MS General Contractor study materials
MS General Contractor study resources

MS General Contractor: Estimating, Bidding, Plans, and Specifications

MS General Contractor · Work through your exam, one topic at a time.

All guide sections

Estimating, Bidding, Plans, and Specifications

Estimating, Bidding, Plans, and Specifications

This domain tests quantity takeoff, pricing, bid assembly, and plan and specification reading. Expect markup, contingency, bond, addendum, and specification-interpretation questions.

Estimating and bidding

  • A takeoff measures quantities from drawings and specs; pricing adds labor, material, equipment, subcontractors, overhead, profit, and contingency.
  • Bonds and insurance are real bid costs; a bid bond is usually a percentage of bid and performance and payment bonds protect the owner.
  • Addenda modify the bid documents; acknowledge them and incorporate their cost before bid opening.
  • Alternates and unit prices must be priced as the specifications require; unbalanced bids can be rejected.

Plans and specifications

  • Read the title block, scale, plan views, sections, details, schedules, and general notes together.
  • Specifications are commonly organized by MasterFormat divisions; drawings and specs are complementary.
  • When a dimension conflicts with a note, follow the contract's precedence clause and issue an RFI rather than guessing.

Worked example. Direct cost is $500,000. Overhead 10%, profit 8%, contingency 3%, all applied to direct cost. Bid = $500,000 x (1 + 0.10 + 0.08 + 0.03) = $605,000. Reasoning: each percentage is a separate markup on the same base; if profit were applied to cost plus overhead, the base would change and the result would differ.

Traps. Omitting bond premiums or contingency; ignoring an addendum; scaling dimensions from a reduced drawing; assuming one specification division covers all trades.