PQSC Quantity Surveyor Registration study materials
PQSC Quantity Surveyor Registration study resources

PQSC Quantity Surveyor Registration key terms

PQSC Quantity Surveyor Registration · Get comfortable with the vocabulary.

Building Information Modelling (BIM)

A digital process that creates and manages coordinated information about a built asset across its lifecycle. Quantity surveyors use models to extract quantities, detect clashes, and support cost planning.

Related: Take-off, Cost plan
Bill of Quantities (BQ)

A document listing measured work items with descriptions and quantities, prepared from drawings and specifications. It provides a common basis for tendering and for valuing variations during construction.

Related: Take-off, Measurement standard, Variation
Take-off

The process of extracting quantities of work from drawings, schedules, and models. Accurate take-off underpins estimating, bills of quantities, and interim valuations.

Related: Bill of Quantities (BQ), Measurement standard
Measurement standard

A published set of rules governing how work is described and quantified, such as a national method of measurement. It promotes consistency and comparability between bills and valuations.

Related: Bill of Quantities (BQ), Take-off
Preliminaries

Costs for site establishment, supervision, temporary works, insurance, and other general obligations that are not part of permanent work. They are typically priced separately from measured work items.

Related: Priced bill, Preliminaries
Cost plan

A structured estimate allocating budget to building elements or work packages at a defined design stage. It is progressively refined and used to control design against the client's affordability target.

Related: Elemental cost analysis, Contingency, Value engineering
Elemental cost analysis

The breakdown of a project's cost by functional building elements, such as substructure, frame, and services. It enables benchmarking and comparison of projects on a like-for-like basis.

Related: Cost plan, Benchmarking
Benchmarking

Comparing a project's cost, time, or performance metrics against reference data from comparable assets. Quantity surveyors use it to test the reasonableness of estimates and cost plans.

Related: Elemental cost analysis, Cost plan
Contingency

A sum reserved in an estimate or budget to cover identified risks and unknown items. It is released as risks pass or crystallise and is distinct from the contractor's own risk allowance.

Related: Risk allowance, Cost plan
Risk allowance

Money included in a tender or estimate to cover the priced party's exposure to identified risks. It differs from client contingency, which sits in the project budget.

Related: Contingency, Priced bill
Priced bill

A bill of quantities in which the tenderer has entered rates and amounts against each item. Once accepted, its rates usually form the basis for valuing changes.

Related: Bill of Quantities (BQ), Variation
Variation

A change to the scope, quantity, quality, or timing of work instructed under the contract. Quantity surveyors value variations using contractual rules and bill rates where applicable.

Related: Priced bill, Interim valuation
Interim valuation

A periodic assessment of the value of work executed and materials on site, used to certify progress payments. It reconciles measured work, variations, and adjustments such as retention.

Related: Retention, Variation
Retention

A percentage withheld from each progress payment as security for defects and non-completion. Part is typically released on practical completion and the balance after the defects period.

Related: Interim valuation, Defects liability period
Defects liability period

A defined period after completion during which the contractor must remedy notified defects at its own cost. Its length and procedures are set by the contract.

Related: Retention, Practical completion
Practical completion

The stage at which the works are complete enough for their intended use, subject to minor outstanding items. It usually triggers possession, retention release, and the defects period.

Related: Defects liability period, Retention
Liquidated damages

A pre-agreed sum payable by the contractor per period of delay beyond the contractual completion date. It must be a genuine estimate of the client's loss to be enforceable.

Related: Practical completion, Variation
Value engineering

A structured review that seeks to achieve required function at lower whole-life cost without reducing quality. It is most effective early in design when change is cheapest.

Related: Cost plan, Whole-life cost
Whole-life cost

The total cost of an asset over its life, including acquisition, operation, maintenance, and disposal. It supports decisions where capital cost and running cost trade off.

Related: Value engineering, Life-cycle costing
Life-cycle costing

The technique of discounting future operating, maintenance, and replacement costs to present value for comparison of options. It is a component of whole-life cost assessment.

Related: Whole-life cost, Discount rate
Discount rate

The rate used to convert future cash flows to present value in an appraisal. Its choice materially affects which option appears cheapest over the asset's life.

Related: Life-cycle costing
Cash flow forecast

A projection of money received and spent over time, often shown as an S-curve for construction projects. It informs funding needs and interim payment expectations.

Related: Interim valuation, Cost plan
Cost-value reconciliation

A monthly comparison of costs incurred against value certified on a project. It reveals margin erosion, unmeasured work, and errors in valuation or cost capture.

Related: Interim valuation, Cash flow forecast
Contract sum

The amount stated in the contract as payable for the works, subject to adjustment under the contract. It changes through variations, instructions, and other mechanisms.

Related: Variation, Priced bill
Fluctuations

Contract provisions adjusting prices for changes in costs such as labour, materials, or statutory charges. They transfer defined cost risk from contractor to client.

Related: Contract sum, Risk allowance
Prime cost sum

An allowance in a bill for work or materials to be supplied by a nominated party, later adjusted to actual cost. It is distinct from a provisional sum for undefined work.

Related: Provisional sum, Priced bill
Provisional sum

An allowance included for work that cannot be fully defined at tender stage. It may be spent in whole or part, and unused amounts are deducted from the contract sum.

Related: Prime cost sum, Contract sum
Conflict of interest

A situation where a surveyor's personal, financial, or other interest could improperly influence professional judgement. It must be disclosed promptly and managed, often by withdrawal from the matter.

Related: Independence, Confidentiality
Independence

The state of being free from pressures or relationships that compromise objective professional judgement. It underpins impartial advice, certification, and dispute work.

Related: Conflict of interest, Objectivity
Objectivity

Basing professional opinions and figures on evidence and sound method rather than preference or influence. It is tested when reporting costs or certifying sums that affect others' money.

Related: Independence, Professional scepticism
Confidentiality

The duty not to disclose client or project information obtained through professional work without authority or legal requirement. It survives the end of the engagement.

Related: Conflict of interest, Data protection
Data protection

Legal and ethical obligations governing the collection, storage, use, and sharing of personal data. Surveyors handle such data in contracts, payroll, and project records.

Related: Confidentiality
Professional scepticism

An alert, questioning attitude towards information and representations, especially where incentives to misstate exist. It guides verification of quantities, valuations, and claimed costs.

Related: Objectivity, Fraud risk
Fraud risk

The exposure to intentional misstatement or deception, such as inflated valuations or false invoices. Surveyors reduce it through verification, segregation of duties, and challenge.

Related: Professional scepticism, Cost-value reconciliation
Negligence

Failure to exercise the reasonable skill and care expected of a competent professional in the circumstances. It requires a duty, a breach, and resulting loss.

Related: Professional indemnity insurance, Duty of care
Duty of care

The legal and ethical obligation to act with reasonable skill and care towards those who may foreseeably rely on one's work. It can exist beyond the immediate client.

Related: Negligence, Professional indemnity insurance
Professional indemnity insurance

Insurance covering claims arising from alleged errors, omissions, or negligence in professional services. It protects both the practitioner and the client's ability to recover loss.

Related: Negligence, Duty of care
Continuing professional development

Structured learning and reflection maintained throughout a career to keep knowledge and skills current. Registration bodies commonly require recorded hours or points each period.

Related: Competence
Competence

Possessing the knowledge, skills, and experience needed to perform an assignment to the required standard. A surveyor should decline work outside their competence or obtain support.

Related: Continuing professional development
Whistleblowing

Raising a concern about wrongdoing, danger, or malpractice, internally or to a regulator. Professional codes protect those who report in good faith from retaliation.

Related: Public interest, Confidentiality
Public interest

The wider welfare of society that may override a client's private instructions. Professional standards require surveyors to refuse involvement in unlawful or harmful conduct.

Related: Whistleblowing, Objectivity
Bribery

Offering, giving, requesting, or accepting an advantage to induce improper action. Anti-bribery duties apply to public and private sectors and to intermediaries acting for a firm.

Related: Conflict of interest, Public interest
Money laundering

Concealing the origin of proceeds of crime so they appear legitimate. Construction and property transactions are high-risk, so firms must identify clients and report suspicions.

Related: Bribery, Due diligence
Due diligence

Reasonable investigation and verification before entering an engagement or transaction. It includes checking client identity, project facts, and contractual terms.

Related: Money laundering, Professional scepticism
Fee proposal

A written offer setting out the scope of services, basis of charging, exclusions, assumptions, and terms. Clear definition prevents disputes about what was included.

Related: Scope of services, Terms of engagement
Scope of services

The defined set of tasks and deliverables a surveyor will provide under an appointment. Ambiguity here is a common source of fee disputes and negligence claims.

Related: Fee proposal, Terms of engagement
Terms of engagement

The contractual conditions governing an appointment, including payment, liability, termination, and dispute resolution. They should be agreed in writing before work begins.

Related: Fee proposal, Scope of services