Weekly Inspection Findings: What Stops the Crane and Who Clears It

Weekly inspection of a three-year-old 60 m jib tower crane working two shifts. Findings: (a) the hoist rope, 16 mm 6×36 IWRC, has six broken wires in one lay within a 30 × d length and a birdcage about 4 m from the dead end; (b) the hoist limit switch lever is cable-tied out of the way because it 'kept tripping'; (c) two slew ring bolts below the cab have no torque stripe and rust is weeping from the joint; (d) the anemometer cups are seized and the wind readout shows 0 m/s while the site flags are stiff; (e) the third-party thorough examination certificate on file is dated 13 months ago and the crane has worked continuously since; (f) the chart in the cab is for a 55 m jib. The site manager wants the crane back in service after the shift because the concrete pour is booked for 06:00.

1. Sort these findings: which remove the crane from service immediately, which need action before the next lift, and who can authorise return to service?

Read the worked answer

Immediate out of service:

  • (b) A defeated limit switch is a safety device out of service. Defeating it is never acceptable, and the reason it kept tripping must be diagnosed, not hidden.
  • (a) A birdcage is a rope distortion indicating core or strand damage; the rope comes out of service regardless of the wire count.
  • (c) Missing torque stripe plus rust weeping at a slew ring joint suggests loss of preload or corrosion in a critical connection. No operation until the bolts are checked by the manufacturer's procedure; a failed slew ring connection is catastrophic.
  • (e) An expired thorough examination means the crane has no valid certification to work.

Before the next lift:

  • (d) A seized anemometer means wind limits cannot be demonstrated; if the site relies on it, the crane is effectively out of service until it reads correctly.
  • (f) A 55 m chart on a 60 m jib crane means every capacity used has been wrong. Replace with the correct chart and verify the LMI configuration.

Return to service requires the competent person's sign-off plus a functional test of the limits and LMI; the operator may refuse, and the 06:00 pour does not override any of this.

2. How do you deal with the hoist rope, and what else must be checked because of it?

Read the worked answer

The birdcage alone settles it: a birdcage is a permanent distortion from core protrusion or strand displacement and is a discard condition irrespective of how many wires are broken. Add six broken wires in one lay concentrated in a 30 × d length and the rope is at the end of its life in that zone.

Do not simply quote a number and argue about it. The process is:

  • Compare the wire counts, position and distribution against the rope-specific discard table in the applicable rope inspection standard and the manufacturer's manual, by a competent person.
  • Remove the rope from service and fit a new rope of the correct specification.
  • Investigate the cause before the new rope goes on: seized or worn sheaves, incorrect groove size, misaligned reeving, drum spooling problems, tight sheave at the dead end, or a shock load.
  • After re-reeving, reset and function-test the hoist limit and the LMI, and record the rope change and the running-in inspection.

3. The limit switch was tied off 'because it kept tripping.' What does that tell you, and what is required before the crane lifts again?

Read the worked answer

It tells you the switch was doing its job, or the crane had a fault that made it operate early. A hoist limit that trips repeatedly usually points to one of: incorrect switch setting, slack rope or a mis-set slack-rope device, brake slip letting the hook block creep up, two-blocking by the operator, or a malfunctioning switch. Tying the lever back converts a protective device into a collision waiting to happen: the block can be pulled into the trolley, shock-loading and dropping the load.

Before the crane lifts again:

  • Remove the tie and find the actual cause; repair the switch or correct the setting, brake or operating practice.
  • Function-test the upper limit so it stops the hook block with the clearance stated in the manual, and test at slow and normal speed.
  • Function-test all other limits and the LMI, and check the slack-rope device if fitted.
  • Record the defect, the repair and the test, and require the competent person's sign-off.

A pattern of defeated safety devices should also trigger a review of the maintenance regime and the operator's briefing, not just a single repair.