NCCER Cabinetmaking · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Cabinetmaking Fundamentals & Layout and Measurement

  • Define the standard cabinet anatomy terms (carcass, face frame, stile, rail, toe kick, reveal) and label them on a hand sketch of a base and a wall cabinet.

  • Convert fractional inch measurements to decimals and back without a calculator error, working through 20 practice conversions.

  • Explain how a 32 mm system hole pattern differs from face-frame construction and state which one your project uses.

  • Set up a cut list template that records part name, quantity, length, width, thickness, and grain direction.

Your checkpoint

A one-page labeled cabinet anatomy sketch plus a completed 20-item fraction-to-decimal conversion sheet scored at 90 percent or better.

Week 2

Layout and Measurement & Cabinetmaking Fundamentals

  • Measure and mark a full-size layout on scrap stock using a tape, combination square, and marking knife, holding tolerance to 1/32 in.

  • Calculate inside, outside, and centerline dimensions for a three-cabinet run that must fit a 96 in wall with two 1/8 in scribes.

  • Apply the 3-4-5 method to square a layout rectangle and verify diagonals match within 1/16 in.

  • Read a simple elevation and plan drawing and transfer three dimensions from each to a cut list.

Your checkpoint

A dimensioned run layout sheet proving a three-cabinet fit in a 96 in opening, with diagonal check recorded and initialed.

Week 3

Materials and Hardware & Cutting and Machining

  • Compare plywood, MDF, particleboard, and solid stock on stability, screw holding, edge treatment, and best use, and pick the right one for carcass, door, and drawer box.

  • Identify the common hardware items (European hinge, drawer slide, shelf pin, connector bolt) and state the mounting requirements for each.

  • Select the correct blade, feed direction, and safety device for ripping solid stock versus cutting sheet goods on the table saw.

  • Lay out and cut a dado, rabbet, and groove to a marked depth within 1/64 in.

Your checkpoint

A materials and hardware selection matrix for your project plus three test joints (dado, rabbet, groove) cut and labeled with measured depths.

Week 4

Cutting and Machining & Layout and Measurement

  • Build a cut sequence that minimizes handling of sheet goods and prevents climb-cut or kickback situations.

  • Machine a set of parts from the week 2 cut list, checking each against the list before and after cutting.

  • Set up and use a stop block for repeatable crosscuts, verifying five consecutive parts match within 1/64 in.

  • Drill shelf-pin holes at even spacing using a jig or story stick and confirm alignment across two panels.

Your checkpoint

A fully machined and labeled part set for one cabinet, with a QC sheet showing every part measured against the cut list.

Week 5

Assembly and Installation & Cutting and Machining

  • Assemble a carcass square by checking both diagonals and clamping before fastening.

  • Choose and install the correct fastener for carcass joinery, avoiding splits in plywood edges and MDF.

  • Fit and hang a door on European hinges, adjusting the three adjustment screws to close the reveal evenly.

  • Install a drawer slide pair parallel and flush so the drawer runs without binding.

Your checkpoint

One assembled, squared cabinet with a hung and adjusted door and a working drawer, with diagonal and reveal measurements recorded.

Week 6

Assembly and Installation & Cabinetmaking Fundamentals

  • Plan an installation sequence for a base and wall cabinet run, including shimming, leveling, and fastening to studs.

  • Locate studs and mark them on the wall, then map cabinet screw locations to hit framing.

  • Set cabinets level and plumb, scribe to an out-of-square wall, and install filler strips so reveals stay consistent.

  • Describe how to install a toe kick and crown or light rail so joints land on cabinet lines.

Your checkpoint

A written installation sequence with a wall-marking diagram showing stud locations and screw points for the full run.

Week 7

Finishing and Safety & Materials and Hardware

  • Sand a sample panel through the correct grit progression and inspect for swirl marks under raking light.

  • Apply a test finish to three scrap samples, comparing sheen, dry time, and coverage, and select one for the project.

  • Match the finish schedule to the material: state which products suit solid wood, plywood, and MDF edges with filler.

  • Identify the PPE required for each finishing product you use and set up ventilation before opening the container.

Your checkpoint

Three labeled finish samples with a written finish schedule naming product, grit sequence, number of coats, and required PPE.

Week 8

Finishing and Safety & Cabinetmaking Fundamentals & Layout and Measurement & Materials and Hardware & Cutting and Machining & Assembly and Installation

  • Apply the chosen finish to the completed cabinet and inspect for runs, dry spots, and uneven sheen.

  • Perform a full safety audit of your shop setup: blade guards, dust collection, fire extinguisher, and chemical storage.

  • Review the six domain areas against your notes and list the three weakest topics with a plan to close each gap.

  • Rehearse the measurement and layout skills under time pressure with a 30-question self-test.

Your checkpoint

A finished, inspected cabinet plus a one-page gap analysis listing three weak topics and a 30-question self-test scored at 80 percent or better.

Milestones

Week 2: You can measure, mark, and verify a layout to 1/32 in and prove a cabinet run fits an opening with scribes.

Week 4: You have a complete, labeled, machined part set that matches the cut list within 1/64 in on every repeat cut.

Week 6: One cabinet is assembled square with a working door and drawer, and you have a written installation sequence with stud mapping.

Week 8: The finished cabinet passes your own QC inspection and your self-test score is 80 percent or better with a written gap plan.