Mistake 1

Candidates list the design process steps in the wrong order or merge stages, for example jumping straight from 'identify the problem' to 'build the prototype' without a needs analysis, specification or idea-generation stage.

The steps are memorised as a loose list of keywords rather than as a sequence with inputs and outputs, so under exam pressure the order collapses and 'evaluate' gets placed before 'test'.

What to do instead

Draw the process as a flow chart with arrows and label each box with the document it produces (brief, spec, concept sketches, prototype, test report, final design). Practise reconstructing the chart from memory in under two minutes, then answer past-style questions by naming the stage before and after the one asked about.

Mistake 2

When asked to produce a project schedule, candidates write a single list of activities with no durations, no dependencies and no milestones, and do not convert it into a Gantt chart or critical-path statement.

Planning is treated as a writing task rather than a scheduling task, so the candidate never learned to attach time units and precedence to each activity.

What to do instead

For every planning question, force out a table with columns Activity, Duration (weeks), Predecessor, Start, Finish. Then mark the longest dependent chain as the critical path and state the total project duration in one sentence. Rehearse on a five-activity design project until the table format is automatic.

Mistake 3

Technical drawings are submitted without a title block, scale, unit, third-angle or first-angle projection symbol, or with hidden detail shown as solid lines and centre lines omitted.

Candidates focus entirely on getting the shape right and treat drawing conventions as decoration, often because they have only ever sketched freehand and never been marked against a standard.

What to do instead

Keep a one-page conventions checklist (outline, hidden, centre, dimension, projection symbol, title block, scale, units) and tick it before every drawing answer. Redraw three simple objects orthographically using the checklist, then self-mark against a model answer and note which convention you missed.

Mistake 4

Material selection answers name a material but give no property justification, or justify with a vague phrase such as 'because it is strong' without linking the property to the function of the part.

Candidates memorise material names and a single headline property each, so they cannot map a requirement such as 'must resist repeated bending and be electrically insulating' onto a specific material and property pair.

What to do instead

Build a property-matching table: Material, Density, Tensile strength, Hardness, Electrical conductivity, Thermal conductivity, Cost, Typical use. Practise answering in the form 'Chosen X because property Y is needed for function Z, whereas alternative W would fail because...'.

Mistake 5

Manufacturing process answers confuse one-off, batch and mass-production methods, for example recommending injection moulding for a single bespoke prototype or hand lay-up for 50,000 identical parts.

The processes are learned as descriptions in isolation, without the cost-per-unit versus tooling-cost trade-off that actually drives the choice.

What to do instead

For each process write tooling cost, cycle time, suitable quantity range and typical material. Then practise a three-line calculation comparing unit cost at 1, 100 and 10,000 units to see where the crossover occurs, and quote that reasoning in the answer.

Mistake 6

Candidates name a tool or machine for a task but cannot state its safety precaution, the correct workpiece holding method, or the cutting speed and feed direction, and mix up which machine performs which operation.

Workshop knowledge is absorbed by watching rather than by structured revision, so the link between operation, machine and guard or PPE is weak.

What to do instead

Create a machine card for each item (drill press, lathe, milling machine, band saw, sander) listing operation, holding device, guard or PPE, and one common accident. Test yourself by covering the operation column and recalling it from the machine name.

Mistake 7

In electrical and electronic questions, candidates draw a circuit with no switch, no fuse or no return path, connect an LED without a series resistor, or cannot distinguish a parallel circuit's behaviour from a series one.

Circuit diagrams are copied as pictures rather than read as continuous loops, and the protective components are treated as optional extras.

What to do instead

Redraw every circuit as a single closed loop starting and finishing at the supply, adding switch, fuse and load in sequence. For LEDs, calculate the series resistor from supply voltage, LED forward voltage and current. Compare brightness and failure behaviour of two lamps in series versus parallel in a short written table.

Mistake 8

CAD answers describe software as a magic step ('draw it in CAD and print it') without naming the modelling operation, file format, layer discipline or the link from 3D model to 2D drawing and to the 3D printer's slicing step.

Candidates use CAD only as a drawing tool at school and have never had to explain the workflow or the data that passes between stages.

What to do instead

Write the pipeline explicitly: sketch, constrain, extrude or revolve, assemble, export as STL or DXF, slice, print. Learn what each file format carries and why layers and dimensions matter. Practise describing one familiar object's CAD history in five numbered steps.

Mistake 9

Safety, health and environment answers stop at 'wear goggles and gloves' and omit risk assessment structure, waste segregation, material recycling, energy use or the legal duty to report an accident.

Hazard control is reduced to a PPE list, so the hierarchy of control and environmental impact are never applied to a real workshop scenario.

What to do instead

Answer using the hierarchy: eliminate, substitute, engineer control, administrate, then PPE, and give one example of each for a named workshop hazard. Add a short waste map for the chosen material covering offcuts, swarf, solvents and packaging, with the disposal route for each.

Mistake 10

Costing and marketing answers quote a selling price with no breakdown, forget to include labour, overhead, tooling, packaging and wastage, or calculate markup and margin interchangeably and get the wrong figure.

Candidates treat cost as a single guessed number and have not practised the arithmetic distinction between cost price, markup on cost and margin on selling price.

What to do instead

Always build a cost card: material, labour hours times rate, overhead, packaging, wastage allowance, total unit cost. Then apply markup as a percentage of cost and margin as a percentage of price, and check both directions with a worked example until the two formulas are never confused.