Mistake 1

When asked what a 4-20 mA transmitter outputs at 60 percent of span, the candidate multiplies 0.6 by 20 and answers 12.0 mA (or multiplies 0.6 by 16 and answers 9.6 mA).

Percent is treated as a direct multiplier of the full 20 mA or the 16 mA span, and the 4 mA live zero is forgotten under time pressure.

What to do instead

Drill the single formula until automatic: mA = 4 + (16 x decimal percent). Check the answer by sanity: 0 percent must equal 4 mA, 50 percent must equal 12 mA, 100 percent must equal 20 mA.

Mistake 2

Signs off a loop check after verifying the reading only at 0 and 100 percent, with no as-found data recorded.

Candidates equate 'it moves full scale' with 'the loop is checked' and skip intermediate points to save time.

What to do instead

Use a five-point check (0, 25, 50, 75, 100 percent) driven from the field with the value read at the control system, verify the loop is not reversed, and record as-found and as-left values for every point.

Mistake 3

On a leaking instrument tube fitting, the candidate answers 'keep tightening until the leak stops' instead of following a specified make-up.

Leak-equals-tighten is the intuitive field reaction, and the candidate has not memorized that a ferrule-type fitting is made up by counted turns from finger tight.

What to do instead

Make up finger tight, mark the nut, then turn the specified amount (for a typical 1/4 inch two-ferrule fitting, 1-1/4 turns) using two wrenches. If it still leaks, replace the ferrules rather than over-torquing.

Mistake 4

Terminates the cable shield at both the field and the control-room end.

The candidate reasons that more grounds equal better noise rejection, not realizing a two-point ground creates a ground loop.

What to do instead

Ground the shield at one end only, normally the control-room or single-point busbar, per the project specification, and leave the field end insulated and trimmed back.

Mistake 5

Treats opening the breaker or pressing the stop button as complete energy isolation and begins work.

Candidates confuse 'de-energized' with 'isolated and verified' and skip the verification step of lockout/tagout.

What to do instead

Apply lock and tag, then verify zero energy at the point of work with a tested meter and attempt a start (try-out) to confirm isolation before touching conductors.

Mistake 6

Routes intrinsically safe and non-intrinsically-safe conductors in the same conduit or tray without separation, and omits the required seal at the enclosure entry.

The candidate focuses on getting the signal to the panel and treats area classification and sealing as paperwork rather than installation requirements.

What to do instead

Keep IS circuits physically separated and identified per the design, install seals within the distance the code and drawings require at the enclosure entry, and confirm the barrier or isolator rating matches the field device before terminating.

Mistake 7

Installs a magnetic flowmeter in a vertical line with downward flow or at the high point of a run, and ignores upstream and downstream straight-run requirements.

Candidates match the pipe size and flange rating and stop there, forgetting that electrode orientation and full-pipe conditions determine whether the meter reads at all.

What to do instead

Mount so the electrodes stay on a horizontal axis, in a section that remains full of liquid, with the specified straight run upstream and downstream, and verify the grounding rings or straps are installed.

Mistake 8

Installs a thermowell or RTD with only a short insertion depth so the sensing element sits near the pipe wall or in the wake of the well.

Candidates size the thread and length to what fits the fitting rather than to the immersion needed to see the true process temperature.

What to do instead

Select the well and sensor length so the sensing element reaches the process stream, generally well past the pipe wall and toward the centerline, and use a spring-loaded or conductive-seated sensor so it bottoms in the well.

Mistake 9

States that a reverse-acting controller increases its output when the process variable rises above setpoint.

Direct and reverse action are memorized as labels rather than as a direction of output change, so they get swapped when phrased in words instead of a diagram.

What to do instead

Reason from the output: direct acting means output rises as PV rises; reverse acting means output falls as PV rises. Confirm the controller action, transmitter action, and valve fail position together as one consistent loop.

Mistake 10

Replaces the transmitter as the first step when a loop reads wrong, without checking the impulse lines, wiring polarity, power supply, or the control-system input.

The device is visible and easy to swap, so the candidate jumps to the least likely cause and skips the divide-the-loop troubleshooting sequence.

What to do instead

Work from the ends inward: confirm the process condition, verify power and signal at the terminal with a loop calibrator, then check the impulse line or tap for plugging, and only then condemn the instrument after a bench check.