An operator is setting 12 precast vault sections, each weighing 1,450 lb, into a 9 ft deep excavation at a commercial site. The crane is a 28-ton articulating unit on a tandem-axle truck. The paved area slopes about 3% toward a storm drain. The operator plans to set both front outriggers on asphalt, the right rear outrigger on a gravel shoulder, and the left rear outrigger on a 4 ft by 4 ft steel plate covering a utility vault with a 6 in concrete lid. The outrigger beams can be fully extended. The level bubble is slightly off, and the operator proposes to crib only the left rear outrigger until the bubble centers. The utility vault is marked 'electrical duct bank - do not load.' The site supervisor wants the first lift within 30 minutes. The load chart for the planned configuration allows 1,850 lb at the 14 ft working radius.

1. Should the operator accept the setup as described? Identify the specific checks and decisions required before the first lift.

Read the worked answer

No. Three conditions must be resolved first. The 3% slope is about 1.7 degrees, and the crane must be leveled within the manufacturer's limit, commonly 1% or less; cribbing only one outrigger to center the bubble can twist the frame and shift load to the other outriggers. The left rear outrigger is bearing on a vault lid marked 'do not load,' so the operator needs the vault's structural rating and the actual outrigger reaction, not the 1,450 lb load weight. The right rear outrigger on gravel needs a load-distributing pad and a check for underground voids. Full extension does not guarantee adequate support. The correct decision is to relocate the crane or bridge the vault with an engineered plate sized for the outrigger force, level all outriggers with proper mats, and confirm soil/asphalt bearing. If those cannot be done, do not lift.

2. Assume the only practical location places the left rear outrigger over the vault. How would you determine whether a steel plate can safely distribute the load, and what information do you need?

Read the worked answer

Start with the manufacturer's maximum outrigger reaction for the actual boom configuration, radius, and load, not the crane's rated capacity or the load weight. Add the effect of dynamic load and load distribution between outriggers. Calculate bearing pressure as force divided by the effective area of the plate that actually transfers load to the vault walls, not the full plate area if it spans an opening. You need the vault cover rating, duct-bank depth and wall locations, soil condition, plate thickness and stiffness, and an engineer's evaluation of the span. A plate that merely covers the lid may transfer the outrigger force directly into an unrated cover. If the vault rating or reaction cannot be established, the setup is not acceptable. Mats increase area but cannot make an unrated vault safe.

3. What is the correct response if one outrigger cannot be fully extended because of the vault?

Read the worked answer

Use the manufacturer's capacity chart for the actual outrigger extension, if one is provided; if no partial-extension chart exists, do not lift. The fully extended chart does not apply, and capacity may drop sharply because the crane's stability and structural loading change. The RCL must be set to the correct outrigger configuration, and the crane may need to work only over the rear or in a restricted quadrant. Never crib or shim an outrigger to imitate full extension, because the beam and frame still see the partial-extension condition. If the required capacity is not available, relocate the crane, use a larger unit, or change the lift method.