NC Fire Alarm flashcards
NC Fire Alarm · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Accessible vs. readily accessible
- Accessible means reachable without climbing over or removing obstacles. Readily accessible adds that no tool, key, or ladder is needed for examination or maintenance.
- Supervisory signal
- A signal indicating an abnormal condition on a system or protected equipment, such as a closed valve or low tank level, that does not indicate a fire condition.
- Trouble signal
- A signal indicating a fault in the fire alarm system itself, such as an open circuit, ground fault, loss of primary power, or processor failure.
- Addressable vs. conventional
- Conventional panels group devices into zones and identify only the zone in alarm. Addressable panels identify each device individually by address for faster locating.
- NFPA 72 scope
- NFPA 72 covers fire detection, notification, and signaling system design, installation, inspection, testing, and maintenance. NEC Article 760 covers wiring methods.
- NC adopted codes
- North Carolina adopts the NC Building Code based on the IBC and the NC Fire Prevention Code based on the IFC. Both reference NFPA 72 for fire alarm requirements.
- AHJ authority
- The Authority Having Jurisdiction interprets code, approves plans, and conducts inspections. The AHJ has final say when documents conflict or intent is unclear.
- NFPA 72 annual testing
- NFPA 72 Table 14.4.3.2 requires annual testing of most initiating devices and notification appliances, with monthly or quarterly testing for many supervisory devices.
- Smoke detector spacing
- Spot-type smoke detectors on smooth ceilings are spaced at 30 feet maximum, with 15 feet (half spacing) to walls, reduced for ceilings above 10 feet.
- Duct detector location
- Duct smoke detectors must be installed downstream of filters and at least six duct widths from bends. The sampling tube must span the duct width.
- Manual pull station height
- Manual fire alarm boxes must be mounted 42 to 48 inches above finished floor, within 5 feet of an exit door, and unobstructed.
- Heat detector limits
- Heat detectors respond to fixed temperature or rate of rise. They are not life-safety substitutes for smoke detection and have wider spacing than smoke detectors.
- Audible minimum 15 dBA
- Public-mode audible appliances must produce at least 15 dBA above ambient at 10 feet, or 5 dBA above ambient, whichever is greater, in the occupiable space.
- 520 Hz requirement
- Sleeping areas require low-frequency 520 Hz square-wave audible appliances per NFPA 72 for new construction, because low frequency is more effective at waking occupants.
- Strobe synchronization
- Visible appliances in the same view must be synchronized. Unsynchronized strobes can trigger photosensitive seizures and do not meet NFPA 72 requirements.
- NAC voltage drop
- Notification appliance circuit voltage drop must be calculated so the last appliance receives its listed minimum operating voltage. Use the two-wire voltage drop formula.
- Secondary power 24h+5min
- NFPA 72 requires secondary power for 24 hours of standby followed by 5 minutes of alarm for most systems, and 15 minutes of alarm for voice systems.
- Battery sizing formula
- Amp-hours equal standby current times standby hours plus alarm current times alarm hours, multiplied by 1.2 for aging. This determines the required battery capacity.
- Battery recharge 80%
- The battery charger must restore the battery to 80 percent capacity within 24 hours, or per the manufacturer's listing, to ensure readiness for the next outage.
- Class A vs. Class B
- Class A circuits survive a single open because they have redundant paths. Class B circuits are supervised but fail on a single open.
- Sensitivity testing
- Smoke detector sensitivity must be tested within one year of installation and every two years thereafter. Detectors outside the listed range must be recalibrated or replaced.
- ITM records
- Inspection, testing, and maintenance records must document date, device, test performed, result, and tester, and must be available to the AHJ.
- Acceptance testing
- Before a system is placed in service, 100 percent of devices must be tested per NFPA 72 Chapter 14, and the results documented for the AHJ.
- Waterflow switch test
- Open the inspector's test valve and verify the alarm activates within 90 seconds for most listed waterflow devices. Test annually.
- FPL cable ratings
- Fire alarm cable must be listed FPL, FPLR, or FPLP. Plenum-rated FPLP is required in environmental air spaces per NEC Article 760.
- Power-limited separation
- Power-limited fire alarm circuits must be separated from non-power-limited circuits by at least 2 inches or a barrier per NEC Article 760.
- Fire alarm circuit marking
- The dedicated fire alarm branch circuit must be marked 'FIRE ALARM CIRCUIT' and connected ahead of the main disconnect per NFPA 72.
- Buried junction boxes
- Junction boxes and enclosures must remain accessible and cannot be buried in walls or ceilings. This applies to all fire alarm circuit connections.
- Voltage drop formula
- Vd equals 2 times length times current times resistance per 1000 feet divided by 1000. Use one-way length in feet for two-wire circuits.
- Strobe candela selection
- Candela rating depends on room size and mounting height per NFPA 72 Chapter 18 charts, ranging from 15 cd for small rooms to 177 cd for large areas.
- Record of completion
- NFPA 72 requires the installing contractor to provide a record of completion and as-built documentation to the owner at system turnover.
- NC contractor licensing
- Fire alarm contractors in North Carolina must hold the appropriate license, pull permits before work, and schedule AHJ inspections. Unlicensed work is a violation.