NCCE flashcards
NCCE · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- IEC 60601-1
- General standard for basic safety and essential performance of medical electrical equipment; collateral and particular standards add device-specific requirements for testing and compliance.
- Essential performance
- Performance of a medical device necessary to maintain residual risk within acceptable limits; loss or degradation must be evaluated during testing and risk analysis.
- Type CF applied part
- Applied part with the highest degree of protection against electric shock, suitable for direct cardiac contact; patient leakage current limited to 10 µA in normal condition.
- Microshock
- Low-level current passing through a low-resistance pathway such as an intracardiac catheter; currents as low as 10 µA can induce ventricular fibrillation.
- Line isolation monitor
- Device monitoring an isolated power system in critical care areas; alarms when hazard current exceeds 5 mA, allowing one fault to ground without power interruption.
- Ground continuity test
- Verification that resistance between the protective earth pin and exposed conductive parts is typically ≤ 0.1 Ω using a test current of at least 25 A.
- Leakage current limits
- IEC 60601-1 normal-condition limits: earth leakage ≤ 5 mA, patient leakage type BF ≤ 100 µA, type CF ≤ 10 µA; single-fault limits are higher.
- Risk management ISO 14971
- Standard process for identifying hazards, estimating and evaluating risk, implementing controls, and monitoring residual risk throughout the device lifecycle.
- Recall Class I
- Recall classification for a device with reasonable probability of serious adverse health consequences or death; requires immediate action and public notification.
- Uptime formula
- Uptime = (scheduled available time − downtime) / scheduled available time × 100; downtime includes response, repair, and parts wait time.
- Incoming inspection
- Verification of a new device against the purchase order, including safety testing, performance verification, and documentation before clinical release.
- Risk-based PM interval
- Preventive maintenance schedule derived from manufacturer recommendations, device criticality, failure history, and clinical use, with documented justification for deviations.
- CMMS
- Computerized maintenance management system used to track work orders, equipment inventory, PM schedules, calibration records, and maintenance history for regulatory compliance.
- Pulse oximetry principle
- Ratio-of-ratios of red (660 nm) and infrared (940 nm) absorbance; accuracy is degraded by carboxyhemoglobin, methemoglobin, motion, and poor perfusion.
- Defibrillator energy verification
- Delivered energy is measured with a calibrated analyzer; biphasic waveforms typically use 120–200 J versus 360 J monophasic, verified annually and after repair.
- Electrosurgical unit waveforms
- Monopolar coagulation uses interrupted high-voltage bursts; cut uses continuous low-voltage waveform; dispersive electrode contact controls current density and burn risk.
- Infusion pump accuracy
- Flow accuracy verified gravimetrically, typically ±5% for volumetric pumps at mid-rate; occlusion alarm thresholds checked against manufacturer specification.
- CT dose metrics
- CTDIvol and DLP (mGy·cm) quantify CT radiation dose; DLP × k-factor estimates effective dose; HVL and kVp accuracy tests verify exposure.
- Alarm priority IEC 60601-1-8
- High-priority alarms require visual and auditory signals distinguishable at 1 m; signal characteristics must match the physiological alarm condition.
- Calibration traceability
- Test instruments must be traceable to national standards such as NIST, with documented calibration certificates and defined calibration intervals.
- Electrical safety test sequence
- Visual inspection → ground continuity → insulation resistance → leakage current (earth, enclosure, patient) → functional performance verification.
- Battery capacity testing
- Lithium-ion batteries degrade with age and cycle count; periodic capacity testing and replacement schedules prevent device failure during clinical use.
- HL7 and FHIR
- Standards for exchanging clinical data; HL7 v2 messages and FHIR resources carry device observations and patient data between devices and EHR systems.
- Medical device VLAN
- Network segmentation isolating clinical devices from enterprise IT; firewalls and access control lists limit lateral movement and protect patient data.
- NTP time synchronization
- Network time protocol keeps device and EHR clocks aligned; clock drift causes misattributed alarms and documentation errors in the clinical record.
- SBOM
- Software bill of materials listing components and dependencies of device software; used for vulnerability monitoring and cybersecurity risk management.
- NFPA 99
- Healthcare facilities code covering electrical systems, medical gas, and utilities; defines essential electrical system branches and critical care requirements.
- Medical gas zone valve
- Shutoff valve for a section of the medical gas pipeline; pressure and purity are verified per NFPA 99 and USP standards, with alarms for abnormal conditions.
- Operating room HVAC
- Operating rooms require positive pressure relative to adjacent spaces and typically 20–25 air changes per hour with HEPA filtration; isolation rooms use negative pressure.
- Legionella control
- Water management with hot water storage ≥ 60 °C and return ≥ 51 °C, plus flushing protocols, to prevent Legionella growth in facility plumbing.
- Clinical engineering ethics
- Prioritize patient safety over cost or convenience; disclose conflicts of interest and report unsafe conditions through proper channels.
- Adverse event reporting
- US manufacturers report deaths and serious injuries to FDA within 30 days (5 days for certain events); user facilities report deaths to FDA and the manufacturer.