Lockout/Tagout (LOTO)
A safety procedure that isolates and locks all energy sources before servicing equipment. The authorized employee verifies a zero-energy state by testing, then applies locks and tags.
Arc Flash Boundary
The distance from energized equipment where incident energy equals 1.2 cal/cm², the threshold for second-degree burns. NFPA 70E uses it to select arc-rated PPE.
Confined Space Atmospheric Limits
Acceptable entry atmosphere: oxygen 19.5–23.5 percent, flammable gas below 10 percent LEL, and hydrogen sulfide and carbon monoxide within published exposure limits. Continuous monitoring is required.
Ohm's Law and Power
V equals I times R. Power P equals V times I, also I squared times R or V squared divided by R. These relationships size conductors and verify circuit loading.
Parallel Circuit Rule
Voltage is the same across all branches, and total resistance is the reciprocal of the sum of reciprocals. Total resistance is always less than the smallest branch resistance.
Three-Phase Power Formula
For a balanced three-phase load, real power equals the square root of three times line-to-line voltage times line current times power factor.
Voltage Drop Formula
Single-phase voltage drop equals two times K times current times length divided by circular mils, where K is 12.9 for copper and 21.2 for aluminum.
NEC Article 760
The National Electrical Code article governing fire alarm systems, including power sources, circuit classification, wiring methods, and separation from other circuits.
TIA-568 Cabling Standard
The commercial building telecommunications cabling standard defining categories, performance requirements, topology, and maximum distances for structured cabling systems.
Riser Diagram
A drawing showing the vertical distribution of systems between floors, including feeder sizes, panel locations, and riser pathways. It complements plan views.
Horizontal Cabling Limit
Permanent horizontal cabling is limited to 90 meters (295 feet). Adding patch cords at each end yields a maximum 100-meter channel.
Cable Bend Radius
The minimum curve a cable can tolerate without performance loss. Common practice is four times cable diameter for UTP and ten times for fiber during installation.
Telecommunications Grounding Busbar
A copper busbar in the telecommunications room bonded to the building grounding electrode system. It provides a common reference for racks, cable shields, and equipment.
Projector Throw Ratio
Throw distance divided by screen width. It determines lens selection and mounting location for a desired image size.
HDCP 2.2 Compliance
High-bandwidth Digital Content Protection required for 4K UHD protected content. Non-compliant splitters or displays cause blank screens or downscaled output.
70-Volt Distributed Speaker System
A constant-voltage system using transformers at each speaker. Power taps set wattage per speaker, and total tap wattage must not exceed amplifier rating.
Fail-Safe vs. Fail-Secure
Fail-safe locks unlock on power loss, required for egress paths such as maglocks. Fail-secure locks remain locked on power loss, used on secure storage doors.
OSDP Protocol
Open Supervised Device Protocol for access control readers. It supports bidirectional encrypted communication (Secure Channel) and replaces legacy Wiegand interfaces.
DORI Camera Standard
A camera coverage metric: detect, observe, recognize, and identify. Identify requires roughly 80 to 100 pixels per foot at the target.
Smoke Detector Spacing
NFPA 72 requires no more than 30 feet between detectors on smooth ceilings and 15 feet from walls. A general rule allows 900 square feet per detector.
Class A Fire Alarm Circuit
A circuit that continues to operate with a single open or ground fault. It is required for many high-rise and life-safety applications.
Fire Alarm Battery Backup
Control units must support 24 hours of standby plus 5 minutes of alarm signaling, or 15 minutes for voice evacuation systems.
Power over Ethernet Standards
IEEE 802.3af delivers 15.4 watts, 802.3at delivers 30 watts, and 802.3bt delivers up to 90 watts at the power sourcing equipment.
Single-Mode Fiber
Fiber with a small core that carries one propagation mode, supporting long distances in kilometers. Used for campus and inter-building backbones.
Private IPv4 Ranges
Non-routable address ranges: 10.0.0.0/8, 172.16.0.0/12, and 192.168.0.0/16. They are used inside networks behind NAT devices.
Pre-Functional Checklist
A commissioning document verifying installation quality before energizing: power, grounding, terminations, labeling, firmware versions, and device addressing.
Integrated Systems Test
A commissioning test verifying cross-system sequences, such as fire alarm activating door release, HVAC shutdown, elevator recall, and public address override.
Point-to-Point Verification
Confirming every control system input and output matches the as-built drawings and sequence of operations before functional performance testing begins.
Critical Path Method
A scheduling technique identifying the longest sequence of dependent tasks. Activities on the critical path have zero float and determine project duration.
Request for Information
A formal document asking the designer to clarify ambiguous or conflicting drawings and specifications. Responses become part of the contract documents.
Cost Performance Index
Earned value divided by actual cost. A value above one means the project is under budget; below one means it is over budget.