NCCER Pipefitter · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Pipefitting

  • Map the NCCER Pipefitting level structure and list every module title you must cover, then rank them by how heavily they are tested

  • Define and correctly use the core terms: nominal pipe size, schedule, wall thickness, inside/outside diameter, and pressure rating

  • Identify the major pipe materials (carbon steel, stainless, copper, PVC, CPVC, cast iron) and state one common service application for each

  • Read a basic isometric drawing and trace a single line from source to termination while naming each fitting on the run

Your checkpoint

A one-page material-and-terminology reference sheet plus a hand-traced isometric marked with every fitting labeled

Week 2

Pipefitting

  • Calculate take-out (fitting allowance) for 90-degree and 45-degree elbows using center-to-end dimensions

  • Compute true offset, travel, and run for 45-degree offsets using the 1.414 and 1.0 multipliers

  • Lay out and mark a simple two-elbow offset on pipe using a tape, square, and soapstone

  • Explain how thread engagement and makeup affect measured pipe length for threaded assemblies

Your checkpoint

A worked calculation packet of five offset problems with a marked-up pipe section showing your layout lines

Week 3

Pipefitting

  • Describe the steps to cut, ream, and thread carbon steel pipe with a power threader, including lubrication and die adjustment

  • Identify thread types and inspect a threaded connection for proper engagement and hand-tight makeup

  • Assemble a screwed joint and a grooved joint and state the torque or inspection criteria for each

  • List the safety controls for threading and cutting operations, including guarding, eye protection, and chip handling

Your checkpoint

A written assembly procedure for one threaded and one grooved joint, signed off against a self-made inspection checklist

Week 4

Pipefitting

  • Lay out and fit a socket-weld and a butt-weld joint, including root gap, alignment, and tacking sequence

  • Identify common weld defects visible on a completed joint and state the cause of each

  • Explain preheating, fit-up tolerance, and the role of the weld procedure specification on a job

  • Perform a pressure-test setup plan for a small spool, including test pressure and vent/drain points

Your checkpoint

A fit-up and inspection checklist completed for a mock butt-weld spool, with a defect-cause table

Week 5

Pipefitting

  • Calculate support spacing and select hangers and supports for a horizontal and a vertical run

  • Explain expansion and contraction and size an expansion loop or offset for a given temperature change

  • Identify the purpose of guides, anchors, and spring hangers and where each belongs on a run

  • Read a piping and instrumentation diagram and locate valves, strainers, and supports on the line

Your checkpoint

An annotated line sketch showing supports, anchors, and one expansion offset with the supporting calculation

Week 6

Pipefitting

  • Identify valve types (gate, globe, ball, butterfly, check) and match each to its typical service and flow characteristic

  • Describe proper valve installation orientation, stem position, and accessibility requirements

  • Explain hydrostatic and pneumatic testing procedures, including safety differences and acceptance criteria

  • Outline the steps to flush, clean, and commission a newly installed piping system

Your checkpoint

A valve-selection and testing matrix covering five valve types with installation notes and test method for each

Week 7

Pipefitting

  • Apply rigging basics: determine load weight, select slings, and identify the center of gravity for a pipe spool lift

  • State the hand-signal and communication requirements for a lift and the conditions that stop a lift

  • Explain confined-space entry and hot-work permit requirements relevant to pipefitting tasks

  • Review lockout/tagout and pressure-release steps before breaking into an existing line

Your checkpoint

A job-hazard analysis for a simulated spool installation covering lift, hot work, and line break

Week 8

Pipefitting

  • Work through timed practice sets across all topics and log every missed item by cause

  • Re-derive the offset and take-out formulas from memory without reference

  • Explain the full sequence of a piping installation from drawing review to commissioning in your own words

  • Identify your three weakest subtopics and build a targeted review list for each

Your checkpoint

A timed practice test score report with a written remediation list of your three weakest subtopics

Milestones

Week 2: Complete three offset problems from scratch with correct travel and run values within 15 minutes total

Week 4: Explain the fit-up sequence for a butt-weld joint and name three weld defects with causes, without notes

Week 6: Match five valve types to their services and state the correct test method for a small system

Week 8: Score at least 80 percent on a timed mixed-topic practice set and produce a remediation list