Know the pressure path
Concrete leaves the hopper past the agitator into the S-valve (or rock valve) and wear plate, is pushed by the delivery pistons, and travels the pipeline. A worn wear plate and S-tube gap, worn piston cups, and a starved hopper all produce the same symptom: lost output with rising pressure. Hydraulic pressure is stored in the accumulator - treat the system as live until it is bled down per the manufacturer.
Inspection that finds something
- Structure: boom sections, pins and retainers, welds, outrigger beams and cylinders, cracks at the pedestal.
- Delivery end: clamp condition and torque, gaskets, safety pins, whip checks, hose cover cuts, soft spots, end fittings.
- Machine: fluid levels and leaks, water box, remote control and E-stop function, horn, lights, guards.
- Pipeline: pressure rating matched to the pump, diameter matched to the mix, supports and anchors at bends.
Worked example
A 4 in. line is proposed for a 1½ in. maximum-aggregate mix. The usual rule is line ID of at least three times the largest aggregate: 1.5 × 3 = 4.5 in., so a 4 in. line is undersized and will arch and plug at elbows. The fix is 5 in. line, or a mix redesigned with smaller aggregate - not more water.
Traps that cost marks
Assuming a clamp is fine because it "looks tight"; mating clamp halves from different sets; skipping the water box and piston cups because they are hard to reach; missing a missing safety pin; accepting a hose with a bulge or a cover cut deep enough to show wire.