MEngC R.S.E Part-I Civil key terms
MEngC R.S.E Part-I Civil · Get comfortable with the vocabulary.
- Limit State Method
- Related: Partial Safety Factor, Characteristic Strength
A design philosophy that checks a structure against two conditions: the ultimate limit state, where collapse or loss of equilibrium is possible, and the serviceability limit state, where deflection, cracking or vibration makes the structure unfit for normal use.
- Characteristic Strength
- Related: Partial Safety Factor, Limit State Method
The strength value below which no more than a stated small percentage, usually 5 percent, of test results are expected to fall. It forms the statistical basis for material grades such as M25 concrete or Fe500 steel.
- Partial Safety Factor
- Related: Characteristic Strength, Limit State Method
A multiplier applied separately to loads and to material strengths so that design accounts for uncertainty in loading, workmanship and material variability. Load factors exceed one while material factors reduce nominal strength.
- Balanced Section
- Related: Under-Reinforced Section, Ductility
A reinforced concrete section proportioned so that concrete crushing and steel yielding occur simultaneously at ultimate load. Its steel percentage marks the boundary between under-reinforced ductile behaviour and over-reinforced brittle behaviour.
- Under-Reinforced Section
- Related: Balanced Section, Ductility
A section with steel content below the balanced value, so the tension steel yields before the concrete crushes. Failure is gradual and gives visible warning, which is why codes require ductile behaviour in flexure.
- Prestressing
- Related: Post-Tensioning, Creep
Deliberate introduction of compressive stress into concrete, usually by tensioned high-strength tendons, to counteract tensile stresses from loads. It permits longer spans and controls cracking by keeping the section largely in compression.
- Post-Tensioning
- Related: Prestressing, Creep
A prestressing method in which tendons are stressed after the concrete has hardened, then anchored against the member ends and the ducts grouted. It allows curved tendon profiles and site assembly of long spans.
- Creep
- Related: Prestressing, Shrinkage
Time-dependent increase in strain of concrete under sustained stress, caused by gradual movement of water within the cement paste. It increases long-term deflection and relieves some prestress force over the life of a member.
- Shrinkage
- Related: Creep, Curing
Volume reduction of concrete as it dries and as cement hydrates, occurring without applied load. Restrained shrinkage generates tensile stress and is a common cause of cracking in slabs and long walls.
- Ductility
- Related: Under-Reinforced Section, Response Reduction Factor
The capacity of a member or material to undergo large inelastic deformation before failure while still resisting load. In seismic design, ductility allows energy dissipation and prevents sudden brittle collapse.
- Shear Wall
- Related: Base Shear, Storey Drift
A vertical reinforced concrete wall designed to resist lateral forces from wind or earthquakes. Its high in-plane stiffness limits storey drift and attracts a large share of the base shear in tall buildings.
- Base Shear
- Related: Shear Wall, Response Reduction Factor
The total design lateral force at the building base produced by an equivalent static or dynamic seismic analysis. It is distributed over the height of the structure to obtain design storey forces.
- Response Reduction Factor
- Related: Ductility, Base Shear
A code factor that divides the elastic seismic demand to account for the structure's ability to dissipate energy through controlled inelastic behaviour. Higher values apply to detailed ductile framing systems.
- Storey Drift
- Related: Shear Wall, Natural Period
The relative lateral displacement between two consecutive floors, often expressed as a ratio of the storey height. Excessive drift damages non-structural elements and indicates loss of stiffness.
- Natural Period
- Related: Base Shear, Storey Drift
The time a structure takes to complete one free oscillation in a given mode. It governs where the building sits on the response spectrum and therefore how much seismic force it attracts.
- Degree of Static Indeterminacy
- Related: Influence Line, Moment Distribution Method
The number of redundant reactions or internal forces exceeding those needed for equilibrium. It equals the number of extra compatibility conditions required to solve the structure.
- Influence Line
- Related: Degree of Static Indeterminacy, Moment Distribution Method
A diagram showing how a particular response, such as a reaction, shear or moment, varies as a unit load moves across the structure. It is used to place moving loads at the position giving the worst effect.
- Moment Distribution Method
- Related: Degree of Static Indeterminacy, Influence Line
A successive-approximation technique for analysing continuous frames. Fixed-end moments are released at joints and redistributed in proportion to member stiffness until unbalanced moments become negligible.
- Buckling
- Related: Effective Length, Plate Girder
Sudden lateral deflection of a slender member under compressive load when it reaches a critical value. The Euler load depends on effective length, flexural rigidity and end restraint, not on material strength alone.
- Effective Length
- Related: Buckling, Plate Girder
The equivalent pin-ended length of a compression member that gives the same buckling load as the actual member with its real end conditions. It is the actual length multiplied by a factor depending on restraint.
- Plate Girder
- Related: Buckling, Effective Length
A built-up steel beam formed from a deep web plate with flange plates welded or bolted to its edges. It is used for spans and loads beyond the range of rolled sections and requires web stiffeners against shear buckling.
- Bearing Capacity
- Related: Standard Penetration Test, Liquefaction
The maximum pressure the soil beneath a foundation can sustain without shear failure or excessive settlement. It is computed from shear strength parameters, footing geometry and depth using a recognised theory.
- Standard Penetration Test
- Related: Bearing Capacity, Liquefaction
An in-situ test in which a split sampler is driven into the ground by a standard drop hammer, and the blow count for the final 300 mm is recorded. The N value is used to estimate soil density and strength.
- Liquefaction
- Related: Bearing Capacity, Standard Penetration Test
Loss of shear strength in saturated loose sand during earthquake shaking when pore water pressure rises until effective stress approaches zero. The ground then behaves like a fluid, causing settlement and foundation failure.
- Workability
- Related: Curing, Shrinkage
The ease with which freshly mixed concrete can be placed, compacted and finished without segregation. It is commonly assessed by the slump test, and the required value depends on member shape and placing method.
- Curing
- Related: Workability, Shrinkage
Maintaining adequate moisture and temperature in concrete after placing so that cement hydration can continue. Proper curing develops strength, reduces permeability and limits shrinkage cracking at early ages.
- Slump Test
- Related: Workability, Curing
A field test in which freshly mixed concrete is placed in a standard cone, the cone is lifted, and the vertical drop of the concrete is measured. It gives a simple indication of consistency and workability.
- Critical Path Method
- Related: Float, Earned Value Management
A scheduling technique that models activities and dependencies as a network, then identifies the longest path through it. Activities on that path have zero float and any delay there delays project completion.
- Float
- Related: Critical Path Method, Earned Value Management
The amount of time an activity can be delayed without affecting the project completion date or a successor activity. Total float is measured along the network, while free float relates only to immediate successors.
- Earned Value Management
- Related: Critical Path Method, Float
A project control method comparing planned value, earned value and actual cost to measure schedule and cost performance. Cost and schedule performance indices below one indicate overrun or delay.
- Rate Analysis
- Related: Bill of Quantities, Contingency
The process of building up a unit rate for a construction item from material quantities, labour, plant, overheads and contractor profit. It produces the rate used to price measured work in a bill of quantities.
- Bill of Quantities
- Related: Rate Analysis, Contingency
A tender document listing measured quantities of work items against descriptions, against which bidders insert rates and amounts. It provides a common basis for comparing tenders and for interim payment valuation.
- Contingency
- Related: Bill of Quantities, Rate Analysis
A sum reserved in an estimate or project budget for unforeseen work, price variation or risk events. It is not allocated to specific items and is released only with proper authorisation.
- Levelling
- Related: Bench Mark, Contour
The surveying operation of determining the elevation of points relative to a datum using a level instrument and staff. Height differences are found from backsight and foresight readings and reduced to levels.
- Bench Mark
- Related: Levelling, Contour
A permanently fixed point of known reduced level, used as the reference for levelling and setting out. Temporary bench marks are established on site for convenience during construction.
- Contour
- Related: Levelling, Bench Mark
A line on a map joining points of equal elevation. Contour spacing indicates ground steepness and is used for site selection, drainage planning and earthwork estimation.
- Building Information Modelling
- Related: Bill of Quantities, Rate Analysis
A digital, object-based representation of a building in which geometry, materials and properties are linked. It supports clash detection, quantity extraction and coordinated drawing production across disciplines.
- Bar Bending Schedule
- Related: Bill of Quantities, Building Information Modelling
A tabulated statement giving the mark, size, shape, cutting length and number of each reinforcing bar in a member. It is used to order steel and to compute reinforcement quantities for payment.
- Professional Liability
- Related: Tender, Rate Analysis
The legal exposure of an engineer for loss caused by negligent design, advice or certification within the scope of professional duty. It is commonly managed through insurance and clear terms of engagement.
- Tender
- Related: Bill of Quantities, Professional Liability
A formal offer submitted by a contractor to execute specified work at stated rates within a stated period. Tenders are invited against drawings, specifications and a bill of quantities and evaluated before award.