NCCER Scaffolder study materials
NCCER Scaffolder study resources

NCCER Scaffolder study plan

NCCER Scaffolder · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Load Capacities, Foundations, and Structural Principles

  • Define and distinguish dead load, live load, impact load, and rated working load for a scaffold platform

  • Calculate total platform dead load for three given scaffold configurations using component weights

  • Apply the 4:1 design safety factor to derive allowable working loads for light-, medium-, and heavy-duty scaffolds

  • Trace and label the complete load path from platform deck to base plate to ground, naming each transfer point

Your checkpoint

Completed load-calculation worksheet with 10 problems solved and work shown, scored at 80% or better on the self-check key

Week 2

Load Capacities, Foundations, and Structural Principles & Scaffold Safety Fundamentals and Hazard Awareness

  • Calculate required mudsill bearing area from leg load and soil bearing capacity for five site scenarios

  • Evaluate five site conditions and classify each soil or support condition as adequate, requiring remediation, or reject

  • Sequence the foundation preparation steps for a multi-level tower on sloped ground

  • List and explain at least 15 hazard categories, including electrical, struck-by, fall, overhead-power-line, and weather hazards

Your checkpoint

Foundation plan sheet covering three scenarios (bearing check, mudsill sizing, drainage and leveling) plus a 20-item pre-erection hazard checklist

Week 3

Erection, Dismantling, and Alteration Procedures

  • Sequence frame scaffold erection from base plates through bracing, tie-in, platform, and guardrail installation

  • Write a dismantling sequence that reverses erection while maintaining fall protection at every stage

  • Differentiate alterations that require competent-person redesign from those permitted by the manufacturer

  • Describe safe procedures for erecting near energized lines and for rigging a gin wheel for material hoisting

Your checkpoint

Written erection sequence and written dismantling sequence for both frame and tube-and-clamp scaffolds, checked against a 15-point rubric

Week 4

Erection, Dismantling, and Alteration Procedures & Scaffold Components, Materials, and Fittings

  • Match 20 scaffold components (base plate, sill, ledger, transom, bearer, putlog, tie, brace, coupler, guardrail, toe board) to function and location

  • Inspect fittings and tubing for wear, cracks, and deformation, and apply rejection criteria

  • Sequence three alterations: adding a stair tower, extending a run, and removing a bay

  • Explain tie patterns, tie spacing, and the conditions that require additional ties

Your checkpoint

Timed 40-question quiz covering Domains 2 through 4 scored at 80% or better, plus a spoken 10-minute walkthrough of an erection sequence without notes

Week 5

Scaffold Components, Materials, and Fittings

  • Label 30 scaffold components from photographs or physical parts and state each one's rated use

  • Differentiate swivel, right-angle, sleeve, and reduction couplers by application and load rating

  • Compare frame, tube-and-clamp, system, and rolling tower scaffolds by capacity, bracing, and typical application

  • Apply inspection and rejection criteria to planks, decks, and damaged tubing

Your checkpoint

Forty-card component flashcard deck plus a component identification quiz scored at 90% or better

Week 6

Inspection, Access, Fall Protection, and Regulatory Compliance & Scaffold Safety Fundamentals and Hazard Awareness

  • Apply access requirements for ladders, stair towers, maximum platform gaps, and rest platforms

  • Select the appropriate fall protection method (guardrail, personal fall arrest, or net) and calculate anchor point and lanyard requirements

  • Conduct a mock inspection using a 25-point checklist and document each deficiency with a citation and corrective action

  • State minimum approach distances to overhead power lines and explain the scaffold tag system

Your checkpoint

Mock inspection report documenting 10 deficiencies with correct citations and corrective actions

Week 7

Inspection, Access, Fall Protection, and Regulatory Compliance & Scaffold Safety Fundamentals and Hazard Awareness

  • Summarize regulatory requirements for capacity, platform construction, and training of scaffold users

  • Differentiate the duties of the competent person, qualified person, erector, and user

  • Explain when re-inspection and re-tagging are triggered, including after weather events and alterations

  • Draft a training outline for scaffold users covering hazards, access, and fall protection

Your checkpoint

One-page regulatory quick-reference sheet plus a 25-question regulation quiz scored at 85% or better

Week 8

Scaffold Safety Fundamentals and Hazard Awareness & Scaffold Components, Materials, and Fittings & Load Capacities, Foundations, and Structural Principles & Erection, Dismantling, and Alteration Procedures & Inspection, Access, Fall Protection, and Regulatory Compliance

  • Complete two full-length practice exams and trace every missed item to its root cause

  • Re-drill the two weakest domains with targeted practice sets

  • Recite from memory the load formulas, tie spacing rules, and clearance distances

  • Simulate a practical walkthrough covering erection, inspection, and dismantling decisions

Your checkpoint

Two full-length practice exams scored at 85% or better, an error log of every missed question, and a one-page numbers cheat sheet written from memory

Milestones

Week 2: Correctly solve 8 of 10 load and foundation problems cold, with no reference sheet

Week 4: Score 80% or better on the 40-question Domains 2 through 4 quiz and deliver the erection walkthrough without notes

Week 6: Produce a mock inspection report with all 10 deficiencies correctly cited and corrected

Week 8: Score 85% or better on two consecutive full-length practice exams with every missed item logged and reworked