QETPP key terms
QETPP · Get comfortable with the vocabulary.
- Insulation resistance test
- Related: Polarization index, Dielectric withstand test
A DC voltage is applied between an insulated conductor and ground (or between windings) to measure resistance; low values suggest moisture, contamination, or degradation.
- Polarization index
- Related: Insulation resistance test, Step voltage test
Ratio of insulation resistance at 10 minutes to 1 minute; indicates insulation condition and moisture susceptibility; typically >2 acceptable for rotating machines, but limits vary by class.
- Dielectric withstand test
- Related: Insulation resistance test, Partial discharge test
Applies a specified AC or DC overvoltage for a set time to verify insulation can withstand transient or operating stress without breakdown; can be destructive if misapplied.
- Step voltage test
- Related: Insulation resistance test, Polarization index
Applies incremental DC test voltages in steps and records insulation resistance at each step; a downward trend can reveal insulation weakness that a single-voltage test misses.
- Contact resistance test
- Related: Circuit breaker timing test, Thermographic survey
Injects a high DC current through closed contacts and measures the micro-ohm voltage drop; compares results to manufacturer limits or previous baseline to detect pitting, contamination, or loose joints.
- Circuit breaker timing test
- Related: Contact resistance test, Protective relay
Records open/close times, simultaneity, bounce, and travel of breaker contacts using a timing analyzer; verifies mechanical and trip-coil performance against manufacturer specifications.
- Protective relay
- Related: Secondary injection test, Coordination study
A device that monitors current, voltage, frequency, or other quantities and initiates trip or alarm signals when settings are exceeded; coordination depends on correct settings and testing.
- Secondary injection test
- Related: Protective relay, Primary injection test
Applies simulated current and voltage signals to relay terminals to verify pickup, timing, and logic without energizing primary equipment; requires accurate source and lead connections.
- Primary injection test
- Related: Secondary injection test, Current transformer ratio and polarity test
Injects current through the primary conductor and current transformer to verify the entire protection chain, including CT ratio, wiring, relay response, and trip circuit.
- Current transformer ratio and polarity test
- Related: Primary injection test, Burden test
Verifies the turns ratio and relative polarity of a current transformer by injecting a known primary or secondary signal and measuring the output; errors affect metering and protection.
- Burden test
- Related: Current transformer ratio and polarity test, Secondary injection test
Measures the connected secondary load (VA and impedance) on a current transformer to ensure it does not exceed the CT's rated burden, which could cause saturation and protection misoperation.
- Coordination study
- Related: Protective relay, Short-circuit study
Analyzes protective device time-current characteristics to select settings that isolate faults with minimal outage while preserving upstream selectivity and limiting equipment damage.
- Short-circuit study
- Related: Coordination study, Arc flash study
Calculates available fault currents at each bus under defined system conditions; results set equipment ratings and protective device interrupting requirements.
- Arc flash study
- Related: Short-circuit study, Lockout/tagout
Estimates incident energy and arc flash boundary at working distances, enabling selection of PPE and labeling under standards such as NFPA 70E and IEEE 1584.
- Lockout/tagout
- Related: Arc flash study, Verification of de-energization
A documented procedure that isolates energy sources, applies locks and tags, and verifies de-energization before work; prevents unexpected energization or release of stored energy.
- Verification of de-energization
- Related: Lockout/tagout, Personal protective equipment
Confirms a circuit is at zero energy by testing with a known-good voltage detector, checking all conductors and phases, and re-testing the detector after use.
- Personal protective equipment
- Related: Arc flash study, Lockout/tagout
Clothing and equipment such as arc-rated garments, face shields, gloves, and hearing protection selected from an arc flash and shock risk assessment to reduce injury severity.
- Transformer turns ratio test
- Related: Sweep frequency response analysis, Insulation resistance test
Applies a known voltage to one winding and measures the induced voltage on another to verify turns ratio and polarity; deviations can indicate shorted turns or tap problems.
- Sweep frequency response analysis
- Related: Transformer turns ratio test, Dissolved gas analysis
Compares transformer winding impedance over a range of frequencies to a baseline; shifts in the signature can indicate winding deformation, core movement, or bushing issues.
- Dissolved gas analysis
- Related: Sweep frequency response analysis, Partial discharge test
Samples insulating oil and measures dissolved gases; gas concentrations and ratios help diagnose overheating, arcing, partial discharge, or paper degradation in oil-filled transformers.
- Partial discharge test
- Related: Dielectric withstand test, Dissolved gas analysis
Detects small electrical discharges within insulation by measuring high-frequency current pulses, acoustic signals, or electromagnetic emissions; PD can precede insulation failure.
- Power factor/tan delta test
- Related: Insulation resistance test, Partial discharge test
Measures dielectric losses in insulation as the ratio of resistive to capacitive current; increases can indicate moisture, contamination, or aging in bushings and windings.
- Thermographic survey
- Related: Contact resistance test, Power quality analysis
Uses an infrared camera to find abnormal temperature rises in energized equipment; hot connections, overloads, and phase imbalances appear as thermal anomalies compared with similar components.
- Power quality analysis
- Related: Thermographic survey, Harmonic distortion
Measures voltage sags, swells, harmonics, transients, and unbalance over time to diagnose equipment misoperation and verify compliance with standards such as IEEE 519.
- Harmonic distortion
- Related: Power quality analysis, Power factor/tan delta test
Deviation of a voltage or current waveform from a pure sine wave, quantified by total harmonic distortion (THD); high THD can overheat transformers, motors, and neutral conductors.
- Ground grid testing
- Related: Fall-of-potential test, Soil resistivity test
Measures resistance to remote earth of a grounding system, often by fall-of-potential or clamp-on methods; low resistance limits step and touch voltages during faults.
- Fall-of-potential test
- Related: Ground grid testing, Soil resistivity test
A three-point method that injects current into a ground electrode and measures voltage at varied probe spacings to determine earth resistance, avoiding the influence of nearby electrodes.
- Soil resistivity test
- Related: Ground grid testing, Fall-of-potential test
Uses the Wenner four-pin method or similar to measure earth resistivity at depth; results inform ground grid design and electrode spacing.
- Battery capacity test
- Related: Measurement uncertainty, Calibration
Discharges a stationary battery at a constant load to a defined end voltage and compares delivered capacity with rated ampere-hours; identifies aging cells and verifies backup time.
- Calibration
- Related: Measurement uncertainty, Traceability
Compares an instrument's indication with a reference standard of known uncertainty and documents the deviation; adjusts or assigns correction factors when required.
- Measurement uncertainty
- Related: Calibration, Traceability
A quantified range around a measured value that accounts for instrument accuracy, resolution, environmental effects, and procedure; it determines whether results meet tolerances.
- Traceability
- Related: Calibration, Measurement uncertainty
An unbroken chain of calibrations linking an instrument's measurements to national or international standards, each step documented with stated uncertainty.
- As-found/as-left data
- Related: Baseline, Acceptance test
Test results recorded before and after adjustment or repair; as-found shows equipment condition at arrival, as-left shows condition after work and supports acceptance decisions.
- Acceptance test
- Related: Commissioning, As-found/as-left data
A defined set of measurements and functional checks performed before energization or handover to confirm equipment meets specifications, standards, and contract requirements.
- Commissioning
- Related: Acceptance test, Functional test
The process of verifying and documenting that installed systems operate safely and meet design intent, including component tests, functional tests, and integrated system tests.
- Functional test
- Related: Commissioning, Protective relay
Operates equipment through its intended control sequences and interlocks to confirm correct response, often including trip circuits, alarms, and remote indications.
- Baseline
- Related: As-found/as-left data, Trend analysis
A reference set of measurements or performance data taken when equipment is known to be in good condition; later results are compared to it to detect trends.
- Trend analysis
- Related: Baseline, Dissolved gas analysis
Plots test results over time to distinguish normal aging from sudden deterioration; requires consistent test methods, conditions, and calibrated instruments.
- NETA ATS
- Related: Acceptance test, Calibration
The InterNational Electrical Testing Association's Acceptance Testing Specifications, which define recommended tests and tolerances for electrical power equipment and systems.