NATE LC Refrigeration study materials
NATE LC Refrigeration study resources

NATE LC Refrigeration study plan

NATE LC Refrigeration · Give each week a clear focus.

8 weeks · About 8 hours per week

Week 1

Refrigeration Fundamentals and System Components

  • Explain the vapor-compression cycle stage by stage, stating pressure and temperature relationships for each of the four components

  • Label a hand-drawn system diagram with compressor, condenser, metering device, evaporator, and accessory components and describe the function of each

  • Define superheat, subcooling, saturation, and glide, and calculate each from given pressure and temperature readings

  • Identify the four common refrigerant classifications and match common refrigerants to their oil type and application range

Your checkpoint

A one-page annotated system diagram plus a worked problem set of 10 superheat and subcooling calculations scoring at least 80 percent

Week 2

Refrigeration Fundamentals and System Components & Electrical, Controls, and Safety for Refrigeration Systems

  • Describe the operating sequence and electrical role of the compressor, condenser fan motor, and evaporator fan motor within the cycle

  • Trace a basic control circuit from thermostat through contactor coil to compressor and identify what opens or closes at each step

  • Compare PSC, ECM, and shaded-pole motors on starting method, speed control, and typical refrigeration application

  • Explain how a run capacitor, start capacitor, and potential relay interact during compressor startup

Your checkpoint

A ladder-style wiring sketch for a single-phase condensing unit with each component and safety device annotated, plus a 15-question self-quiz on components and motors

Week 3

Refrigeration System Installation and Commissioning

  • Size and select line sets, filter-driers, and metering devices for a described walk-in cooler installation

  • Write a step-by-step evacuation procedure including micron-level targets and standing vacuum test criteria

  • Perform and document a nitrogen pressure test and leak check sequence before charging

  • Calculate a target superheat for a fixed-orifice system and a target subcooling for a TXV system from given conditions

  • Plan a commissioning checklist covering electrical, refrigerant, airflow, and temperature verification

Your checkpoint

A complete commissioning checklist for a walk-in cooler with evacuation targets, charge verification method, and recorded acceptance criteria for each line item

Week 4

Refrigeration System Diagnostics and Troubleshooting

  • Diagnose high superheat with low suction pressure and list probable causes ranked by likelihood

  • Diagnose high head pressure and high subcooling and distinguish between airflow, overcharge, and non-condensable causes

  • Interpret a pressure-temperature chart reading to confirm restricted liquid line, restricted suction line, or undercharge

  • Explain how to isolate a pump-down or defrost control fault using sequence-of-operation reasoning

  • Convert gauge readings and thermometer readings into a written diagnostic narrative for three fault scenarios

Your checkpoint

Three written case studies of 250 words each, each with symptoms, ranked causes, the test that confirms the diagnosis, and the corrective action

Week 5

Refrigeration System Diagnostics and Troubleshooting & Refrigeration System Service and Repair

  • Perform a systematic troubleshooting walkthrough of an ice machine or reach-in unit from complaint to root cause

  • Describe recovery, recycling, and evacuation procedures that comply with refrigerant handling regulations

  • Outline brazing and soldering steps including nitrogen purge, heat control, and leak verification

  • Explain compressor replacement steps including electrical checks, oil charge, and post-replacement verification

  • Identify when a repair versus replacement recommendation is appropriate and what data supports it

Your checkpoint

A service work order template filled out for a simulated compressor replacement, including recovery amounts, evacuation readings, and final operating pressures and temperatures

Week 6

Refrigeration System Service and Repair & Electrical, Controls, and Safety for Refrigeration Systems

  • Read and interpret a manufacturer wiring diagram to locate every safety and control device in a circuit

  • Test capacitors, contactors, thermistors, and pressure switches with a multimeter and state pass or fail criteria

  • Explain lockout-tagout, PPE, and refrigerant safety practices for service on energized and pressurized systems

  • Describe defrost termination and fan delay control operation and how to verify correct cycling

  • Identify electrical code and label requirements relevant to field-installed refrigeration equipment

Your checkpoint

A completed electrical diagnostic worksheet on a live or trainer circuit listing measured values, pass or fail judgments, and the corrective action for any failed component

Week 7

Refrigeration System Diagnostics and Troubleshooting & Refrigeration System Service and Repair & Electrical, Controls, and Safety for Refrigeration Systems

  • Combine mechanical, airflow, and electrical diagnosis into a single troubleshooting decision tree

  • Practice timed troubleshooting scenarios mixing refrigerant, electrical, and control faults

  • Review missed questions from weeks 1 through 6 and restate the underlying principle for each

  • Explain how to document a service call from arrival through customer handoff

Your checkpoint

A full-length timed practice exam of at least 50 questions with a score of 80 percent or higher and a written review of every missed item

Week 8

Refrigeration Fundamentals and System Components & Refrigeration System Installation and Commissioning & Refrigeration System Diagnostics and Troubleshooting & Refrigeration System Service and Repair & Electrical, Controls, and Safety for Refrigeration Systems

  • Review condensed notes for all five domains and confirm coverage of any weak areas flagged in week 7

  • Recite key formulas, target superheat and subcooling ranges, and evacuation targets from memory

  • Complete a second timed practice exam and compare results against week 7 to measure improvement

  • Build a one-page exam-day reference sheet limited to facts you can justify without notes

Your checkpoint

A second timed practice exam scoring 85 percent or higher plus a one-page final reference sheet covering all five domains

Milestones

Week 2: Can explain the vapor-compression cycle and trace a basic control circuit without notes, and scored at least 80 percent on the week 2 components and motors quiz

Week 4: Can take a set of pressure and temperature readings and name the most likely fault with a confirming test, demonstrated across three written case studies

Week 6: Can read a wiring diagram, locate every safety device, and state pass or fail criteria for capacitors, contactors, and pressure switches

Week 8: Scored 85 percent or higher on a second timed practice exam and produced a one-page reference sheet covering all five domains