MS Asbestos Abatement flashcards
MS Asbestos Abatement · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- AHERA accreditation disciplines
- The five accredited disciplines are inspector, management planner, project designer, contractor/supervisor, and worker. Each requires a specific initial training course, passing exam, and periodic refresher to remain valid.
- Worker initial training length
- The AHERA worker initial course is 4 days. It covers asbestos hazards, abatement methods, personal protection, and regulations, and ends with a required written examination.
- Contractor/supervisor training length
- The contractor/supervisor initial course runs 5 days and includes supervision of abatement projects, worker protection, and hands-on training. A passing exam is required for accreditation.
- Inspector training prerequisite
- The inspector initial course is 3 days. An inspector accreditation is a prerequisite for the management planner course, so the inspector credential must be earned first.
- Annual refresher requirement
- Accredited individuals must complete an annual refresher course before their accreditation expires. Refresher length is half the initial course and includes an exam where required.
- Respirator program under OSHA
- OSHA 29 CFR 1910.134 requires a written respirator program, medical evaluation, fit testing, and training. These obligations are separate from AHERA accreditation and apply during abatement work.
- Accreditation is state-specific
- Accreditation is issued by the state or EPA-approved program where the work is performed. A certificate from one state does not automatically authorize work in another jurisdiction.
- Ten working day notification
- Many federal and state rules require notification to the regulatory agency at least 10 working days before certain abatement, renovation, or demolition projects begin.
- Portal renewal submission
- The certification portal is used to submit refresher certificates, renewal applications, and fees. Submitting before the expiration date prevents a lapse that may require retaking the initial course.
- Required portal documents
- Most portals require the training provider's course completion certificate, proof of prior accreditation, and payment. Applications are not reviewed until all required documents are uploaded.
- Accreditation number use
- Each accredited individual receives an accreditation number recorded in the portal. Employers and regulators use this number to verify current status and discipline.
- Lapse and reinstatement
- If accreditation lapses, the program may require retaking the full initial course rather than only a refresher. Rules vary by state, so the portal guidance governs reinstatement.
- Portal data corrections
- Name changes, added disciplines, and duplicate records are corrected through the portal's amendment or support process. Supporting documentation is usually required for each correction.
- Keep submission confirmations
- Portal confirmation numbers and uploaded documents serve as evidence of timely renewal. Inspectors may request them to verify that accreditation was maintained during a project.
- Verifying an accreditation
- The portal's public lookup or verification feature confirms an individual's discipline, status, and expiration date. Employers should verify before assigning regulated asbestos work.
- Training provider identification
- The portal application typically requires the training provider's name and course date. Providers must be accredited to deliver AHERA courses, and certificates show this information.
- LEA inspection duty
- AHERA requires each local education agency to inspect its school buildings for asbestos-containing building materials and to develop a written management plan based on the findings.
- Management plan availability
- The management plan must be kept at each school and at the LEA office. It must be available for inspection by parents, teachers, and regulators during normal hours.
- Annual notification to parents
- The LEA must annually notify parents, teachers, and employee organizations that the management plan is available and where it can be reviewed.
- Designated person role
- The LEA appoints a designated person responsible for implementing and updating the management plan, ensuring inspections and surveillance occur, and coordinating response actions.
- Three-year reinspection
- All asbestos-containing building materials must be reinspected every 3 years by an accredited inspector. Findings are used to update the management plan and response actions.
- Six-month surveillance
- Periodic surveillance of known asbestos-containing building materials must occur every 6 months. It checks for damage or deterioration and is documented in the management plan.
- Response action types
- AHERA response actions include repair, encapsulation, enclosure, removal, and operations and maintenance. Selection depends on material condition, accessibility, and disturbance potential.
- Short-term worker awareness
- Custodial and maintenance staff who may disturb asbestos-containing materials must receive awareness training at least every 12 months. Training covers recognition and avoidance of disturbance.
- NESHAP applicability
- 40 CFR Part 61 Subpart M regulates asbestos during demolition and renovation of institutional, commercial, and industrial buildings. It sets inspection, notification, and work practice requirements.
- Pre-demolition inspection
- A thorough asbestos inspection must be completed before demolition or renovation. The owner or operator must retain the inspection report and make it available to regulators.
- RACM definition
- Regulated asbestos-containing material includes friable asbestos material and nonfriable material that will be crumbled, pulverized, or reduced to powder during the project.
- Wet removal requirement
- Regulated asbestos-containing material must be kept adequately wet during removal and until it is collected and contained for disposal, reducing fiber release.
- Waste labeling and disposal
- Asbestos waste must be placed in leak-tight containers labeled as asbestos waste and disposed of at a site permitted to accept it. Shipping records are retained.
- Emergency renovation notice
- An emergency renovation may allow reduced notification time, but the operator must notify as soon as possible and document the emergency circumstances in project records.
- HEPA filtration control
- Local exhaust ventilation with HEPA filtration and negative pressure containment are standard controls used during abatement to prevent fiber migration outside the work area.
- Demolition notification timing
- Notification is required at least 10 working days before demolition begins. For renovation, notification is required before disturbing threshold amounts of regulated asbestos-containing material.