MT Asbestos Abatement study materials
MT Asbestos Abatement study resources

MT Asbestos Abatement flashcards

MT Asbestos Abatement · Build recall with a focused review session.

31 cards. Read the term and the definition here. The deck at the top of this page is optional.

ACM weight threshold
Any material containing more than 1% asbestos by weight is classified as asbestos-containing material and is subject to the full asbestos control program requirements.
Presumed ACM rule
Friable material installed before the facility's asbestos cutoff date with no valid bulk sample analysis is presumed ACM until proven otherwise by laboratory testing.
Abatement notification timing
Written notification to the regulatory authority is required at least 10 working days before abatement begins for projects exceeding the square-foot or linear-foot threshold.
Emergency abatement reporting
Emergency abatement must be reported to the regulatory authority within 24 hours, followed by written documentation of the circumstances and scope.
Project manager duties
The certified project manager maintains the site-specific work plan, verifies worker certification, approves monitoring results, and signs off on final clearance.
Record retention period
Bulk sample results, air monitoring data, worker certification records, waste manifests, and clearance documentation must be retained at least 3 years after project completion.
Residential exemption limits
Owner-occupied single-family residences are exempt from the program, but common areas of multi-unit buildings and work performed for compensation are covered.
Personal exposure monitoring
Personal air monitoring is required whenever workers may be exposed above the permissible exposure limit or short-term exposure limit during asbestos work.
Area monitoring purpose
Area monitoring verifies that fiber concentrations outside the regulated area remain below clearance thresholds and that containment is functioning properly.
Regulated area demarcation
The regulated area must have critical barriers, warning signs at every entrance, and negative-pressure containment limiting entry to certified workers in required PPE.
Negative pressure target
Containment must maintain a pressure differential of at least -0.02 inches of water column relative to adjacent spaces, verified with a manometer at least twice per shift.
Decontamination sequence
Workers exit through a clean room, then a shower, then an equipment room; PPE is removed on the dirty side and bagged before showering.
Wet removal requirement
ACM must be wetted with amended water before and during disturbance to suppress fiber release; dry removal is prohibited unless wetting creates a safety hazard.
HEPA equipment rule
All vacuums, negative air machines, and respirator cartridges used in the regulated area must be HEPA-filtered; non-HEPA equipment is prohibited.
Clearance threshold
Clearance requires visual inspection showing no visible debris followed by air samples below the clearance threshold, commonly 0.01 fibers per cubic centimeter by PCM.
Visual inspection first
Clearance air sampling cannot begin until a visual inspection confirms no visible dust, debris, or residue remains inside the containment.
Waste manifest retention
ACM waste must be bagged in leak-tight labeled containers and transported with a waste manifest; the generator retains a copy for at least 3 years.
Half-face respirator minimum
Half-face HEPA respirators are the minimum protection for Class II work; higher exposure levels require full-face PAPRs or supplied-air respirators.
Full-face PAPR trigger
A full-face powered air-purifying respirator or supplied-air respirator is required when exposure may exceed 10 times the permissible exposure limit.
Critical barrier purpose
Critical barriers seal openings, vents, and surfaces to prevent fiber migration from the regulated area into occupied or adjacent spaces.
Bulk sample analysis method
Polarized light microscopy with gravimetric analysis determines asbestos content by weight; results above 1% classify the material as ACM.
Friable material definition
Material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry; friable ACM poses the greatest fiber release risk.
Class II work definition
Work involving removal of non-friable ACM that may become friable through cutting, grinding, or sanding; requires containment and HEPA respirators.
Class I work definition
Work involving removal of friable ACM such as thermal system insulation, surfacing material, or sprayed-on coatings; highest hazard class requiring full containment.
Occupant protection plan
A written plan describing how building occupants will be protected during abatement, including access control, notification, and monitoring procedures.
Air sample calibration
Air sampling pumps must be calibrated before and after each sampling event; post-calibration results outside 10% of pre-calibration invalidate the sample.
Waste shipment labeling
Containers leaving the regulated area must display the asbestos warning label and be sealed leak-tight before transport to the disposal site.
Worker certification verification
The project manager must confirm each worker's certification is current and valid for the work class before allowing entry into the regulated area.
Site-specific work plan
A written plan prepared for each project describing scope, containment design, work practices, monitoring, and emergency procedures; required before work begins.
Clearance reoccupancy rule
Occupants may reoccupy the space only after clearance air results are below threshold and the project manager signs the final clearance document.
Emergency abatement definition
Abatement necessary to respond to a sudden, unexpected event such as a pipe break or fire that creates an immediate hazard; subject to expedited notification.