- Monument controls distance
- In deed interpretation, a call for a natural or artificial monument generally prevails over courses and distances, and area is the least reliable call.
- Adverse possession elements
- Actual, open and notorious, exclusive, continuous, and hostile possession under claim of right for the statutory period can ripen into title.
- Avulsion vs accretion
- Accretion is gradual and imperceptible deposit that moves a water boundary; avulsion is a sudden change that leaves the original boundary unchanged.
- Boundary by acquiescence
- When adjoining owners treat an uncertain line as the boundary for a long period, courts may fix that line even if it differs from the deed.
- Easement by prescription
- Open, notorious, adverse, and continuous use of another person's land for the statutory period can create a prescriptive easement.
- Race-notice recording
- A later purchaser for value prevails only if without notice of the prior conveyance and records first; Mississippi uses this recording rule.
- Meander line not boundary
- A meander line is only a reference for computing area; the water boundary is the ordinary high-water mark or thread of the stream as law provides.
- Latitude and departure
- Latitude equals distance times cosine of the bearing angle from north; departure equals distance times sine of the bearing angle.
- Traverse linear misclosure
- Linear misclosure is the square root of the sum of squared latitude and departure errors; relative precision is misclosure divided by total traverse length.
- Area by coordinates
- Twice the area equals the absolute sum of cross products X_i Y_{i+1} minus X_{i+1} Y_i around the closed traverse.
- Arc definition degree curve
- Radius equals 5729.57795 divided by degree of curve when the degree is defined by a 100-foot arc.
- Curve tangent distance
- Tangent distance equals radius times tangent of half the central angle; curve length equals radius times central angle in radians.
- GNSS orthometric height
- Orthometric height equals ellipsoid height minus geoid undulation, giving elevation above the geoid datum.
- EDM prism constant
- An incorrect prism constant shifts every measured distance by a fixed amount and is a systematic error, not random noise.
- Township and section
- A PLSS township is about 6 miles square and contains 36 sections; a regular section is 1 mile square and contains 640 acres.
- Section numbering pattern
- Sections number from 1 at the township's northeast corner westward, then serpentine east and west to section 36 at the southeast corner.
- Mississippi principal meridians
- Mississippi's PLSS includes the Washington, St. Stephens, Choctaw, and Chickasaw principal meridians, each with its own baseline.
- Chancery Clerk land records
- Mississippi county deeds, plats, and most land records are recorded in the office of the Chancery Clerk.
- Chain of title
- A chain of title traces successive conveyances from a common grantor to the present owner, checking each deed's grantor-grantee link.
- Tax records not title
- Assessor and tax records support taxation and mapping but do not by themselves establish legal title or boundary location.
- Plat certification
- A recorded plat typically shows bearings, distances, monuments, curve data, dedication, scale, north arrow, and the surveyor's signed certification.
- Map scale ratio
- A scale of 1:24,000 means one map unit represents 24,000 of the same units on the ground.
- Contour interval
- The contour interval is the constant vertical distance between adjacent contour lines on a topographic map.
- State Plane zones
- Mississippi State Plane coordinates use East and West Lambert Conformal Conic zones referenced to NAD83.
- Witness corner
- A witness corner is a monument placed at a safe offset from the true corner and referenced to it by bearing and distance.
- Horizontal control datum
- NAD83 is a horizontal geodetic datum; NAVD88 is a vertical datum used for orthometric elevations in the United States.
- Responsible charge
- Responsible charge means a licensee personally directs and reviews the surveying work and can seal only work under that control.
- Mississippi licensing board
- The Mississippi Board of Licensure for Professional Engineers and Land Surveyors regulates land surveyor licensure and practice in the state.
- Contingent fee ethics
- A surveyor should not accept compensation contingent on a boundary opinion, because it creates a conflict with objective professional judgment.
- Unlicensed practice
- Performing land surveying for the public without a license, or allowing unlicensed persons to practice, violates Mississippi licensing law.
- Seal and signature
- A licensee's seal and signature certify that the survey work was performed by or under the responsible charge of that licensee.
- State plane not boundary
- State plane coordinates provide a common reference but do not legally establish or replace boundary monuments or recorded deed lines.