- Batter pile
- A pile driven at a planned angle from vertical. The specified batter is verified in two directions before driving, and the leads are adjusted to match the angle.
- Cut-off elevation
- The finished top elevation of a driven pile after the excess length is cut away. It is set by the project drawings and confirmed by survey before cutting.
- Single-acting diesel hammer
- A diesel hammer that fires once per cycle, lifting the ram with combustion gas and letting gravity return it. Rated by ram weight and stroke.
- Vibratory driver
- A driver using rotating eccentric counterweights to create vertical vibration. Driving force depends on eccentric moment and frequency, and it works best in granular soils.
- Pile driving analyzer
- An instrument measuring force and velocity at the pile head during driving. The case method estimates capacity and integrity from those records, not from static testing.
- Follower
- A section that transmits hammer energy to a pile whose top is below the reach of the leads. Its added mass changes the energy delivered, so criteria are adjusted.
- Pile gate
- A hinged or sliding guide in the leads that holds the pile plumb and aligned with the hammer before and during driving.
- Pile pick points
- Locations on a pile designated by the manufacturer for lifting. Lifting at other points can crack concrete piles, so the handling diagram is followed.
- Refusal
- A condition where the pile stops penetrating under the specified blows per inch. It is verified with the engineer before cut-off, since it may indicate an obstruction.
- Load radius
- The horizontal distance from the rig's center of rotation to the center of gravity of the load. It sets the chart capacity and grows as a long pile is stood up.
- Gross versus allowable load
- Gross capacity comes from the chart at the working radius. Allowable pile load is gross capacity minus the weight of leads, hammer, pile, and attachments.
- Outrigger float
- The pad or float under an outrigger beam that spreads load into the ground. Its position and bearing area must match the configuration used in the load chart.
- Wind sail area
- The exposed area of a standing pile that catches wind. As the pile is raised, sail area grows, and manufacturer wind limits determine when driving stops.
- Rated capacity limiter
- A device that warns and limits the rig when the load approaches the charted capacity. It is tested before work and never used as a substitute for the chart.
- Anti-two-block device
- A device that prevents the hook block from contacting the boom tip. It is tested each shift, and a failure stops operations until repaired.
- Wire rope inspection
- A pre-shift check for broken wires, kinks, bird-caging, corrosion, and diameter loss. Rope is removed when it meets the rigging standard's removal criteria.
- Sling angle tension
- Leg tension equals load divided by the number of legs times the sine of the angle from horizontal. Shallow angles sharply increase tension in each leg.
- Hydraulic injection hazard
- Fluid escaping under pressure can pierce skin. Pressure is released before opening a fitting, and a suspected injection is a medical emergency.
- Lockout during maintenance
- The hammer is lowered, blocked, and its energy source locked out before service. The rig is never serviced with a suspended load.
- Designated signal person
- The single crew member who directs the operator by agreed hand signals or radio. The operator stops on a stop signal from anyone, then resumes only on this person's signal.
- Exclusion zone
- The area around the driving location kept clear of all but the working crew. It is sized from hammer, leads, and pile radius plus a margin for breakage.
- Tag line
- A rope used to control pile rotation from outside the swing radius. Personnel never steady a suspended pile by hand.
- Lost radio signal
- Loss of communication between signal person and operator. The operation stops until communication is restored, since the operator may not move on voice alone.
- Utility locate limits
- A locate ticket marks approximate buried facilities. Pile locations are verified by hand digging or vacuum excavation, since the ticket alone does not clear the driving area.
- Ground bearing check
- Verification that the soil under outriggers or crawlers can carry the rig's load. Soft fill and backfilled excavations require mats or cribbing sized by calculation.
- Geotechnical report
- The soil borings and bearing stratum data that set planned pile length and hammer energy. Pile length and driving criteria are matched to it before the first set.
- Approach distance to lines
- The required minimum separation from energized overhead lines. The utility confirms de-energizing, or the rig maintains the distance for the line's voltage.
- Rig leveling
- Setting the rig level on stable ground with outriggers fully extended or crawlers fully bearing. An out-of-level rig changes radius and invalidates the chart.
- Boom configuration check
- Confirmation that boom length, angle, and counterweight match the chart being used. Changing any of these requires re-evaluating capacity before the next lift.
- Power line contact response
- The operator stays in the cab and warns others away until the utility confirms de-energizing. The crew does not touch the rig during contact.
- Instability response
- If an outrigger sinks or the rig tips, lower the load and stop the swing before correcting the ground. Leveling is never attempted under a suspended load.
- Stop-work condition
- An unexpected event such as refusal, lost hammer stroke, or a pile moving off line. Work stops until the cause is evaluated and corrected.