NCCCO Boom Truck flashcards
NCCCO Boom Truck · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Ground bearing pressure
- Total crane and load weight divided by the outrigger pad contact area. Compare the result to the soil's allowable bearing capacity from a geotechnical evaluation before setup.
- Gross load calculation
- The sum of the load, rigging, slings, hook block, and all boom attachments. Gross load, not just the payload, must not exceed the chart's rated capacity.
- Radius measurement point
- Radius is horizontal distance from the crane's center of rotation to the center of the hoist line, measured with the load applied and boom deflection included.
- Boom deflection effect
- Under load, a long boom bends downward, increasing the actual radius. Verify radius with the load in the air or add the manufacturer's deflection allowance.
- Outrigger chart condition
- Outrigger capacity charts apply only with all beams fully extended, pads on firm level ground, and the crane level within the manufacturer's tolerance.
- Tipping line
- The line through the outrigger pads on the loaded side about which the crane would overturn. The load moment must stay well inside the stabilizing moment.
- Anti-two-block device
- A device that stops hoisting when the hook block approaches the boom tip. It must be functional and tested before each shift.
- Load moment indicator
- An instrument that computes load moment and warns or stops the crane when capacity is approached. A malfunctioning LMI places the crane out of service.
- Hook throat opening limit
- A hook must be removed from service when its throat opening increases beyond the manufacturer's limit, commonly 10 to 15 percent of the original.
- Wire rope removal criteria
- Broken wire counts per lay length, diameter reduction, kinking, birdcaging, heat damage, or severe corrosion require removing the rope from service per the manufacturer.
- Sling leg tension formula
- For a two-leg bridle, tension per leg equals half the load divided by the sine of the leg angle from horizontal. Shallow angles greatly increase tension.
- Working load limit
- The maximum load a rigging component is rated to carry in a specific configuration. The weakest component in the system sets the overall system capacity.
- Center of gravity control
- The load's center of gravity must hang directly below the hook. Off-center picks cause tilt, load shift, and uncontrolled swing during the lift.
- Tag line purpose
- A rope used to control load rotation and swing from outside the fall zone. It keeps personnel from touching or standing under the suspended load.
- Shock loading
- Sudden starts, stops, or snatching a load multiplies forces far beyond static weight. Hoist and lower smoothly to avoid exceeding rigging and chart limits.
- Designated signal person
- One qualified person directs the operator at a time. Anyone may give a stop signal, and the operator must obey every stop signal received.
- Standard stop hand signal
- Arm extended, palm down, moved back and forth horizontally. It means stop immediately and applies to any person giving it.
- Loss of communication rule
- If radio or hand signal communication is lost, or the load leaves the signal person's view, the operator stops all motion until communication is restored.
- Critical lift definition
- A lift meeting employer-defined criteria such as near-capacity loads, multiple cranes, personnel aloft, or high-consequence areas. It requires a written plan and pre-lift meeting.
- Minimum approach distance
- The required clearance from energized power lines set by the standard and utility owner. It must be maintained unless the line is de-energized and grounded.
- Operator qualification requirement
- Construction crane operators must be certified or qualified under OSHA 29 CFR 1926 Subpart CC, and certification must remain current through recertification.
- Swing radius barricade
- The area the counterweight and boom sweep must be barricaded to keep personnel out. Access is controlled by the lift director during the lift.
- Level tolerance check
- Set the crane level using a level on the crane frame within the manufacturer's tolerance, commonly one percent or less, before extending the boom.
- Pick-and-carry chart
- Traveling with a suspended load is permitted only if the manufacturer provides a pick-and-carry chart and the route, ground, and tire ratings are verified.
- Jib and attachment deduction
- Any jib, stinger, or stowed attachment mounted on the boom adds weight and changes capacity. Deduct it from the chart's rated load before comparing.
- Interpolation rule
- Capacity may be interpolated between tabulated radii or boom lengths, but never extrapolated beyond the chart's published values.
- Pre-shift inspection scope
- Check wire rope, hook and latch, sheaves, drums, brakes, outriggers, LMI, and anti-two-block before the first lift, and document any defects found.
- Out-of-service tag
- A defect found during inspection requires tagging the crane out of service and reporting it. It stays out until repaired and re-inspected.
- Tandem lift load share
- Each crane in a two-crane lift must be rated for its calculated share of the load, with a written plan and a designated lift director.
- Power line contact response
- If the crane contacts an energized line, the operator stays in the cab, warns others away, and avoids touching the crane and ground at the same time.
- Unlevel ground effect
- An unlevel crane shifts the load moment and can overload one outrigger. Use cribbing and verified level ground, never rely on the chart alone.
- Rigger qualification
- Under Subpart CC, riggers handling loads must be qualified by training and experience. The employer verifies and documents that qualification.