NATE Heat Pump Install study materials
NATE Heat Pump Install study resources

NATE Heat Pump Install study plan

NATE Heat Pump Install · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Heat Pump Fundamentals, Refrigerant Cycle, and System Components & Refrigerant Piping, Brazing, Evacuation, and Charging

  • Trace the vapor-compression cycle on a hand-drawn pressure-enthalpy diagram, labeling subcooling, superheat, and compression ratio for a heating-mode heat pump.

  • Identify the function and failure signature of each major component: compressor, reversing valve, expansion device, accumulator, suction line accumulator, and defrost control board.

  • Explain how a reversing valve swaps the evaporator and condenser roles between heating and cooling, including which line becomes the hot-gas discharge in defrost.

  • Describe the four charging methods (weigh-in, subcooling, superheat, approach) and state which applies to a TXV system versus a fixed-orifice system in heating and cooling.

  • List the nitrogen-flow brazing steps and the purpose of a flowing purge during joint assembly.

Your checkpoint

One-page P-h diagram with both heating and cooling cycle overlays plus a component/failure-signature table covering at least 10 components.

Week 2

Refrigerant Piping, Brazing, Evacuation, and Charging & Heat Pump Fundamentals, Refrigerant Cycle, and System Components

  • Perform a full evacuation on a training or shop system and record micron decay over a 10-minute standing vacuum test.

  • Calculate required additional charge from line-set length, liquid-line diameter, and manufacturer charge tables for two different brands.

  • Demonstrate a triple-evacuation or core-removal procedure and explain when each is appropriate.

  • Diagnose a simulated restricted metering device using superheat, subcooling, and pressure-drop readings.

Your checkpoint

Evacuation log showing vacuum level, decay test results, and a written pass/fail judgment with justification.

Week 3

Airflow, Duct Design, and Indoor Unit Installation & Refrigerant Piping, Brazing, Evacuation, and Charging

  • Measure external static pressure across a coil and air handler with a manometer and convert readings to fan-curve airflow using the manufacturer table.

  • Calculate required airflow from nominal capacity using 400 CFM per ton and compare it to the measured value.

  • Lay out a duct system that meets manual D sizing, including return sizing and static budget, for a 3-ton system.

  • Explain how improper airflow distorts superheat and subcooling readings and can mimic a refrigerant charge fault.

Your checkpoint

Airflow verification worksheet for one system: static pressure readings, fan-curve lookup, calculated CFM, and a correction recommendation.

Week 4

Electrical Power, Controls, and Low-Voltage Wiring & Safety, Codes, and Environmental Regulations

  • Read a heat pump wiring diagram and identify line voltage, control voltage, defrost board, and auxiliary heat circuits.

  • Size conductors, overcurrent protection, and disconnect for a given nameplate MCA and MOP.

  • Wire a low-voltage thermostat with emergency heat and identify the function of R, C, O/B, W, Y, and G terminals.

  • State the lockout/tagout, PPE, and refrigerant handling requirements that apply to a residential heat pump service call.

Your checkpoint

Completed low-voltage wiring schematic plus a conductor and breaker sizing calculation showing MCA/MOP compliance.

Week 5

Outdoor Unit Placement, Mounting, and Defrost/Drainage & Airflow, Duct Design, and Indoor Unit Installation

  • Evaluate three outdoor unit locations against clearance, snow, wind, and recirculation criteria and score them.

  • Design a condensate and defrost drainage path that prevents ice buildup and water intrusion into the structure.

  • Specify mounting method (pad, wall bracket, roof curb) and vibration isolation for each of three installation scenarios.

  • Explain how snow-cover kits and risers affect defrost performance and airflow.

Your checkpoint

Site placement scorecard comparing three candidate locations with a justified final recommendation and drainage sketch.

Week 6

Site Survey, Load Calculation, and Equipment Selection & Start-Up, Commissioning, and Performance Verification

  • Perform a room-by-room load estimate using a manual J method for a sample house and document assumptions.

  • Select an indoor and outdoor match that meets the load and verify the AHRI match and rated capacity at design temperature.

  • Build a commissioning checklist covering charge verification, airflow, temperature split, and defrost initiation test.

  • Calculate heating capacity balance point and explain how auxiliary heat staging covers the deficit.

Your checkpoint

Load calculation summary and equipment selection sheet with the AHRI match number and design-condition capacity.

Week 7

Start-Up, Commissioning, and Performance Verification & Troubleshooting, Service, and Maintenance

  • Run a full start-up on a shop system and record superheat, subcooling, delta-T, static pressure, and amp draw against manufacturer targets.

  • Force a defrost cycle and verify termination, then document the defrost time/temperature settings.

  • Diagnose three injected faults (low charge, restricted filter drier, failed reversing valve) using a structured symptom-to-cause method.

  • Write a preventive maintenance task list with intervals for coils, drains, electrical connections, and refrigerant charge checks.

Your checkpoint

Completed commissioning report for one system including all measured values, pass/fail against targets, and corrective actions.

Week 8

Troubleshooting, Service, and Maintenance & Safety, Codes, and Environmental Regulations & Site Survey, Load Calculation, and Equipment Selection

  • Complete a 60-question timed practice exam across all nine domains and score each domain separately.

  • Review every missed item and write a corrected explanation for each, citing the governing principle.

  • Re-drill the two lowest-scoring domains with targeted calculations and procedure walkthroughs.

  • Assemble a one-page reference card of formulas, key setpoints, and safety limits for final review.

Your checkpoint

Practice exam score report by domain with a written remediation log for every incorrect answer.

Milestones

Week 2: Can complete an evacuation and standing vacuum test unaided and calculate additional charge for a line-set length change without reference notes.

Week 4: Scores 80% or higher on a self-made 25-question quiz covering refrigerant cycle, piping/evacuation, airflow, and electrical fundamentals.

Week 6: Produces a defensible load calculation and equipment selection with a verified AHRI match in under 90 minutes.

Week 8: Scores 75% or higher overall on the timed 60-question practice exam with no domain below 65%.