and an office lighting calculation from blank paper, with all assumptions stated and defensible.

Week 6: Can draw the earthing, fire alarm and standby power interfaces for a three-storey building on one sheet and explain the sequence of operation for each.

Week 8: Scores at least 70 percent on the timed mock design exercise and has a written error log with no unresolved clause references.