MTTC Earth/Space Science (020) study materials
MTTC Earth/Space Science (020) study resources

Turbidity Pulse in a Two-Branch Stream Study

MTTC Earth/Space Science (020) · Put your knowledge to work in context.

All case studies

Turbidity Pulse in a Two-Branch Stream Study

A student team monitored 12 stream sites monthly from September to May-six on North Fork and six on South Fork. North Fork's catchment includes an active construction site; South Fork is forested. At each visit they recorded turbidity with a single handheld probe, nitrate with test strips, discharge by wading cross-section, and water temperature. The October sampling occurred two days after 38 mm of rain. North Fork turbidity averaged 45 NTU versus 8 NTU on South Fork, while nitrate was similar at 2.1 and 1.9 mg/L. Discharge was 1.8 times higher on North Fork. The team concluded that construction runoff caused the turbidity difference and recommended an immediate stop-work order. Their probe was calibrated once in September and stored in tap water between trips; samples for nitrate were held 24 hours before reading.

1. Is the team's conclusion that construction runoff caused the turbidity difference supported by these data? Justify your answer with specific confounds and the type of evidence needed.

Read the worked answer

No. The comparison is a single post-rain snapshot with no pre-construction or before-rain baseline. North Fork also had 1.8 times the discharge, so higher turbidity could reflect greater shear stress and sediment supply from the larger flow rather than construction. The probe was calibrated once in September and stored in tap water, so drift or contamination could bias turbidity; nitrate strips and 24-hour holding add measurement error. The six sites per branch are pseudoreplicates within two streams, not independent branches, and one storm cannot separate event effects from land-use effects. To attribute causality, the team needs a before-after-control-impact design: paired upstream/downstream sites on both forks, sampling before and after rain and before and after construction, daily probe calibration with fresh standards, replicate readings, and discharge measurement at each site. A defensible claim is only that North Fork had higher turbidity and discharge during the October sampling, not that construction caused it.

2. What specific monitoring design would let the team test the construction-runoff hypothesis within one school year?

Read the worked answer

Use a before-after-control-impact (BACI) design. Identify three upstream reference reaches and three downstream construction reaches on North Fork, then add three paired sites on South Fork as a control. Sample at least weekly and during at least three storms, with daily probe calibration and duplicate turbidity readings. Measure discharge at every site so turbidity can be normalized to flow; plot turbidity against discharge to look for hysteresis. If construction has already started, use upstream/downstream contrasts and South Fork as a reference, but state that before-data are missing. Pre-register a threshold, such as a consistent downstream increase in turbidity at similar discharge, and analyze with site as a random effect so repeated visits are not treated as independent. This design separates season, flow, and construction effects better than a single October comparison.

3. The team wants to issue a press release saying the stream is 'unsafe because of construction.' What can they defensibly say, and what should they not say?

Read the worked answer

They can state that during one post-rain sampling, North Fork turbidity was 45 NTU versus 8 NTU on South Fork and discharge was 1.8 times higher. Those are observations, not proof of cause. They should not say construction caused the turbidity or that the stream is unsafe: no health-based standard was measured, turbidity is not a direct pathogen indicator, there are no before data, and probe calibration was not verified. They should report uncertainty and note that follow-up BACI monitoring is needed. If public health is a concern, the appropriate step is to ask the local health agency to test for fecal indicator bacteria and other contaminants, not to infer risk from turbidity alone. The press release should distinguish measured values, possible explanations, and management recommendations.