MN General Contractor flashcards
MN General Contractor · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Gross profit
- Revenue minus direct job costs such as labor, materials, subcontracts, and equipment; it excludes general overhead and taxes.
- Gross margin percentage
- Gross profit divided by revenue, expressed as a percentage; it measures how much of each revenue dollar remains after direct job costs.
- Markup
- Gross profit divided by direct job cost, expressed as a percentage; markup is always higher than gross margin for the same job.
- Working capital
- Current assets minus current liabilities; positive working capital indicates ability to fund near-term operating costs and job expenses.
- Current ratio
- Current assets divided by current liabilities; a ratio below 1.0 means current liabilities exceed current assets available to pay them.
- Break-even revenue
- Fixed overhead divided by gross margin percentage; it is the sales volume at which gross profit exactly covers fixed overhead.
- Retainage
- Portion of progress payment withheld by the owner until contract conditions are met; it reduces contractor cash flow and must be tracked separately.
- Minnesota materials sales tax
- Minnesota generally treats contractors as consumers of materials they install, so contractors pay sales tax on those materials rather than charging tax on construction labor.
- Minnesota Residential Code
- Adopted state code for one- and two-family dwellings and townhouses; it is based on the IRC with Minnesota amendments and governs permits and inspections.
- Frost depth footing
- Footings must extend below the local frost line so soil freezing does not lift the foundation; required depth varies by Minnesota location.
- Emergency escape opening
- Basement and sleeping-room window required for rescue; minimum 5.7 square feet clear, 24 inches high, 20 inches wide, sill no more than 44 inches high.
- Stair riser and tread
- Maximum riser height is 7.75 inches and minimum tread depth is 10 inches for conventional residential stairs under the adopted code.
- Guard height
- Required guard at open sides and decks is at least 36 inches high in residential construction, with openings that reject a 4-inch sphere.
- Smoke alarm locations
- Smoke alarms are required in each sleeping room, outside sleeping areas, and on each story; interconnection and power source rules depend on code edition.
- Building permit inspection sequence
- Typical inspections occur at foundation, framing, rough-in, and final; concealed work must be approved before it is covered.
- Wall bracing
- Structural method using sheathing and framing to resist lateral loads; it must follow approved plans and code-prescribed bracing amounts.
- Contract consideration
- Something of value exchanged by each party, such as payment for construction services; without consideration, a contract may not be enforceable.
- Statute of Frauds
- Minnesota rule requiring certain agreements, including land sales and contracts not performable within one year, to be in writing and signed.
- Pre-lien notice
- Written notice that may be required from certain contractors and suppliers to preserve mechanic’s lien rights; timing and content are set by statute.
- Mechanic’s lien statement
- Document recorded against property to claim unpaid construction work; Minnesota generally requires recording within 120 days after last furnishing.
- Lien foreclosure deadline
- A mechanic’s lien generally must be foreclosed by lawsuit within one year after the lien statement is recorded; missing it can void the lien.
- Conditional lien waiver
- Waiver that becomes effective only when the stated payment is received; it protects the claimant if the check does not clear.
- Substantial completion
- Stage when work is sufficiently complete for intended use, triggering the punch list, warranty start, and often retainage release.
- Request for information
- Formal project document asking the designer to clarify plans or specifications; responses must be logged and distributed to affected parties.
- Fall protection trigger
- OSHA requires fall protection in construction at 6 feet or more above a lower level, using guardrails, nets, or personal fall arrest.
- Ladder setup rule
- Portable ladder should be set at a 4:1 angle and extend at least 3 feet above the landing, with top and bottom secured.
- Excavation protective system
- Trenches 5 feet or deeper require a protective system such as sloping, shoring, or shielding unless made in stable rock.
- Spoil pile setback
- Excavated soil and equipment must be kept at least 2 feet from the trench edge to reduce collapse risk.
- Scaffold fall protection
- Scaffold work at 10 feet or more requires guardrails or personal fall arrest; top rails are typically 38 to 45 inches high.
- Hazard Communication Standard
- OSHA rule requiring chemical labels, safety data sheets, and employee training so workers understand hazards of materials on site.
- Stormwater construction permit
- NPDES permit required when construction disturbs one acre or more; it requires a SWPPP with erosion and sediment controls.
- Minnesota workers compensation
- Minnesota employers must carry workers’ compensation insurance for employees; misclassifying employees as independent contractors can create liability.