Quick reference

ASME BPVC Construction Requirements (Sections I, IV, VIII)

  • Section I applies to power boilers generating steam above 15 psig and hot-water boilers operating above 160 psig or 250°F, including fired and unfired steam boilers and certain economizers.

  • Section IV applies to heating boilers limited to 15 psig steam or 160 psig water at 250°F; it covers cast-iron and steel heating boilers and their appurtenances.

  • Section VIII Div 1 applies to pressure vessels with internal or external pressure exceeding 15 psi; Div 2 provides alternative rules with design-by-analysis and higher allowable stresses; Div 3 covers high-pressure vessels.

  • Section I allowable stress values in Section II Part D are based on minimum tensile strength divided by 3.5 and yield strength divided by 1.5, limited by temperature.

  • Section VIII Div 1 joint efficiency for Type 1 butt welds is E = 1.00 with full radiography, 0.85 with spot radiography, and 0.70 with no radiography.

  • Section I hydrostatic test pressure is 1.5 × MAWP; Section VIII Div 1 test pressure is 1.3 × MAWP × (allowable stress at test temperature / allowable stress at design temperature).

  • Section I requires safety valve capacity to prevent pressure from exceeding 110% of MAWP; the set pressure may not exceed MAWP.

  • Section IV heating boilers are stamped with the H symbol; Section I power boilers use the S symbol; Section VIII Div 1 vessels use the U symbol.

Quick reference

NBIC Inspection

  • NBIC Part 2 covers in-service inspection of boilers and pressure vessels; it describes inspection methods, inspector qualification, condition evaluation, and records review.

  • NBIC does not set a universal inspection interval; the jurisdiction or owner/user establishes intervals based on service conditions, inspection history, and risk.

  • An NBIC inspection includes review of nameplate and data report, external examination, internal examination when required, safety-valve verification, and records review.

  • The inspector evaluates defects against NBIC acceptance criteria; cracks, laminations, and corrosion may require repair, alteration, or rerating.

  • NBIC Part 3 governs repairs and alterations; Part 4 covers heating boilers.

  • NBIC requires that repairs and alterations be performed by holders of an R Certificate of Authorization and documented on an R-1 form.

  • For pressure vessels, NBIC inspection may include visual examination, ultrasonic thickness measurement, and other NDE methods selected by the inspector.

  • A boiler or pressure vessel that fails NBIC inspection may be removed from service until repaired and reinspected.

Quick reference

Repairs and Alterations

  • A repair restores a boiler or pressure vessel to a condition that meets the original Code; an alteration changes MAWP, design temperature, or other design parameters.

  • Any repair or alteration to a Code item requires an R Certificate of Authorization holder and an R-1 form signed by the inspector.

  • Changing the MAWP or maximum temperature requires an alteration, new calculations, and a new or supplemental nameplate.

  • Repair welds must be made under a WPS/PQR qualified per Section IX, and welders must be qualified for the process and position.

  • NDE of repair welds is generally required to the extent that the original joint required it, or as specified by the inspector.

  • The original nameplate is retained; an alteration nameplate marked with the R symbol shows the new MAWP and temperature.

  • Repairs to pressure relief valves require a VR Certificate of Authorization and valve repair documentation.

  • Post-weld heat treatment after a repair is required when the original Code or material thickness required it.

Quick reference

Materials

  • ASME Section II Part A lists ferrous material specifications, Part B nonferrous, Part C welding materials, and Part D allowable stresses and physical properties.

  • Materials used in Code construction must conform to an ASME specification listed in Section II; unlisted materials require a Code Case or special approval.

  • Material Test Reports must be traceable to the heat number and to the specific item; the inspector reviews MTRs for compliance.

  • Section IX groups base metals by P-number and welding materials by F-number and A-number for procedure qualification.

  • Impact testing requirements depend on material, thickness, and temperature; Section VIII Div 1 UCS-66 provides exemption curves.

  • Section I and Section VIII allow certain materials only within specified temperature ranges; the allowable stress tables show these limits.

  • Marking of materials must be maintained or transferred; stamps or tags identify specification and heat number.

Quick reference

Welding and Nondestructive Examination

  • Section IX requires a written WPS supported by a PQR; essential variables include process, P-number, thickness, position, and preheat.

  • Welder performance qualification must be per Section IX and remains valid only while the welder uses the process at least once every six months.

  • Section VIII Div 1 full radiography acceptance is in UW-51; spot radiography acceptance is in UW-52.

  • NDE personnel must be qualified per ASNT SNT-TC-1A or CP-189, or an equivalent program accepted by the Code.

  • Joint efficiency depends on weld type and extent of radiography; Type 1 full radiography gives E = 1.00 in Section VIII Div 1.

  • Visual examination of welds is required before and after NDE; welds must be free of cracks, undercut beyond limits, and unacceptable porosity.

  • Hydrostatic testing after welding is required unless the Code provides an exemption; the inspector witnesses the test and checks gauge calibration.

  • Section I has specific radiographic requirements for longitudinal and circumferential butt welds in drums and shells.

Quick reference

Pressure Relief Devices and Certification

  • A safety valve is a pressure relief valve actuated by inlet static pressure and characterized by pop action; a relief valve opens proportionally.

  • ASME V symbol stamps safety valves for Section I; HV for Section IV heating boilers; UV for Section VIII pressure relief valves.

  • A National Board VR Certificate of Authorization is required to repair and remanufacture pressure relief valves.

  • Set pressure is the inlet pressure at which the valve begins to open; accumulation is the pressure increase above MAWP during discharge.

  • Section I limits accumulation to 110% of MAWP and requires the safety valve set pressure not to exceed MAWP.

  • Section VIII Div 1 limits accumulation to 110% of MAWP for a single relief valve and 116% for multiple valves.

  • Capacity certification of relief valves is based on National Board flow test requirements; valve capacity must equal or exceed the required relieving capacity.

  • Blowdown is the difference between set pressure and reseat pressure, expressed as a percentage of set pressure.

Quick reference

Inspection Duties

  • The Authorized Inspector verifies Code compliance throughout construction, including design review, material verification, welding, NDE, heat treatment, and testing.

  • The AI has authority to reject nonconforming work and to require repairs before Code stamping.

  • Before stamping, the AI confirms that all required inspections and tests are complete, data reports are signed, and nameplate data are correct.

  • The AI reviews WPS/PQR, welder qualifications, MTRs, NDE reports, heat-treatment records, and hydrostatic test records.

  • The AI witnesses hydrostatic tests, checks gauge calibration and test pressure, and verifies hold time.

  • For boilers, the AI verifies safety-valve capacity, set pressure, and accumulation limits.

  • The AI must be commissioned by the National Board and employed by an ASME-accredited Authorized Inspection Agency.

Quick reference

Reports

  • Section VIII Div 1 uses Form U-1 for pressure vessels; Div 2 uses U-2; Div 3 uses U-3.

  • Section I power boilers use Form P-2; Section IV heating boilers use Form H-2.

  • The Manufacturer's Data Report is signed by the manufacturer and the Authorized Inspector and includes design, material, NDE, and test data.

  • NBIC repairs and alterations are documented on Form R-1, signed by the R stamp holder and the inspector.

  • Data reports must not be signed before all required inspections and tests are complete; blank or incomplete forms are not acceptable.

  • Records must be retained and made available to the jurisdiction and inspector; the owner/user maintains inspection records.

  • The data report identifies the Code symbol stamp, MAWP, design temperature, and applicable Code edition and addenda.

Quick reference

Stamping and Administrative Requirements

  • ASME Code symbol stamps include S for Section I power boilers, H for Section IV heating boilers, U for Section VIII Div 1, U2 for Div 2, and U3 for Div 3.

  • Use of an ASME Code symbol stamp requires a valid Certificate of Authorization and an approved quality control manual.

  • Stamping and nameplate attachment are performed only after the Authorized Inspector authorizes the work.

  • The nameplate must show manufacturer, serial number, MAWP, design temperature, year built, and Code symbol.

  • NBIC R stamp is required for repairs and alterations; VR stamp is required for pressure relief valve repairs.

  • ASME Certificates of Authorization are renewed through audits by ASME; loss of certification prohibits stamping.

  • The Authorized Inspector's commission is issued by the National Board and must be maintained current.