NIOSH SHO Hazard Control: Control Verification, Monitoring, and Program Evaluation

NIOSH SHO Hazard Control · Work through your exam, one topic at a time.

All guide sections

Control Verification, Monitoring, and Program Evaluation

Control Verification, Monitoring, and Program Evaluation

This domain tests whether controls actually work after installation and over time. Verification is not a one-time inspection; it includes exposure monitoring, ventilation checks, maintenance, recordkeeping, and program review.

Core rules

  • Verify controls before relying on them: visual inspection, smoke tubes, airflow measurement, and personal exposure sampling against OSHA PELs or NIOSH RELs.
  • Use representative sampling: the highest-exposure workers, tasks, and shifts. A single sample cannot prove a program works.
  • Calibrate sampling pumps and direct-reading instruments; document calibration, sampling time, and analytical method.
  • Monitor control performance: hood static pressure, filter changeout, fan belts, duct condition, and maintenance logs.
  • Evaluate the program with audits, incident and near-miss reviews, medical surveillance results, training records, and corrective actions. Keep records as required; 1910.1020 provides employee access to exposure and medical records.

Worked example

After installing LEV on a mixing tank, personal sampling shows 0.03 mg/m³ for a contaminant with a PEL of 0.05 mg/m³. That is below the PEL, but do not stop there. Verify hood capture with smoke, check duct transport velocity, confirm make-up air, and repeat sampling after process changes. If the margin is small, add periodic monitoring and maintenance triggers.

Traps

  • Treating one compliant sample as proof of control.
  • Measuring airflow once and never checking filters, belts, or dampers.
  • Ignoring changes in process, chemical, or production rate.
  • Failing to close corrective actions or track them to completion.