Confined-Space Entry on Ballast Tank at Pier 7

NCCER Maritime · Put your knowledge to work in context.

All case studies

Confined-Space Entry on Ballast Tank at Pier 7

At 06:40 on a clear, 8°C morning, a deck crew at Pier 7 is scheduled to enter the forward ballast tank of a 180-ft deck barge through a 22-in manhole. The tank is 9 ft deep and was cleaned three days ago. The task is to inspect corrosion and weld a doubler plate. The initial reading at the manhole is O2 19.4%, LEL 4%, H2S 3 ppm, CO 12 ppm. A 900-cfm blower is running with 15 ft of duct, but the duct outlet stops 2 ft above the tank bottom. Two workers plan to enter with 30-min escape packs. The ladder has two rusted rungs. The attendant is a second-year apprentice who is also assigned as fire watch for hot work on deck. No retrieval tripod is set up. At 06:45 the general foreman says, "Those numbers are close enough; we need the tank back by 14:00."

1. Should the crew authorize entry at 06:45? State the decision and the specific readings, equipment, and staffing facts that drive it.

Read the worked answer

Decision: do not authorize entry at 06:45. The controlling fact is O2 at 19.4%, below the usual 19.5% minimum; "close enough" is not an acceptable entry criterion. The reading was taken at the manhole, not at the bottom, and the blower duct terminates 2 ft above the bottom, so the lower tank may be worse. The 4% LEL and 3 ppm H2S are below common entry limits, but they do not cure the oxygen deficiency, and hot work may require a lower LEL and a separate hot-work permit. The rusted ladder, lack of retrieval tripod, and dual-role attendant are independent deficiencies. The entry supervisor should stop the job, ventilate with the duct extended to the bottom, and re-test at top, middle, and bottom before reassessing.

2. If the tank is re-tested and entry is later approved, what controls and rescue arrangements must be verified before the first worker breaks the plane?

Read the worked answer

Before entry, verify: (1) energy isolation and line blanking; (2) ventilation reaching the bottom and continuous mechanical ventilation; (3) gas test at multiple levels after purging, with O2 19.5–23.5%, LEL within the entry permit (and hot-work permit, often lower), H2S and CO within site limits; (4) continuous personal monitors with alarm; (5) full-body harness, retrieval tripod/winch, and a rescue plan with trained rescuers; (6) repaired ladder and safe access; (7) dedicated attendant with no other duties; (8) communications and a means to summon rescue; (9) hot-work permit, fire watch, and fire extinguishing equipment for the welding; (10) pre-entry briefing. If any item is missing, no entry.

3. How should the attendant/fire-watch conflict be resolved, and what should happen if the general foreman repeats the instruction to enter?

Read the worked answer

The apprentice cannot be both attendant and fire watch. Assign a dedicated attendant at the entry and a separate fire watch outside the tank; if staffing is not available, stop. If the general foreman repeats the instruction, the entry supervisor should exercise stop-work authority, refuse the entry, and escalate to the safety manager/competent person. Document the refusal, the readings, and the instruction. Do not let schedule pressure turn a known oxygen deficiency into a "close enough" entry.