NCCCO Tower Crane study materials
NCCCO Tower Crane study resources

NCCCO Tower Crane study plan

NCCCO Tower Crane · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Load Charts and Rigging

  • Read a manufacturer load chart and locate rated capacity for a given boom length, radius, and jib configuration

  • Compute net capacity by subtracting rigging weight and applying the correct capacity deduction

  • Distinguish structural limits from stability limits on a tower crane chart and state which governs at a given radius

  • Convert radii and loads between feet/inches and meters, and between pounds and kilograms, without arithmetic error

Your checkpoint

Completed 25-item chart-reading worksheet scored at 90% or better, with every missed item annotated with the specific reason for the error

Week 2

Load Charts and Rigging & Site Preparation and Crane Setup

  • Calculate sling tension for two-leg, three-leg, and four-leg bridle hitches at 30, 45, and 60 degree horizontal angles

  • Determine load weight from volume and material density for steel, concrete, and lumber

  • Select shackles, hooks, slings, and hardware sized to the calculated load and hitch configuration

  • Identify site conditions that affect crane setup, including soil type, slope, and adjacent structures

Your checkpoint

A written rigging plan for one simulated lift containing the weight calculation, sling tension, hardware list, and a text-described sketch of the hitch

Week 3

Site Preparation and Crane Setup

  • Explain how the crane's foundation requirements relate to the reaction loads the foundation must resist

  • Estimate ground bearing pressure for the crane's support condition and decide whether a mat or pad is required

  • Determine minimum clearance distances from energized power lines, adjacent structures, and other cranes

  • Lay out a crane position that satisfies swing radius, tail swing, and erection and dismantling space

  • Assemble a site-specific setup checklist from the requirements you derived

Your checkpoint

A written site setup plan for a hypothetical congested urban site with a stated crane position and a text-described clearance diagram justified by specific distances

Week 4

Crane Assembly, Disassembly, and Climbing

  • Sequence tower crane assembly from base section through mast, turntable, jib, and counterweight, listing every step in order

  • Identify the function of mast sections, climbing frame, hydraulic unit, turntable, and counterweight

  • Describe the climbing sequence and list the conditions that must be satisfied before climbing begins

  • Recognize pre-assembly inspection points for pins, bolts, and structural members

Your checkpoint

A written assembly-and-climbing procedure with all steps in correct order, self-scored against a checklist rubric with no omissions

Week 5

Crane Assembly, Disassembly, and Climbing & Lifting Operations

  • Describe the roles and duties of the assembly director, signal person, and operator during assembly and dismantling

  • State the wind-speed limits that apply to erection, climbing, and lifting operations

  • Identify the post-assembly inspection and load-testing requirements that must be met before the crane goes into service

  • Plan a lift end to end by determining rigging, radius, capacity utilization, and travel path

Your checkpoint

A complete lift plan for one critical or near-capacity lift containing every required field and a calculated capacity utilization percentage

Week 6

Lifting Operations

  • Interpret standard hand signals and state the correct radio and voice communication protocol for a lift

  • Explain how to read the load moment indicator and describe the correct action as the crane approaches a limit

  • Plan a blind lift and a lift over an occupied area, stating the controls each requires

  • Determine when taglines are required and identify prohibited practices such as side loading and dragging loads

Your checkpoint

A tabletop walkthrough of five lift scenarios recording the decision made at each triggering condition and the reason for it

Week 7

Safety, Inspection, and Maintenance

  • Distinguish daily, monthly, annual, and post-assembly inspection intervals and list what each covers

  • List the items verified during a pre-shift inspection of wire rope, hooks, brakes, and limit devices

  • Describe lockout/tagout and the procedure for removing a deficient crane from service

  • State wire rope removal criteria and the recordkeeping required for maintenance

  • Identify fall protection and personnel lifting requirements

Your checkpoint

A completed daily inspection checklist plus a written list of ten simulated deficiencies, each paired with the correct corrective action

Week 8

Site Preparation and Crane Setup & Crane Assembly, Disassembly, and Climbing & Load Charts and Rigging & Lifting Operations & Safety, Inspection, and Maintenance

  • Complete three timed 60-question practice exams spanning all five domains

  • Categorize every missed item by domain and by error type (knowledge gap, misread, calculation)

  • Re-derive the fifteen most common calculations from memory without notes

  • Condense limits, clearances, and signal definitions onto a single reference page

Your checkpoint

Three practice exams scored at 85% or higher with a written error-analysis log identifying each weak sub-topic

Milestones

Week 2: Score 80% or better on a self-written 20-question quiz on load charts and rigging, with all calculation items shown as worked steps

Week 4: Score 80% or better on a 30-question self-written quiz covering domains 1, 2, and 3

Week 6: Complete the five-scenario tabletop walkthrough with a defensible stated reason for every decision, and score 80% or better on a 25-question lifting-operations quiz

Week 8: Average 85% or higher across three timed 60-question practice exams with no single domain below 75%